Overview
Work History
Skills
Strengths
Professional Experience
Membership
Safety Certifications
Fundamental Training
Education
Career Objective
Cover Letter
Timeline
Generic

Sanjeev Kumar

Perth,Australia

Overview

13
13
years of professional experience

Work History

Senior Engineer- Project

Bouygues UK Ltd
United Kingdom
10.2022 - 03.2023
  • Manage the team of Engineers team assigned to a building while adhering to nuclear safety
  • Ensure all the site operation are controlled by safe system of work defined within internally and externally approved method statement, Risk assessment, task sheets and procedures
  • Manage the engineering team in the process of completing the inspection and test plan
  • Ensure an appropriate design change system is implemented and information is available to enable efficient procurement of material and subcontractors
  • Attend the client meetings
  • To work with procurement to ensure the most appropriate material, product, plant and system are purchased for the project
  • Work as a Temporary work Coordinator
  • Coordinate with Temporary work design Team for the requirement of the at site and raise TFCR.

Project Manager

Sojitz Corporation
India
01.2021 - 10.2022
  • Monitor the project along with project Director
  • Prepare and follow-up for the 3-month Lookahead program
  • Maintain external and internal invoice of clients and subcontractor
  • Project with concrete qty of 11 lac cum & 441 lac cum of Earthwork,30 Lac MT of Ballast production, 11.7 lac sleeper production and laying, 11 station building, 11 Rail yard and 741 TKM of track work with NTC (Harsco and Plassar) and Supply and laying of 1 in 12.5 turnout and 1 in 8.5 turnout
  • Coordinating the progress of Construction & Planning of 5 Important Bridge, 80 Major bridge, 345 Minor Bridges,264 RUB Minor, 5 ROB,2 RFO, 18 Major RUB, 13 RFO, 20 Pedestrian subway & Track laying of 741 TKM with NTC machine
  • Coordination with stakeholder for Employers Requirement, General condition of contract
  • Conduct project initiation in a professional manner by team alignment, Kick off meeting, agenda, structure, and presentation
  • Prepare and maintain open & close item list and chase the status of open items
  • Review the Method statements
  • Set-up the project for seamless execution by project execution plan, project schedule, assumption list, need list, master deliverable list and other such documents to define project
  • Co-ordination with planning and Cost control team
  • Preparation of project report, Budget, and coordinate with Japan Headquarter
  • Familiar with FIDIC general condition and Handling Contract related issue and draft the document for Disputes (DAB) and for arbitration
  • Coordination with the design team and construction team for the issues that are impeding progress of the project
  • Create and maintain key forecast such as cost, efforts, billing, revenue, locked working capital
  • Handling and coordinating the variation related issue with Employer, Engineers, and stakeholders as 40% project under variation and prepare the variation proposal and negotiate the proposal with Employers
  • Finding a new business in India and arrange the meeting to identify the business partners
  • Tracking purchasing operation of main item like 1080 HH Rail from Japan and 880 Rail from India, Reinforcement, Bearings, and availability of borrow area.

Site Engineer - Cast in Situ

RIZZANI DE ECCHER SPA
UAE
04.2017 - 10.2018
  • Planning & Execution of cast in situ Viaduct
  • Preparation of budget and follow of the same with team
  • Construction Pier cap shell at precast yard
  • Erection of Launching Girder and Precast Span
  • Erection of pier cap
  • Co-ordination with planning and Cost control
  • Erection of Balanced cantilever segment
  • Construction of pocket track slab
  • Construction of cast in viaduct Deck
  • Coordinate with sub-contractor, vendor
  • Reconciliation of the material and order
  • Handling of manpower
  • Installation of Pot & Elastomeric Bearing Prepare the three weeks look ahead
  • Work as a Temporary work supervisor
  • Work as a quality assurance engineer at site
  • Solving quality related issue at site with client and qc team
  • Follow up with engineer with for inspection as per ITP
  • Meeting with Sub-contractor other vendors and follow up the actions
  • Preparation of Method statement and Risk Assessment for construction work.

