Results-oriented Project Engineer with 10 years of experience designing and implementing Utility projects. Successful in determining project scope, creating project parameters, designing technical drawings to meet objectives and building project deadlines that lead to on-time completion. Proficient communicator in working with teammates to solve problems that arise during implementation.
Overview
14
14
years of professional experience
Work History
Project Engineer (Utilities)
DT Infrastructure (Djillang Alliance)
12.2022 - Current
Working closely with different USPs and relocating their respective assets
Successfully relocated 850m of 450mm MSCL water-main, 400m of 150mm Steel Gas Main, Telecommunication networks (nbn, Telstra, Optus, TPG and iinet) and Power (Powercor)
Experience in relocating Gas and Water through Micro Tunnelling
Successfully ran risk assessment with V/Line and was able to achieve desired outcome, which proved beneficial for entire project
Collective responsibility to implement and contribute to the development of regional plans / initiatives to support strategic plans/ objectives
Lead and manage people/ the business / projects
Plan, coordinate and administer construction engineering activities to ensure that the project is delivered in accordance with time, budget and quality requirements
Effectively manage and monitor construction performance and progress
Preparation of progress and compliance reporting
Interpret designs for construction implementation and contribute to improvements to existing designs
Coordinate and supervise technical aspects of the project
Assist with the preparation of site construction budgets and reports
Verification of subcontractors' claims and variations
Effective management of work programs and performance of teams and subcontractors to achieve project outcomes
Execute a working knowledge of contractual and legislation relevant to the project
Execute a comprehensive working knowledge of construction engineering and Australian / International Standards
Execute a working knowledge of Temporary Works legislation & management
Ensure team members understand BU/Divisional objectives, their part in them and are focused on development/delivery of their own relevant plans
Manage and lead personnel; prioritize work efficiently
Prepare accurate and timely narrative monthly reports that contain movements and progress
Implement effective internal auditing
Provide accurate monthly accounts and reports on the performance of the business unit/project scope
Avoid adversely affecting the safety or health or any other person through an act or omission at work
Effectively implement and follow DEW accounting and other policies and procedures (ZH, HR, Quality)
Prepare SWMS / adhere to Temporary Works Procedure
Lead by example and continually promote relevant aspects of Zero Harm when engaging with operational teams
Ensure all employees and contractors within their area/s of control receive appropriate training to perform their work in a safe, legal and competent manner including any OHS and site-specific inductions and accountabilities have been defined and communicated
Regular monitor, communicate and initiate safety, quality and environmental processes within their area/s of control, including toolbox meetings, inspections, and the identification, assessment and control of risks; promote the reporting of incidents, near misses, hazards, non-conformances, system improvements and customer complaints and ensure corrective actions are implemented in a timely manner.
Senior Project Engineer
Abergeldie Complex Infrastructure
08.2021 - 11.2022
Working closely with various clients Yarra Valley Water, Greater Western Water, Southern East Water
Managing a team of 8 people including Engineers, Supervisors and a graduate engineer
Daily monitoring of works and tracking the productivity of crews on a day-to-day basis
Monthly update to the HSEQ manager regarding OH&S incidents and audits taken place
Managing budgets for individual projects and tracking them on a regular basis
Presenting revenue forecast to the management for every month
Presenting CFO, executive general manager, general manager and financial manager with monthly financial results
Generating flow management plans for larger than nominal diameter assets
Provide quarterly financial forecast to individual clients and update the forecast monthly
Generate monthly financial reports and presenting them to CFO, GM and national services manager
Liaising with IFS specialist and assistant GM in development of an efficient process on IFS
Mentoring graduate engineers and project engineers
Assisting project manager in Tendering process and submitting variation requests
Performing HSEQ audits on a weekly basis
Assisting the team with weekly scheduling of works
Creating a 6-week program to close out legacy works and presenting to the client
Achievements: 2 major projects delivered to the client with Abergeldie making a profit margin of 30%.
Project Manager
Cablenet industries Pty. Ltd.
