Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Sam Gilbertson

Beldon,WA

Summary

Experienced in steel reinforcement and civil construction, with a strong understanding in interpreting civil construction drawings and executing tasks with precision and efficiency. Proven to be able to work long hours in demanding environments proficient in bending, cutting, and installing steel bars to meet project specifications, ensuring structural integrity and compliance with industry standards.

I demonstrate excellent teamwork and adaptability, effectively collaborating with other teams to address evolving project requirements. Focused on maintaining and fostering safe working environment and delivering high-quality results within set deadlines.

Overview

3
3
years of professional experience
1
1
Certification

Work History

Steelfixer

Verstile Steelfixing
11.2023 - Current
  • Worked FIFO based steel fixing on major projects across WA, including:
  • Main Roads WA New Brooking Channel Bridge Project (May 2024 to Current)
  • Rio Tinto Western Range Raw Water Storage/Fire suppression Tanks (February 2024 to July 2024)
  • Main Roads WA Northam-Cranbrook (M031) Bridge Replacements (December 2023 to February 2024)
  • Main Roads WA Fitzroy River Bridge Project (September 2023 to December 2023)
  • Skills include:
  • Team/Crew Leadership
  • Reading and interpretation of civil construction drawings
  • Practiced safe working methods through SWM/JHA creation
  • Ensured structural integrity by maintaining correct spacing between steel bars and ties according to specifications
  • Increased productivity through effective communication with team members and supervisors on project progress and potential issues
  • Tied rebar into wire mesh formations using wiring, and clipping techniques
  • Operated hand and power tools safely to prepare materials

Steelfixer/Concreter

Steelflecht
10.2021 - 11.2023
  • Worked Perth based steel fixing on projects, including:
  • Metronet Yanchep Railway Extension Project (July 2022 to September 2023)
  • Main Roads Tonkin Gap Project (February to July 2022)
  • Skills include:
  • Tied rebar into wire mesh formations using wiring, and clipping techniques
  • Placed/Finished concrete
  • Patched/Repaired concrete
  • Operated hand and power tools safely to prepare materials
  • Practiced safe working methods

Education

Completed High School -

Toodyay District Highscool
12.2021

Skills

  • Steel Fixing
  • Civil construction drawing interpretation
  • Team leader ship
  • Concerting
  • Construction safety

Certification

  • Construction Induction White Card, 10744796
  • High Risk EWP Licence, WL 3588991
  • Work Safety At Heights Ticket, RIIWHS204E

Timeline

Steelfixer

Verstile Steelfixing
11.2023 - Current

Steelfixer/Concreter

Steelflecht
10.2021 - 11.2023

Completed High School -

Toodyay District Highscool
Sam Gilbertson