Site Engineer (Cut & Cover Tunnel/Viaduct)

RIZZANI DE ECCHER SPA
Qatar
05.2015 - 04.2017
  • Coordinate with Design team, contractor & vendors for design and follow up for the same
  • Planning & construction of underpass 90mtr long 56mtr wide
  • Construction of 3600 mt long cut & cover tunnel & 460 mt open
  • Construction of 20 x Pile, 60 x pier base, 4 x pile cap, 64 x pier cap, 2 x abutment and 60 x Conti pile
  • Construction of Attenuation tank inside of cut & cover tunnel
  • Familiar with dewatering well & experience in working in confined space
  • Review and approval of contractor’s materials/supplier submittals comprising technical literature, samples, and mock-ups as appropriate to ensure compliance with design specifications
  • Monitoring of contractor’s progress of works to ensure timely execution of work in accordance with the project schedule and in coordination with the work of other trades and disciplines
  • Erection of precast walkway, staircases
  • Review of as-built drawings and other record documents Liaison and inspection with third party for geotechnical reports
  • Shotcrete & Rock bolting in C & C Tunnel
  • Preparing Task Briefing
  • Familiar with QCS 2010 & 2014
  • Review of materials test certificates for compliance with specifications Preparations of documentations required by the Quality Management system
  • Reconciliation of all material
  • Coordinate and weekly meetings with JV partners & vendors
  • Preparation of method statement
  • Familiar with Inspection Test Plan (ITP) Monitor of construction activities to ensure works are done right first time eliminating wasted time resources
  • Utility Diversion & Road Diversion
  • Experience in use of Tunnel Form work/Hydraulic etc
  • Attendance as required at site progress and technical meetings to resolve technical issues & 3 week look ahead program
  • Review of method statements for specific construction operations
  • Acceptability in relation to general adequacy and compliance with the design intent, impact on other work and safety of proposals
  • Checking and inspection of layouts, level Total quality control of concrete making material and construction material DPR preparation for cash flow & budget

Senior Engineer

Sadbhav Engineering Limited
India
05.2013 - 04.2015
  • Coordinate with Design Consultants, contractor & vendors for design and follow up for the same
  • Construction of Elevated Station building, Concourse slab, platform slab, 84xpile, 24xPile cap, 10xPier, 14xcolumn
  • Construction of elevated viaduct piers, piles, pile cap, pier cap
  • Erection of I-Girders for viaduct deck
  • Manipulate CAD drawing
  • Reconciliation of all the material Utility diversion and road diversion
  • Erection of precast parapet at viaduct section
  • Checking and inspection of layout and levels
  • Direction and supervision of engineering inspectors in quality control inspection of materials and workmanship of installation to ensure compliance with design specifications
  • Preparing bills of contractor and keeping record of cement and reinforcement
  • Execution and organize manpower
  • Familiar with Inspection Test Plan (ITP) Attending RFI, Nonconformity report, maintaining cube test result, daily site report
  • Work as a approved scaffold inspector
  • Total quality control of construction material Preparation of BBS
  • Solving quality related issue

Asst. Engineer (Independent Coordinator)

J M C Projects I Ltd
India
03.2013 - 08.2013
  • Construction of Asia biggest green project following LEED norms
  • It’s a totally load bearing structure
  • Coordinate with Architect Consultants, contractor & vendors for design and follow up for the same
  • Construction of 2 x 18mtr span bridges, concrete road
  • Checking and inspection of layouts, levels
  • Inspection of reinforcement as per BBS
  • Preparation of Project Quality Plan, Field Quality Plans (FQPs), Method Statements, Pouring Sequence, Check Lists and Formats for various activities, submission to Client and obtaining their approval
  • Total quality control of concrete making material and building construction material
  • Preparing bills of contractor and keeping record of cement and reinforcement steel
  • Familiar with quality, safety, and status as applicable for site work Execution and organize the manpower
  • Able to handle site Monitoring
  • Liaison for statutory approval from GUDA, Airport Authority, Water Supply Dept
  • And forest Dept
  • DPR preparation for cash flow and budget.

