Summary
Overview
Work History
Education
Skills
Websites
Accomplishments
Languages
References
Timeline
Generic
Sakhawat Saleem

Sakhawat Saleem

Armadale,Australia

Summary

  • I consistently completed set of projects under the planned budget and ahead of proposed schedule.
  • Enthusiastic and efficient, with a positive can-do attitude.
  • Proficient in planning, execution and coordination of engineering projects.
  • Excellent communication skills with ability to understand complex, technical information and interpret in a hasty manner.

Overview

3
3
years of professional experience

Work History

Project Engineer

Prime Tech General Contracting LLC
ABU DHABI , UNITED ARAB EMIRATES
2021.12 - 2023.12
  • Managed subcontractors, a 200-Persons team and 50 million AUD worth of equipment and supplies on various construction projects
  • The scope of work includes design and construction of road infrastructure and bulk earthworks
  • Roles Included: Ensure all jobs were done in accordance with work safety standards
  • Liaising with the planning, resourcing and recruitment teams for the mobilization and labor requirements
  • Taking necessary measures to achieve project key performance (KPI's)
  • Liaising with Technical manager for the preparation and consultant approvals of shop drawings and as built drawings
  • Preparation of ITR's, checklists and ITP's
  • Liaising with QA/QC team for the preparation of Method Statement, Material Inspection request, Material Submittals and project quality plan
  • Responsible for taking consultant approvals for ITR's and ITP's
  • Arranging required testing and commissioning for each utility to meet specified standards
  • Working closely with the construction and project manager to achieve project deliverables
  • Executing site activities in accordance with approved shop drawings and arrangement for consultant and client inspection
  • Plan, schedule, and monitor construction activities to implement the schedule, and being followed as per standards and specification.

Planning Engineer

Najah Contractors
LAHORE , PAKISTAN
2020.10 - 2021.11
  • Managed earthworks and civil works for Rainwater Management - Drainage Arrangement for Sore Point at Qaddafi Stadium, Lahore
  • Successfully completed the project under planned budget and timeframe worth of 22 million AUD
  • Roles Included: Development of detailed programs in line with the scope of works, as well as estimate
  • Develop, maintain, update, and control the project schedules including key milestones, resource & cost as per guidelines and best practices
  • Generate and monitor project cash flow, provide monthly forecast from project schedules
  • Prepare Project Schedules and generate Cashflows to be included in Proposal submission and during pre-construction stage
  • Update schedules with PM/PE's every week in a month, analyze progress and give inputs on the projects over all status
  • Prepare weekly and monthly reports including cost, EV / PV /PF performance and detailed insights as to project performance
  • Work with the site teams to ensure that resources are available in accordance with the resource plan
  • Assist with the maximization of plant, equipment, and labor utilization in conjunction with the Site Manager
  • Assist with implementation of systems, controls, and training to ensure labor productivity is within budget
  • Presenting schedule analysis to internal and external stakeholders as required
  • Analyzing deviations and proposed variations to evaluate impact on the project timeframe and resource requirements
  • Ability to analyze cost estimates and challenge labor productivity, rate allocation and provide cost savings
  • Work with Project Controls team to develop project reports and processes along with monitoring, recording and reporting project performance.

Education

Bachelor of Science - Mechanical Engineering

University of Management & Technology
Lahore, Pakistan
08.2020

Skills

  • Auto CAD
  • Primavera P6
  • SAP
  • MS Office

Accomplishments

  • Implementing non – conformance management system which reduced non – conformance by 50% and improved overall quality of project.
  • Successfully completed the project three months before the deadline.
  • Got employee of the year award in 2023.
  • Identified opportunities for cost savings and process improvements to enhance project profitability.

Languages

English
Full Professional
Urdu
Native/ Bilingual
Punjabi
Native/ Bilingual
Hindi
Full Professional

References

References available upon request.

Timeline

Project Engineer

Prime Tech General Contracting LLC
2021.12 - 2023.12

Planning Engineer

Najah Contractors
2020.10 - 2021.11

Bachelor of Science - Mechanical Engineering

University of Management & Technology
Sakhawat Saleem