Summary
Overview
Work History
Skills
Certification
Timeline
Generic

Sam Gilbertson

Beldon,WA

Summary

I am 22 years old experienced in steel reinforcement and civil construction, with a strong understanding in interpreting civil construction drawings and executing tasks with precision and efficiency. Proven to be able to work long hours in demanding environments proficient in bending, cutting, and installing steel bars to meet project specifications, ensuring structural integrity and compliance with industry standards.

I demonstrate excellent teamwork and adaptability, effectively collaborating with other teams to address evolving project requirements. Focused on maintaining and fostering safe working environment and delivering high-quality results within set deadlines.

Overview

4
4
years of professional experience
1
1
Certification

Work History

Steelfixer

Whittens Group
01.2024 - Current
  • Worked in civil construction, FIFO based steel fixing on:
  • Perdaman Urea Plant (January 2024- Current)
  • Skills include:
  • Team/Crew Leadership
  • Reading and interpretation of civil construction drawings
  • Practiced safe working methods through SWM/JHA creation
  • Directed on-site installation, bending and cutting of steel reinforcement. Coordinated a team to ensure precise placement and secure fixing of rebar, and adherence to project timelines
  • Increased productivity through effective communication with team members and supervisors on project progress and potential issues
  • Installed and secured steel reinforcement bars with precision to ensure structural integrity prior to concrete pouring
  • Operated hand and power tools safely to prepare materials

Steelfixer

Verstile Steelfixing
11.2023 - 10.2024
  • Worked in civil construction, FIFO based steel fixing on major projects including:
  • Main Roads WA New Brooking Channel Bridge Project (July 2024 to October 2025 )
  • Rio Tinto Western Range Raw Water Storage/Fire suppression Tanks (February 2024 to July 2024)
  • Main Roads WA Northam-Cranbrook (M031) Bridge Replacements (December 2023 to February 2024)
  • Main Roads WA Fitzroy River Bridge Project (September 2023 to December 2023)
  • Skills include:
  • Team/Crew Leadership
  • Reading and interpretation of civil construction drawings
  • Practiced safe working methods through SWM/JHA
  • Directed on-site installation, bending and cutting of steel reinforcement. Coordinated a team to ensure precise placement and secure fixing of rebar, and adherence to project timelines
  • Increased productivity through effective communication with team members and supervisors on project progress and potential issues
  • Installed and secured steel reinforcement bars with precision to ensure structural integrity prior to concrete pouring
  • Operated hand and power tools safely to prepare materials

Steelfixer/Concreter

Steelflecht
10.2021 - 11.2023
  • Worked on civil construction steel fixing projects, including:
  • Metronet Yanchep Railway Extension Project (July 2022 to September 2023)
  • Main Roads Tonkin Gap Project (February to July 2022)
  • Skills include:
  • Installed and secured steel reinforcement bars with precision to ensure structural integrity prior to concrete pouring
  • Placed/Finished concrete
  • Patched/Repaired concrete
  • Operated hand and power tools safely to prepare materials
  • Practiced safe working methods

Skills

  • Steelfixing
  • Civil Construction Drawing Interpretation
  • Concreting
  • Communication Skills
  • Worksite Safety
  • Teamwork

Certification

  • Construction Induction White Card, 10744796
  • High Risk EWP Licence, WL 3588991
  • Work Safety At Heights, RIIWHS204E

Timeline

Steelfixer

Whittens Group
01.2024 - Current

Steelfixer

Verstile Steelfixing
11.2023 - 10.2024

Steelfixer/Concreter

Steelflecht
10.2021 - 11.2023
Sam Gilbertson