Engineer - Execution

P & R INFRAPROJECTS LTD.
India
06.2010 - 03.2013
  • Looking after construction of Powerhouse, Tail Race Channel, Head Race Channel, Sumps, Trenches of 9x2 Megawatt Hydel Project in Punjab
  • Project planning, Execution planning and scheduling of project
  • Construction of 2 x 22 mtr Span bridge on Beas’s River Checking and inspection of layouts
  • Preparation of BBS
  • Excavation quantity 185000 Cum
  • Inspection of reinforcement as per BBS
  • Total quality control of concrete making material and building construction material
  • Preparing bills of contractor and keeping record of cement and reinforcement steel
  • Familiar with quality, safety and status as applicable for site work
  • Execution and organize the manpower
  • Able to handle site monitoring
  • Coordination with contractor
  • Making daily progress report
  • Coordinate with team lead and PMC
  • Preparation of contract document for consultant and contractor.

Senior Project Engineer

CPB Contractor Pty Ltd
Perth, Australia
11.2023
  • Prepare a construction Area Plan (CAP), Review the work pack with Project Engineer and construction Manager
  • Providing reliable supervision to effectively control and approve site construction activities
  • Monitor the work of team of Project engineer, Site engineer Graduate Engineer
  • Ensure contractor compliance with procedure, drawing, project specification and HSE requirement
  • Inspiring the safe execution of all works: providing correct orientation, discussing risk assessment and conduct job safety analysis to mitigate site hazards
  • Liaise with subcontractor to ensure job is constructed to the drawing
  • Prepare a design brief and Coordinate with temporary work designer for Design
  • Liaise with project manager and project planner regarding schedule issues and status of activities
  • Interfacing with engineering to ensure that engineering output is time efficient and meets quality expectation
  • Which include results of RFI and raising of FCR
  • Reviewing and evaluating contractor submittals inclusive of method statement, inspection and test plans, material submittal and shop drawing
  • Monitor construction progress to ensure that activities are in line with the approved construction schedule
  • Prepare and review the work pack for the safe work at site
  • Prepare improvement plan, specification, supporting documents and permit application for commercial developments, Conducts constructability review or assist in the design, planning, review of other civil engineering projects assigns to other
  • Preparation of engineer’s construction cost estimates
  • Support project manager and Area manager in the activities
  • Able to manage multiple contracts, provide timely and accurate budget forecasts, and budget or scope to reflect changing condition
  • Review and approve subcontractor monthly claim.

Skills

  • Certified Temporary Work Coordinator (TWC) -CITB UK
  • Temporary Works Supervisor Training by Enertech Qatar
  • Certified in Managing Stakeholder by PMI
  • Certificate Program in contract Management by World Bank
  • Certificate program in Public Procurement by World Bank
  • Certified Auditor training for Quality Management System: ISO 9001:2015
  • Lean Six Sigma Green and Black Belt Training & Certification
  • Public Private Partnership (PPP) awareness from United Nations ESCAP
  • Private Financing for Infrastructure and sustainable Growth from Asian development Bank (ADB) institute
  • MS project
  • Work experience on Asite, Qlik, Mondaycom, Naviswork, Laserfiche, Trimble, Blue beam, propeller, Team binder, Revizto, Revu, Teambinder
  • Auto Cad, Excel, Aconex, PowerPoint

Strengths

  • Immense zeal and enthusiasm to work.
  • A Self-starter and a good team player.
  • Ability to walk an extra mile.
  • Friendly and extremely enthusiastic.
  • Flexible, Hard Working and Energetic.
  • Good Communications skill, Aggressive, Ability to keep words and honor commitments.
  • Believe in gaining practical knowledge with theoretical knowledge in perspective.
  • Good at Computers.
  • Knowledge of Project Handling.

