Summary
Overview
Work History
Education
Skills
Timeline
Generic

Sang Bak Lee

Summary

ce. Competent Boilermaker interpreting work orders and applying information to project at hand. Considered advocate for safety. Offering extensive fabrication experience.

Overview

16
16
years of professional experience

Work History

Boilermaker, Pipefitter

New World Engineering
2023.11 - 2024.10
  • Built and repaired process tanks, storage tanks and water treatment tanks.
  • Used hand signals to notify crane operator to lift components to specific positions.
  • Identified issues and addressed each immediately with job foreman.
  • Interpreted blueprints, sketches, and specifications for each job.

Boilermaker, Pipefitter

New World Engineering
2023.04 - 2023.11
  • Measured old structural parts or assemblies to determine dimensional requirements of replacements parts.
  • Maintained compliance with all safety procedures from both client and employer.
  • Tightened or replaced bolts and gaskets to repair leaks.
  • Inspected equipment and structures to determine scope of work (SOW).

Boilermaker, Piperfitter

New World Engineering
2022.07 - 2023.04
  • Measured old structural parts or assemblies to determine dimensional requirements of replacements parts.
  • Maintained compliance with all safety procedures from both client and employer.
  • Tightened or replaced bolts and gaskets to repair leaks.
  • Inspected equipment and structures to determine scope of work (SOW).

Boilermaker, Pipe Fitter

New World Engineering
2021.06 - 2022.07
  • Measured old structural parts or assemblies to determine dimensional requirements of replacements parts.
  • Maintained compliance with all safety procedures from both client and employer.
  • Tightened or replaced bolts and gaskets to repair leaks.
  • Inspected equipment and structures to determine scope of work (SOW).

Boilermaker

New World Engineering
2019.12 - 2021.06
  • Built and repaired process tanks, storage tanks and water treatment tanks.
  • Used hand signals to notify crane operator to lift components to specific positions.
  • Identified issues and addressed each immediately with job foreman.
  • Dismantled equipment or devices to gain access and remove defective parts or components.

Boilermaker

MetWest Engineering
2018.07 - 2019.11
  • Measured old structural parts or assemblies to determine dimensional requirements of replacements parts.
  • Maintained compliance with all safety procedures from both client and employer.
  • Tightened or replaced bolts and gaskets to repair leaks.
  • Inspected equipment and structures to determine scope of work (SOW).

Pipefitter, Boilermaker

SNL Engineer
2017.01 - 2018.07
  • Demonstrated versatility in skillset by working with various types of pipes such as PVC, copper, steel, cast iron among others.
  • Utilized specialized tools and equipment for precise pipefitting processes, ensuring optimal results for each project.
  • Replaced faulty parts and repaired structural damages to pipes and related components.
  • Contributed to successful project outcomes by working closely with plumbers, steamfitters, and welders on diverse job sites.

Pipefitter, Boilermaker

CBI
2016.01 - 2017.01
  • Enhanced safety by conducting regular inspections of tools and equipment, ensuring proper maintenance and functionality.
  • Fabricated and installed screw pipe, socket weld pipe, and stainless steel tubing.
  • Contributed to overall company success by maintaining a strong work ethic, adaptability, and commitment to delivering exceptional service on all projects undertaken.
  • Performed tests to check quality of pipe and piping systems and make adjustments as necessary.

Pipefitter, Boilermaker

Kobalt
2014.01 - 2016.01
  • Fabricated pipe sections and components to specification using cutting, threading and welding equipment.
  • Promoted a safe work environment by adhering to company safety policies and procedures at all times during pipefitting operations.
  • Installed new systems and connected piping to existing components by welding, bolting and threading.
  • Facilitated smooth project execution by interpreting isometric drawings for accurate installation or modification of piping systems.

Pipefitter, Boilermaker

KSK
2012.11 - 2013.12
  • Installed and maintained industrial piping fittings, valves, flanges and clamps to complete systems setup.
  • Threaded pipes using piping machines.
  • Followed safe work practices, which included fall protection and personal protective equipment.
  • Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.

Pipefitter

Ausco
2012.01 - 2012.11
  • Fabricated pipe sections and components to specification using cutting, threading and welding equipment.
  • Promoted a safe work environment by adhering to company safety policies and procedures at all times during pipefitting operations.
  • Installed new systems and connected piping to existing components by welding, bolting and threading.
  • Facilitated smooth project execution by interpreting isometric drawings for accurate installation or modification of piping systems.

Pipefitter

UGL
2009.01 - 2011.12
  • Installed and maintained industrial piping fittings, valves, flanges and clamps to complete systems setup.
  • Threaded pipes using piping machines.
  • Followed safe work practices, which included fall protection and personal protective equipment.
  • Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.

Education

No Degree - Cert.3 in Engineering-Fabrication Trade MEM30305

Granville Tafe
Granville, NSW
11.2006

Skills

  • Structural steelwork
  • Hand and power tools
  • Oxy-Fuel Cutting
  • Gas Metal Arc Welding
  • Grinding Techniques
  • Safety Procedures
  • Component Installation
  • Precision measuring
  • Plasma cutting
  • Material prepping
  • Parts Fabrication
  • Heavy Lifting
  • Blueprint Interpretation
  • Carbon Arc Gouging
  • Pipefitting
  • Structural fittings

Timeline

Boilermaker, Pipefitter

New World Engineering
2023.11 - 2024.10

Boilermaker, Pipefitter

New World Engineering
2023.04 - 2023.11

Boilermaker, Piperfitter

New World Engineering
2022.07 - 2023.04

Boilermaker, Pipe Fitter

New World Engineering
2021.06 - 2022.07

Boilermaker

New World Engineering
2019.12 - 2021.06

Boilermaker

MetWest Engineering
2018.07 - 2019.11

Pipefitter, Boilermaker

SNL Engineer
2017.01 - 2018.07

Pipefitter, Boilermaker

CBI
2016.01 - 2017.01

Pipefitter, Boilermaker

Kobalt
2014.01 - 2016.01

Pipefitter, Boilermaker

KSK
2012.11 - 2013.12

Pipefitter

Ausco
2012.01 - 2012.11

Pipefitter

UGL
2009.01 - 2011.12

No Degree - Cert.3 in Engineering-Fabrication Trade MEM30305

Granville Tafe
Sang Bak Lee