09.2019 - 08.2021
Project Manager for various client like Optus, TPG, West Gate Tunnel and VicTrack (Right from tender to project completion)
Major contribution in WBHO (Western Road upgrades) and West Gate tunnel within the utilities space involving quoting and completing the project in its desired timeframe and keeping the budget in mind
Provide guidance and support to construction team to ensure delivery of key milestones
Oversee project on a monthly forecast review process
Ensure project resources (plant, labor, materials, subcontractors) are optimized across the construction activities
Lead a safety culture focused on zero harm to the community, workforce and environment
Scheduling of works on a weekly basis
Ensure the construction team, including the subcontractors, implement and maintain safe work methods using the systems and procedures defined in the project's Construction Health and Safety Management Plan
Ensure the works are constructed in accordance to design
Ensure all decisions are made within a best-for-project mindset aligned with project's commercial framework
Promote and maintain the values of open, honest and responsible communication within the team and with all project stakeholders
Ensure all facets of project management system are implemented and maintained
Provide closeout documentation in accordance with the completion plan
Lead the construction team by example, maintaining a high standard of work practices and ensure safety, integrity, respect and confidentiality
Build collaborating relationships across senior management team to ensure best-for-project decisions and outcome
Conducting pre commencement meetings and prepare/distribute associated documents
Competently complete KPI reviews and KPI distribution
Conduct procurement activities, including the accurate and timely raising of Purchase orders
Achievements: As a newly appointed Project Manager I was able to improve the processes and policies in the company to achieve a streamlined project delivery standard and because of this process I was able to bring the company amongst the top 3 Vendors on the Optus and TPG vendor panel
As a result of this the company was awarded more works and was able to secure contracts with WBHO and West Gate Tunnel
One of the major improvements contributed was the delivery of projects to our clients within the desired time frames whilst maintaining the budget of the project.
Field Manager
Visionstream
03.2018 - 08.2019
Responsible in managing a Project end to end
Maintaining a daily project register to update the progress of works
Responsible in taking decisions to complete a job while keeping the budget of the project in mind
Managing multiple Contractors on a day-to-day basis
Scheduling of works on a weekly basis
Acting as a SME for contractors on the field
Constantly liaising with the Project engineers and the design team to find solutions and help them find solutions
Regular weekly meeting with Construction managers and Superintendents addressing the key focus points of the project and updating them of the progress
Once a Month toolbox talks with the contractors addressing HSE issues and other components of the project
Liaising with the local council and making sure the reinstatement quality is up to the mark
Dealing with customer complaints and resolving them with the best interest of the customer
Achievements: Successfully delivered 3 major projects which were under my jurisdiction within the timeframe to the client with minimal defects.
Project Construction Supervisor
Servicestream
03.2017 - 02.2018
Worked on the FTTB project in the Melbourne CBD area
Responsible for scoping out the entire SAM before handing them over to the subcontractors
This helped in scheduling the works
Responsible in managing multiple subcontractors and making sure the project runs smoothly
Responsible in answering queries related to Fiber Jointing, Hauling, FTTB cabinet installation, Civil works and Electrical works
Responsible is validating the Designs Packs from Telstra and making sure they can be built
Any variations in design were made a note of and updated on the ASBUILTS
Has vast knowledge of the specifications of the various types of cabinets used in the FTTB build
Basic knowledge of the electrical aspect of the FTTB build For Example: Metered or un Metered solution
Created an FTTB install guide so that it can be forwarded to the various building managers
Worked closely with the quality engineers to improve the quality inspections on the FTTB cabinets
Was responsible for handling 3 SAMs at the same time and made sure all the 3 SAMs were submitted prior to the deadline
Constant Safety Audits were performed on Subcontractors and was made sure the work locations are safe to work
Conducts Toolbox meeting every Monday with crews
Was the point of contact for nbn supervisors and made sure all their issues were resolved within a fixed timeline
Good relationship with nbn employees including Senior Field Supervisor, Project Coordinator, and Project Officer
Worked closely with TCS and nbn in creating new FTTB designs for future releases
Achievements: Ever since I was introduced into the company, I was handed a project which was a new technology for everyone including myself
Despite the challenges, I was able to get my knowledge of the new technology up to scratch and was able to represent myself to the client on behalf of the employer
Since the project was in Melbourne CBD, the Land Access team was struggling to portray the technology to a lot of building managements, I was able to create a pack for the land access team which they could pass on to the building management for a better understanding of the works.
