Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Shannon Jones

Advanced scaffolder
17 Merton Avenue, College Grove, Bunbury ,W.A

Summary

Motivated Advanced scaffolder with solid experience managing all levels of large scale projects, A Scaffolder with 15+ years experience in all areas of scaffolding. Including residential, commercial and construction and mining. Experienced and professional with in my trade with strong leadership and relationship-building skills. Meticulous and excellent at juggling multiple tasks and working under pressure and meeting deadlines while maintaining a high standard of safety.

Overview

15
15
years of professional experience
5
5
Certification

Work History

Advanced Scaffolder Leading Hand

KAEFER Integrated Services
06.2022 - 12.2022

Major shut-down services on muja power station

Advanced Scaffolding and Rigging to the clients requirements and schedules meet and undertaken to a professional standard

Multiple types of scaffolds and scaffolding from tube and fit at-pac and quickstage

Basic through to advanced scaffolds loading bays, dance floors, boiler internals to externals, confined space scaffolds, drop or hung scaffolds

Yard work and scaffold maintenance

Rigging and dogging of scaffold materials into powerstation building

Advanced Scaffolder

M.A.D Access Services
01.2022 - Current

Building advanced scaffolds for the south West regional regions in residential and commercial purposes. Working unsupervised in the south west using tube and coupler and quick stage and at-pac modular suit builders requirements

Advanced Scaffolder

KAEFER Integrated Services
07.2021 - 12.2021

Build advanced scaffolds to clients shut down requirements. Build Tube and coupler and at-pac systems for boiler, turbine, hi energy lines, high voltage, and all internal and external scaffolds. Scaff yard scaffold maintenance, make up work packs, rigging and dogging of hoist and cranes when required.

Advanced Scaffolder

Monadelphous Group
01.2021 - 07.2021

Built advanced scaffolds to clients requirements on kemrton lithium plan. Scoped and measured scaffolds as per plans and daily scopes. Used tube and clip and quick stage modular, made up work packs for jobs serviced and maintenance of scaff components. Dog and rigged up loads of scaffold as required for daily tasks

Advanced Scaffolder Leading Hand

Kaefer Muja Powerstation
06.2020 - 12.2020

Advanced scaffolder at muja powerstation shut down. Built a variety of scaffolds to the clients specifications including hung, counter lever, spurred, loading bays, alimak scaffolds, scaffed out boilers and furnaces alimak access with loading bays with tube and clip and modular scaffolding. Serviced scaffold packed strapped and done stock take for off hire gear

Advanced Scaffolder

Altrad Collie A Powerstation
03.2020 - 06.2020

Advanced scaffolder at collie A powerstation shut down. Built a variety of scaffolds to the clients specifications including hung, counter lever, spurred, loading bays, alimak scaffolds, scaffed out boilers and furnaces alimak access with loading bays with tube and clip and modular scaffolding. Serviced scaffold packed strapped and done stock take for off hire gear

Advanced Scaffolder

Western Workforce
10.2019 - 03.2020
  • Accurately constructed a vast variety of scaffoldings of tube and fit and quick stage components for shutdowns and refurbishment of the nickel such as Confined entry scaffolds in tanks, shoots, hung from walkways on tanks etc in many areas for number of projects on site
  • Maintained safety and operational procedures on site, while meeting project requirements and deadlines while maintaining a high level of safety on high risk tasks.
  • Worked in a team of experienced and fersitile scaffolders, maintained and serviced all scaff components with in our crew.
  • Worked 12 hour shifts, traveled 6hrs to and from site by car, provided my own harness, tools, and safety equipment.

Advanced Scaffolder

SRG Global
08.2018 - 10.2019
  • I was part of the capital projects scaffold maintenance crew at worsley refinery
  • We constructed lahyer, Atpac, kwikstage and tube and fit scaffolds, we built dismantled and modified a large variety of advanced scaffolds built to company and site procedures and safety standards
  • We worked in a large 8 man crew on large scale jobs across the whole refinery in confined spaces, tanks and vessels, crane rails and on conveyor belts
  • Maintained positive relationship with the capital crew manager
  • Scoped and measured up our jobs to the highest of standards, we also made up all work packs and gear with in the crew also racking and stacking our own gear in the yard
  • I also rigged and dogged cranes when needed on site

