I am a career oriented electrical and railway signaling engineer, who has a strong background with electrical power distribution as well as railway signaling and its application. Energetic, driven, and accomplished signaling engineer with 7 years' experience in Electrical engineering project management including 4 years Signalling and power distribution scope construction management and planning. Business strategist: assist with planning and managing multimillion-dollar projects aligning with the business goals and achieving bottom-line gains. Excellent communicator: leverage technical, business, and financial acumen to communicate effectively with various stake holders and their respective teams. I am a Team-oriented individual with strengths in analytical problem solving and collaborating across diverse groups. I am happy to relocate based on the project requirement.
Cross River Rail Project, Queensland, Queensland, Australia, 10/03/23, Present, Rail Integrated System project in Queensland is part of the Cross River Rail projects. It involves upgrading and integrating various rail systems to improve network efficiency, safety, and capacity. This includes modernizing signaling systems, enhancing communication infrastructure, and implementing advanced control systems. The project focuses on optimizing train operations, reducing delays, and improving overall rail performance while ensuring seamless integration of existing rail infrastructure with new technologies. Additionally, it aims to enhance passenger experience and operational safety across the rail network in Queensland. Webb Street Level Crossing Removals, 05/01/22, 09/30/23, This project is to remove Webb Street level crossing and build a new station, relocate the DTRS building and build a new tower, and relocate the ABMS which is highly sensitive measurement system that collects the acoustic signature of each bearing of a passing train at Pakenham line, as well as upgrading the signaling system and railway system in general. Port Rail Shuttle Network (PRSN), 05/01/22, 09/30/23, This project is to build a new route for trains coming in and out of port Melbourne to the existing network. Cranbourne Line Upgrade (CLU), 03/05/21, 05/01/22, The project was to remove 3 x level crossings and upgrade Camm's road level crossing as well as duplicating the rail and upgrading the signaling system over Cranbourne line.