Construction Supervisor/Engineer
STK Logistics
09.2016 - 02.2017
Worked on the FTTN project with Tier 1 company Broadspectrum & ServiceStream
Responsible in managing 10 crews including FTTN Civil, FTTN Copper, ACM pit removal
Conducted site safety and quality audits, vehicle safety and quality checks
Conducted random alcohol and drug tests on contractors
Responsible in interaction with Field Supervisors, Project Engineers, and Area manager
Preparing material request forms for contractors
VOC in signing off Excavation permits
Responsible for looking after site safety and setup during ACM activities
Responsible in conducting quality checks and testing of Simplex Copper
Responsible in conducting quality checks on FTTN civil Crews and ACM crews
Responsible in Pre Scoping of work and reading NBN construction maps
Conducts Tool Box meeting every Monday with crews
Good understanding of BOQ and Submission of Claims
Responsible for scheduling of work and making sure deadlines are met
Achievements: Successfully delivered 3 major projects which were under my jurisdiction within the timeframe to the client with minimal defects.
NBN FTTN Contractor
STK Logistics
01.2016 - 09.2016
Worked on the FTTN project with Tier 1 company Lend Lease
Excellent knowledge of Telstra and NBN Pit and Pipe specification
Ability to read DBYD plans
Ability to conduct site Audits regarding site safety and quality check
Excellent knowledge of FTTN civil aspects
Knowledge of Simplex copper
Experience in hauling cables
Experience in Roding and Roping
Excellent management skills
Ability to handle 8 Crews simultaneously
Good understanding of BOQ and Submission of Claims.
NBN FTTP Contractor
STK Logistics
01.2015 - 12.2015
Worked on the FTTP project with Tier 1 companies like Tech2Home and Visionstream
Worked as a part of the Hauling crew with Tier 1 company Excel Galaxy
Responsible for dealing with customers
Ability to read the NBN construction drawing plans
Applying DBYD and understanding them before work commencement
Service location the assets (Water, Gas, Power, Telstra)
Operating underground boring machine
Concrete breakout and reinstatement
Asphalt breakout and reinstatement
Installation of new pits and pits over existing network
Good understanding of the specifications related to Telstra and NBN Pit and Pipe installation
Excellent communication skills
Was responsible for managing 6 crews of 3 people simultaneously
Conducted quality checks and safety audits
Excellent knowledge of OH&S
Was responsible for implementing Traffic scenarios on site
Responsible for safe site setup.
Laborer
STK Logistics
08.2014 - 12.2014
Worked on the FTTP project with Tier 1 company Downer
Picked up skills like Service Locating, operating an Underground Boring machine
Fixed blockages on the network
Installed new pits as well as pits over existing network
Developed skill in concreting
Performed rodding and roping on the networks
Learnt how to read DBYD.
Direct Sales Representative
DMC Group
02.2014 - 07.2014
Outstanding experience in direct sales and telemarketing
Ability to maximize sales activity and increase penetration of all products
Ability to turn-in of orders and monies collected in the field
Ability to implement and maintain an effective referral network and call program to promote sales
Ability to manage multiple projects and deadlines simultaneously
Strong marketing and business development skills
Nurtured relationships with prospects and existing customers and ensured customer satisfaction.
Senior Design Engineer
KPIT Technologies Ltd.
04.2013 - 11.2013
Design and detailing (related to SCR/DPF, Battery Box, DEF tank), following required standards
Interaction with customer/onsite engineer on a regular basis to understand their processes & design requirements
Taking responsibility of the team, during the absence of the team leader, for assigning work, estimating effort and schedule for assigned tasks and scheduling deliveries
Responsible for carrying out RCA (Root Cause Analysis) and taking corrective actions
Interaction with FEA team, understanding the problems in the structural design and make changes according to the FEA results
Creating a simplified model in order for the FEA team to carry out meshing and analysis
Communication with the client for any query or issue, as much as possible with possible solution
Creating/updating checklist for quality checks of the drawings and conducting drawing QC
Preparing training material and imparting training to new members in the team
Active team member in design support and process implementation
Making the team aware of updates in standards from customers
Achievements: Contributed to the team achieving Customer satisfaction award twice in a row (the award was given for excellent quality of drawings delivered right on time).
