Summary
Overview
Work History
Skills
Certification
Timeline
Generic

Ryan Carlo Cruz

Lockhart,NSW

Summary

Dynamic Transmission Lineworker with extensive experience at Elecnor Australia, excelling in transmission line installation and stringing works. Proven ability to enhance worksite safety and organization while collaborating effectively with teams. Skilled in operating EWP up to 70 metres, ensuring high-quality project execution and compliance with safety standards.

Overview

6
6
years of professional experience
1
1
Certification

Work History

Transmission Lineworker,Construction Rigger

Elecnor Australia
Camp 2 PO Box 20 Lockhart Rd, NSW
01.2024 - Current
  • Installed and maintained overhead transmission lines following safety protocols.
  • Apply work health and safety regulations.
  • Assembled various types of hardware such as bolts, nuts, clamps and anchors used in line construction.
  • Clamping in of quad conductor manually and using EWP.
  • Back-hanging insulators.
  • Ensured proper handling of materials and tools during project execution and cleanup.
  • Installed new transmission line hardwares, insulators, conductors and other components.
  • Assembly and erection of new transmission lines tower following of VSQ,VTR,VTQ.

Lineworker

Miescor builders
Quezon City, Metro Manila,Philippines
08.2019 - 11.2023
  • Inspected materials for quality and compliance with safety standards.
  • Maintenance of lines, Construction of new lines.
  • Dismantling of old lines hardware, monopoles, and towers
  • Reported issues or defects in materials to supervisors promptly.
  • Maintained a clean and organized work area for safety and efficiency.

Skills

  • Transmission line installation
  • Stringing works
  • Operating of EWP up to 70 Metres
  • Manual Climbing
  • Worksite Safety and organization
  • Project documentation and job planning
  • Team collaboration and communication

Certification

  • High voltage cable splicing and termination
  • Australian Drivers license
  • High risk work
  • CPR
  • VOC Portable capstan and Hydraulic winch
  • 4-wheel Drive Course
  • Tower and EWP rescue
  • Dogging
  • EWP (boom length 11metres or more)

Timeline

Transmission Lineworker,Construction Rigger

Elecnor Australia
01.2024 - Current

Lineworker

Miescor builders
08.2019 - 11.2023
Ryan Carlo Cruz