Professional Experience

  • NEWest Alliance (1.1 billion AUD), CPB Contractor Pty Ltd (CIMIC Group), Senior Project Engineer, PTA, 11/04/2023 to Present, Prepare a construction Area Plan (CAP), Review the work pack with Project Engineer and construction Manager., Providing reliable supervision to effectively control and approve site construction activities., Monitor the work of team of Project engineer, Site engineer Graduate Engineer., Ensure contractor compliance with procedure, drawing, project specification and HSE requirement., Inspiring the safe execution of all works: providing correct orientation, discussing risk assessment and conduct job safety analysis to mitigate site hazards., Liaise with subcontractor to ensure job is constructed to the drawing., Prepare a design brief and Coordinate with temporary work designer for Design., Liaise with project manager and project planner regarding schedule issues and status of activities., Interfacing with engineering to ensure that engineering output is time efficient and meets quality expectation. Which include results of RFI and raising of FCR., Reviewing and evaluating contractor submittals inclusive of method statement, inspection and test plans, material submittal and shop drawing., Monitor construction progress to ensure that activities are in line with the approved construction schedule., Prepare and review the work pack for the safe work at site., Prepare improvement plan, specification, supporting documents and permit application for commercial developments., Conducts constructability review or assist in the design, planning, review of other civil engineering projects assigns to other., Preparation of engineer’s construction cost estimates., Support project manager and Area manager in the activities., Able to manage multiple contracts, provide timely and accurate budget forecasts, and budget or scope to reflect changing condition., Review and approve subcontractor monthly claim.
  • Hinkley Point C - Europe biggest nuclear power project), Bouygues (U.K) Ltd joint venture with Laing
  • Rourke (BYLOR JV), Senior Engineer- Project, EDF Energy, 2.5 billion pounds, 24/10/2022 to 31/03/2023, Manage the team of Engineers team assigned to a building while adhering to nuclear safety., Ensure all the site operation are controlled by safe system of work defined within internally and externally approved method statement, Risk assessment, task sheets and procedures., Manage the engineering team in the process of completing the inspection and test plan., Ensure an appropriate design change system is implemented and information is available to enable efficient procurement of material and subcontractors., Attend the client meetings., To work with procurement to ensure the most appropriate material, product, plant and system are purchased for the project., Work as a Temporary work Coordinator., Coordinate with Temporary work design Team for the requirement of the at site and raise TFCR.
  • Civil, Building, Track Contract Package (CTP-3R) - 342 KM Project (900 million USD) (Funded by JICA), Sojitz Corporation (Japanese MNC), Deputy Project Manager (13/11/2018 – 31/03/2021), Dedicated Freight Corridor Corporation of India, 4700 Crore (900 million Dollar), Nippon Koei Consortium, 13/11/18 to 10/10/2022, Monitor the project along with project Director., Prepare and follow-up for the 3-month Lookahead program., Maintain external and internal invoice of clients and subcontractor., Project with concrete qty of 11 lac cum & 441 lac cum of Earthwork,30 Lac MT of Ballast production, 11.7 lac sleeper production and laying, 11 station building, 11 Rail yard and 741 TKM of track work with NTC (Harsco and Plassar) and Supply and laying of 1 in 12.5 turnout and 1 in 8.5 turnout., Coordinating the progress of Construction & Planning of 5 Important Bridge, 80 Major bridge, 345 Minor Bridges,264 RUB Minor, 5 ROB,2 RFO, 18 Major RUB, 13 RFO, 20 Pedestrian subway & Track laying of 741 TKM with NTC machine., Coordination with stakeholder for Employers Requirement, General condition of contract., Conduct project initiation in a professional manner by team alignment, Kick off