To obtain an experience while performing a challenging position in a high quality engineering environment where I would gain resourceful experience. Looking forward to be placed in a company in which I can use my technical skills and quick learning qualities to the upliftment of the company and my personal growth
Tata Motors Ltd., 6 Months, Plan For Every Part, Fork Lift Mapping, Hazard Identification and Risk Assessment, To improve part tracking and reduce line side inventory., Standardization of part flow system., Reduce number of fork lift and modified the loading of forklift for uniform distribution., To consistently control the risk to employees, to the public and to the environment within organization's tolerance limit, Excellence award was awarded by the Deputy Manager (HR) for work done in various projects
Engineering Australia, 2019, current
Capstone Project Optimized the system to suit our particular needs. Proto Model was assembled. Lead a Team of 7 members. Designed and developed the whole system starting from scratch. Bench Vice Fabrication of a Bench Vice using welding and machining Roman Mongonel Static and Dynamic Analysis of Roman Mangonel. Designed a Roman Mangonel using Designing and 3-D Modelling Software CREO and static and dynamic analysis was done on the individual parts and the assembly. Modelling and simulation of quadcopter A simulation study for control of hydrogen fuel cell