Experienced Electrical Engineer with more than 7 years of expertise in power systems, HV/LV lines & substations working with Bhutan Power Corporation Limited (A Utility Company in Bhutan). I have worked on turnkey projects, where I gained comprehensive knowledge of project execution from Conception to Completion. I also have hands on experience working in construction company for over three years as an electrical project engineer overseeing the installation and commissioning works in a large-scale project. I am a team player with keen interest in learning new things and dealing with challenges systematically. I am experienced working fast paced environment under tight project budget and datelines.
Company Overview: Singye Construction Pvt Ltd is Construction company with more than 10 years of experience in Construction of Building, telecommunication, electrical infrastructures and more. It has made a steady growth in the sector through quality deliverables and professional work ethics. SCPL have un-matched reputation of executing and finishing every project before or on time
1. Design & Engineering of 33/11 kV GIS Substation at Tshongdue, Paro, Bhutan.
Year- January 2018
Contractor- Shyama Power limited, India
Main Project Features: 33/11kV GIS Substation
Position held: Design and Supervisor Engineer
· Designed 33kV Double bus bar Scheme GIS Substation
· Reviewed all equipment drawings
· Conducted load flow studies and short-circuit analysis using ETAP.
· Prepared estimates, BOQ and specifications.
· Monitored project through SAP Project System & Material Management.
· Supervised daily progress and reported to project Director
· Earthing Design
2. Design & Engineering of 66/11kV GIS Substation at Paro Pangbisa, Bhutan
Year: February 2020
Contractor: GE T & D India Limited
Main Project Features: 66/33kV GIS Substation
Position held: Design and Supervisor Engineer
· Designed 66kV Single bus bar Scheme GIS Substation
· Reviewed all equipment drawings
· Supervised daily progress and reported to project Director
· Earthing Design
3. Power supply to EV charging station at Thimphu, Paro & Wangdue Dzongkhag (Package: DW24-S1).
Year: February 2020
Contractor: Bhutan Engineering limited
Main Project Features: Quick charging substations & Distribution lines
Position held: Design & Supervisor Engineer
· Supervised daily progress and reported to project Director
· Earthing Design
4. Construction & Commissioning of 2X1000 kVA Unitized Secondary Substation (USS) and 11kV overhead line at Jigme Singey Wangchuk School of Law (JSWSL), Paro, Bhutan.
Year: February 2020
Contractor: Bhutan Engineering limited
Main Project Features: Unitized Substation & distribution lines
Position held: Design & Supervisor Engineer
· Supervised daily progress and reported to project Director
· Earthing Design
other Projects Handled:
1. Implementation of GPRS based Distribution Transformer (DT) Metering in 2016 in BPC (ESD
Paro) on pilot basis to monitor the actual losses, reliability and transformer health which has
improved the system efficiency by analysing the DT Metering data and taking necessary
actions against it.
2. Formulation of Distribution system master plan for 10 years (2020 to 2030) for Paro
Distribution system in consultation with various stakeholders and recommendations on how to
improve the system.
3. Construction & Commissioning of 11 kV line (AAAC -50 sq. mm), 11/0.415 kV, 16 kVA (2 nos.) at Bumdra and Choechongtshe, Paro, Bhutan & LV line (50 sq.mm).
4. Installation & Commissioning 3 & 4 Ways RMUs & ARCBs of different makes (NOJA Power, Schneider) along feeders to improve reliability.
5. Construction & Commissioning of Compact substations, Underground Distribution Cable Network System (XLPE cables) at Royal Academy, Paro, Bhutan.
6. Assessment of Power Quality for the Paro Distribution Network.