meeting, agenda, structure, and presentation., Prepare and maintain open & close item list and chase the status of open items., Review the Method statements., Set-up the project for seamless execution by project execution plan, project schedule, assumption list, need list, master deliverable list and other such documents to define project., Co-ordination with planning and Cost control team., Preparation of project report, Budget, and coordinate with Japan Headquarter., Familiar with FIDIC general condition and Handling Contract related issue and draft the document for Disputes (DAB) and for arbitration., Coordination with the design team and construction team for the issues that are impeding progress of the project., Create and maintain key forecast such as cost, efforts, billing, revenue, locked working capital., Handling and coordinating the variation related issue with Employer, Engineers, and stakeholders as 40% project under variation and prepare the variation proposal and negotiate the proposal with Employers., Finding a new business in India and arrange the meeting to identify the business partners., Tracking purchasing operation of main item like 1080 HH Rail from Japan and 880 Rail from India, Reinforcement, Bearings, and availability of borrow area.
  • Route 2020 (UAE - Metro Project) – 13.2 Km Elevated Metro rail project (140 Mill €), RIZZANI DE ECCHER SPA (Italian MNC), Site Engineer - Cast in Situ, Road Transport Authority (Govt. of Dubai), Parson - Systra, 26/04/2017 to 31/10/2018, Planning & Execution of cast in situ Viaduct., Preparation of budget and follow of the same with team., Construction Pier cap shell at precast yard., Erection of Launching Girder and Precast Span., Erection of pier cap., Co-ordination with planning and Cost control., Erection of Balanced cantilever segment., Construction of pocket track slab., Construction of cast in viaduct Deck., Coordinate with sub-contractor, vendor., Reconciliation of the material and order., Handling of manpower., Installation of Pot & Elastomeric Bearing, Prepare the three weeks look ahead., Work as a Temporary work supervisor., Work as a quality assurance engineer at site., Solving quality related issue at site with client and qc team., Follow up with engineer with for inspection as per ITP., Meeting with Sub-contractor other vendors and follow up the actions., Preparation of Method statement and Risk Assessment for construction work.
  • Red Line North Elevated and at Grade – 6.320 Km Elevated and at Grade metro rail project. (550 Mill €), RIZZANI DE ECCHER SPA (Italian MNC), Site Engineer (Cut & Cover Tunnel/Viaduct), Qatar Rail, Egis- Louis Berger, 05/05/2015 to 24/04//2017, Coordinate with Design team, contractor & vendors for design and follow up for the same., Planning & construction of underpass 90mtr long 56mtr wide., Construction of 3600 mt long cut & cover tunnel & 460 mt open., Construction of 20 x Pile, 60 x pier base, 4 x pile cap, 64 x pier cap, 2 x abutment and 60 x Conti pile., Construction of Attenuation tank inside of cut & cover tunnel., Familiar with dewatering well & experience in working in confined space., Review and approval of contractor’s materials/supplier submittals comprising technical literature, samples, and mock-ups as appropriate to ensure compliance with design specifications., Monitoring of contractor’s progress of works to ensure timely execution of work in accordance with the project schedule and in coordination with the work of other trades and disciplines., Erection of precast walkway, staircases., Review of as-built drawings and other record documents, Liaison and inspection with third party for geotechnical reports., Shotcrete & Rock bolting in C & C Tunnel., Preparing Task Briefing., Familiar with QCS 2010 & 2014., Review of materials test certificates for compliance with specifications, Preparations of documentations required by the Quality Management system., Reconciliation of all material., Coordinate and weekly meetings with JV partners & vendors., Preparation of method statement., Familiar with Inspection Test Plan (ITP), Monitor of construction activities to ensure works are done right first time eliminating wasted time resources., Utility Diversion & Road Diversion., Experience in use of Tunnel Form work/Hydraulic etc., Attendance as required at site progress and technical meetings to resolve technical issues & 3 week look ahead program., Review of method statements for specific construction operations., Acceptability in relation to general adequacy and compliance with the design intent, impact on other work and safety of proposals., Checking and inspection of layouts, level, Total quality control of concrete making material and construction material, DPR preparation for cash flow & budget