Onsite Engineer
KPIT Technologies Ltd.
05.2012 - 03.2013
Discuss technical requirements with the customer - Peterbilt team had 18 engineers
Analyze the work and perform detailed Work Breakdown and collect as much inputs as possible - this may require visiting the assembly line to understand the manufacturing & assembly process
Prepare necessary instructions for the offshore team (6 engineers) located in India in order to complete the work, along with expected efforts
Coordinate with the offshore team and ensure timely delivery and quality
Once the client approves the work, release the drawing for manufacturing process
Interact with customer in FEA projects, where the work was assigned to the offshore team for carrying out FEA analysis
In addition to daily engineering change management, handling new product development tasks
Achievements: Designing a totally new DEF tank for the new generation trucks for Peterbilt
The project involved designing a DEF tank which could be mounted behind the front wheel mudguard instead of mounting behind the sleeper on the chassis
This way the DEF tank would be totally hidden from the outside and improved the aesthetics of the truck
Other benefits included more mounting space for SCR/DPF box, Battery Box & Fuel Tank.
Design Engineer
KPIT Technologies Ltd.
03.2010 - 04.2012
Design and detailing work assigned (related to Exhaust Muffler), following all required standards and promoting in PDM and PLM
Interact with customer on a regular basis to understand their processes & design requirements
Communicate with the client for any query or issue, as much as possible with possible solution
Achievements: Received award for excellence in single-handedly managing the UK Emissions solutions project with excellent quality of drawings delivered right on time
Contributed to the team achieving a satisfactory customer award presented by the customer for delivering drawings of excellent quality by the desired time.
Education
Bachelor of Engineering - Mechanical
Pune University
Pune, India
2009
Skills
Experience in Telecommunications and Mechanical Engineering
Knowledge of AS/NZS 3000:2007 Wiring Rules
Knowledge of AS/CA S0009:2013
Knowledge of MRWA standards
Knowledge of NBN STD-0001 Engineering, design and construction standards
Extensive knowledge in Civil Construction
Excellent Excel and MS Project Skills
Provide IT solutions & good data analytical skills
Project management and reporting
Agile Methodology
Strong Financial acumen
Good stake holder/ contractor relation
Experience in Tender management
Scheduling, Forecasting of resources
Excellent knowledge of Utilities and Infrastructure
Good knowledge of WHS management
Excellent communication skill
Timeline
Project Engineer (Utilities)
DT Infrastructure (Djillang Alliance)
12.2022 - Current
Senior Project Engineer
Abergeldie Complex Infrastructure
08.2021 - 11.2022
Project Manager
Cablenet industries Pty. Ltd.
09.2019 - 08.2021
Field Manager
Visionstream
03.2018 - 08.2019
Project Construction Supervisor
Servicestream
03.2017 - 02.2018
Construction Supervisor/Engineer
STK Logistics
09.2016 - 02.2017
NBN FTTN Contractor
STK Logistics
01.2016 - 09.2016
NBN FTTP Contractor
STK Logistics
01.2015 - 12.2015
Laborer
STK Logistics
08.2014 - 12.2014
Direct Sales Representative
DMC Group
02.2014 - 07.2014
Senior Design Engineer
KPIT Technologies Ltd.
04.2013 - 11.2013
Onsite Engineer
KPIT Technologies Ltd.
05.2012 - 03.2013
Design Engineer
KPIT Technologies Ltd.
03.2010 - 04.2012
Bachelor of Engineering - Mechanical
Pune University
Similar Profiles
Pavan Kalyan GudivadaPavan Kalyan Gudivada
Site Engineer at DT InfrastructureSite Engineer at DT Infrastructure
Recruitment Consultant at Economic & Social Infrastructure Program -DT Global International DevelopmentRecruitment Consultant at Economic & Social Infrastructure Program -DT Global International Development