  • (CC-43) Part design & construction of elevated viaduct and 3 metro station phase3 of MRTS in Haryana region 13.8 Km Elevated metro rail project (700 Crore INR), SADBHAV ENGINEERING LIMITED – Corsan-Corviam S.A., Senior Engineer, Delhi Metro Rail Corporation, 05/09/2013 - 30/04/2015, Coordinate with Design Consultants, contractor & vendors for design and follow up for the same., Construction of Elevated Station building, Concourse slab, platform slab, 84xpile, 24xPile cap, 10xPier, 14xcolumn., Construction of elevated viaduct piers, piles, pile cap, pier cap., Erection of I-Girders for viaduct deck., Manipulate CAD drawing., Reconciliation of all the material, Utility diversion and road diversion., Erection of precast parapet at viaduct section., Checking and inspection of layout and levels., Direction and supervision of engineering inspectors in quality control inspection of materials and workmanship of installation to ensure compliance with design specifications., Preparing bills of contractor and keeping record of cement and reinforcement., Execution and organize manpower., Familiar with Inspection Test Plan (ITP), Attending RFI, Nonconformity report, maintaining cube test result, daily site report., Work as a approved scaffold inspector., Total quality control of construction material, Preparation of BBS., Solving quality related issue
  • Indian Institute of Public Health (130 Crore), J M C Projects I Ltd, Asst. Engineer (Independent Coordinator), Public Health Foundation of India, CBRE, 21/03/2013 to 30/08/2013, Construction of Asia biggest green project following LEED norms. It’s a totally load bearing structure., Coordinate with Architect Consultants, contractor & vendors for design and follow up for the same., Construction of 2 x 18mtr span bridges, concrete road., Checking and inspection of layouts, levels., Inspection of reinforcement as per BBS., Preparation of Project Quality Plan, Field Quality Plans (FQPs), Method Statements, Pouring Sequence, Check Lists and Formats for various activities, submission to Client and obtaining their approval., Total quality control of concrete making material and building construction material., Preparing bills of contractor and keeping record of cement and reinforcement steel., Familiar with quality, safety, and status as applicable for site work, Execution and organize the manpower., Able to handle site Monitoring., Liaison for statutory approval from GUDA, Airport Authority, Water Supply Dept. And forest Dept., DPR preparation for cash flow and budget.
  • 9x2 MW Hydel Project Stage–2, P & R INFRAPROJECTS LTD., Engineer - Execution, Punjab State Power Corporation Ltd, PEC Ltd, 30/06/2010 – 18/03/2013, Looking after construction of Powerhouse, Tail Race Channel, Head Race Channel, Sumps, Trenches of 9x2 Megawatt Hydel Project in Punjab., Project planning, Execution planning and scheduling of project., Construction of 2 x 22 mtr Span bridge on Beas’s River, Checking and inspection of layouts., Preparation of BBS., Excavation quantity 185000 Cum., Inspection of reinforcement as per BBS., Total quality control of concrete making material and building construction material., Preparing bills of contractor and keeping record of cement and reinforcement steel., Familiar with quality, safety and status as applicable for site work., Execution and organize the manpower., Able to handle site monitoring., Coordination with contractor., Making daily progress report., Coordinate with team lead and PMC., Preparation of contract document for consultant and contractor.

Membership

  • Life member of Indian Society of Rock Mechanics & Tunneling Technology.
  • Member of Institution of Engineers India (IEI)
  • Registered as a Chartered Engineer (IEI).
  • Affiliated member of Chartered Institute of Rail Operators (CIRO) Australia
  • Life member of International Association of Engineers (IAENG)

Safety Certifications

  • Health, Safety and Environment test for Manager and Professional (MAPS) from CITB (98/100).
  • Basic scaffold competency training by Arbrit Safety & Engineering Solutions (P)
  • Auto Cad, Excel, Aconex, PowerPoint
  • Basic First AID & CPR Training by Enertech Qatar.
  • Safety Supervisor Training by Enertech Qatar.
  • Certified Work Supervisor- work near Rail by Public Transport Authority- Western Australia.

Fundamental Training

  • Project Fundamental-Safety
  • Project Fundamental- Cost Control
  • Project Fundamental- Commercial & Procurement
  • Project Fundamental- Design
  • Project Fundamental-Digital
  • Project Fundamental- Planning
  • Project Fundamental-Quality

Education

  • Diploma in Transport Economics & Management from Institute of Rail Transport
  • B.Tech (Civil Engineering) from Punjab Technical University. (UK framework level - RQF level 6, SCQF level 10, CQFW level 6)
  • B.A. from Guru Nanak Dev University.
  • Intermediate (12th- Non. Med.) from P.S.E.B.
  • High School (10th) from C.B.S.E

Career Objective

To pursue my career goal to excel and nurture my spirit of continuous improvement by enjoying and relishing whatever I do. I look forward to a challenging, growth-oriented position in a progressive company, where my skills are effectively utilized to improve operations and contribute to organization’s success.

Cover Letter

Dear Sir/Madam, Greetings. I am confident that my solid experience and diverse capabilities in project management and execution make me an ideal candidate. I have a Bachelor of Civil Engineering, am a registered Chartered Engineer, and hold a post-Diploma in Transport Economics and Management. My work experience spans leading organizations in India and overseas: CPB Contractor Pty Ltd – Australia – Metro Rail Project Bouygues UK Ltd – United Kingdom - Nuclear Power Project Sojitz Corporation-India - Rail Civil Track Package Project (Japanese MNC) Rizzani de Eccher-UAE - Metro Project (Italian MNC) Rizzani de Eccher-Qatar - Metro Project (Italian MNC) Sadbhav Engineering Limited - India - Metro Project (Indian Organization) I also have experience with nuclear power projects and Hydro Projects. During my tenure as an Engineer to Manager, I was responsible for overseeing critical projects from conception to delivery. I was commended by my manager for demonstrating strong skills in: Proactively managing important and time-sensitive projects. Developing innovative solutions to critical problems. Balancing Stakeholders' Expectations with those of the company. Collaborating with other team members to establish an efficient system of operation. Follow-up for payment of IPC. Meeting with Consortium partners, Contractors and stakeholders. During my time at different companies, I was noted for achieving the following: Executing several highly profitable projects. Being certified in Managing Stakeholders by PMI. Managing prestigious international projects. Possessing a strong understanding of quality improvement techniques, project statistics, and familiarity with project scheduling, issue tracking, and resource management. Being experienced and certified in Temporary Works (Temporary Work Coordinator). Holding a certification in HS&E MAP (Health, Safety & Environment test for Manager and Professional) by CITB. Being a life member of the Indian Society of Rock Mechanism and Tunneling Technology. Being a life member of The Institution of Engineers (India). Being a member of the International Association of Engineers (IAENG). Certified in Lean Six Sigma Green and Black Belt Training & Certification. I believe that the above qualities and experience would make me a valuable addition to your company. If you require more information, please feel free to contact me. Best Regards, Sanjeev Kumar +61-481283624

Timeline

Senior Project Engineer

CPB Contractor Pty Ltd
11.2023

Senior Engineer- Project

Bouygues UK Ltd
10.2022 - 03.2023

Project Manager

Sojitz Corporation
01.2021 - 10.2022

Site Engineer - Cast in Situ

RIZZANI DE ECCHER SPA
04.2017 - 10.2018

Site Engineer (Cut & Cover Tunnel/Viaduct)

RIZZANI DE ECCHER SPA
05.2015 - 04.2017

Senior Engineer

Sadbhav Engineering Limited
05.2013 - 04.2015

Asst. Engineer (Independent Coordinator)

J M C Projects I Ltd
03.2013 - 08.2013

Engineer - Execution

P & R INFRAPROJECTS LTD.
06.2010 - 03.2013
Sanjeev Kumar