Advanced Scaffolder

Kaefer
11.2017 - 07.2018
  • Built tube and clip and modular scaffolds(at-pac,quick stage.)
  • Maintained positive relationships with client and management
  • Adhered to safety practices while working under tight deadlines
  • Constructed scaffolding for ccp-5 power station on the itchys oil and gas project
  • Used power/hand tools for scaffold carpentry (chippy) work
  • Communicated operational interface issues and changes to work scopes and work packs to supervisors immediately
  • Followed standards and procedures to maintain safe work environment
  • Built a variety of scaffolds for Contractors hung (drop) compression (spurred) tension (raked). Built & Modified scaffolds to suit client
  • Yard and scaffold maintenance, serviced scaffold components, re-stacked returned scaffolding, cut and stacked ply

Advanced scaffolder

Hertel Modern Pty Ltd
01.2017 - 11.2017
  • Constructed tube and coupler, modular and layer scaffolding for re-works maintenance on Gorgan Barrow island
  • Worked around live machinery and ongoing operations to accomplish all the clients scaffolding requirements
  • modified and Dismantled hung layer system under the Gorgan ship loading jetty
  • Responsible for wide variety of duties including, power tool use, yard work, scaffold maintenance, scaffold erection dismantles and modifications across the Gorgan project on the trains, vessels, Jetty (wharf), confined spaces
  • Safely operated and complied to all company and safety requirements
  • Kept positive communications with client and management immediately reporting changes to work scopes or site production
  • Constructed scaffolding for confined spaces and loading bays

Advanced Scaffoler

Cape
05.2017 - 06.2017
  • Erected, dismantled and modified tube and clip and modular scaffolds
  • Constructed scaffolding for on going shut downs and maintenance on Boddington gold mine
  • Worked around live plant and machinery and ongoing operations to meet the clients shut down maintenance requirements
  • Leading hand role and responsibilities, guided a team of 3-5 scaffolder's
  • Operated at heights while building high quality high risk advanced scaffolds
  • Maintained a high safety standard while working around live plant and machinery and completing and meeting deadlines on shut downs

Advanced Scaffolder, Intermediate Rigger, Labourer

On To It Utility Services Pty Ltd
06.2016 - 12.2016


  • Responsible for erecting, dismantling and modifying tube and coupler and modular scaffolds in the metro area perth
  • working on commercial, residential and high rise scaffolds through out the metro area perth
  • installing material and personnel hoists
  • Rigging and dogging crane loads and lifts of scaffold materials
  • erecting and dismantling of access towers and loading bays
  • other responsibilities site clean ups, scaffold maintenance and assisting with gyprock materials and installation
  • Adhered to safety practices while working under tight deadlines

Advanced Leadind Hand Scaffolder

Cape PLC
10.2014 - 05.2016
  • Leading hand position responsible for 7 plus scaffolders
  • Responsibility as leading hand, safely managing and organizing materials to and from the job, measure up scaffold work scopes, work, read, sign and adhere to all company and site wide procedures, and implement and communicate any changes to the work scope or production requirements and deadlines
  • Was an active member of the personal based safety team (pbs) on the wheatstone project which involved safety discussions between all wheatstone contractors on site and in camp, this involved me having weekly company PBS safety meetings within cape and monthly safety meetings with all contractors and Bechtel and chevron cliental. Also out in the field discussions between me and wheatstone personal
  • Erected dismantled and modified tube and clip and modular (At-pac) scaffolds on the wheatstone project which consisted of hung (Drop scaffold) cantilever, access towers, heavy duty loading bays, pipe racks, tanks and vessels, for steel erection, cable trays full modules, humpys, handrails any scaffolds to suit clients work requests
  • Constructed scaffolding for confined spaces such as furnaces, tanks, vessels, earth works and trenches
  • Lead and guided a team of 7 plus scaffolders
  • Worked around live machinery and plant while ongoing operations on site
  • Communicated operational issues and changes to work scopes to supervisor and client on regular basis

Education

School C Year 11 - Art, Maori Education, Physical Education, Outdoor Education, Metal and Wood Work Education

Gisborne Boys High School
1996

Skills

Experienced and professional advanced scaffolder

15years experience scaffolding in mining and construction industry

Leadership and initiative skills

Relevant industry qualifications and tickets, W@H,EWP, Confined space entry, high risk Licence

Ability to work individually or in a team

Honest, mature, hardworking and reliable

Intermediate rigging experience

Strive to meet deadlines

Team leadership qualities

Training and development experience

Self-motivated

Proven track record results

Ability to work long hours and alternative shifts

Mining & construction, domestic & commercial experience

Ability to adapt to any situation and work environment

Strong verbal communication skills

Development skills

Certification

-Valid High Risk Licence, Advanced Scaffolder, Intermediate Rigger, Dogman and EWP.

-Valid Construction White Card.

-Valid C Class Drivers Licence.

-Valid Confined Space Entry Certificate.

-Valid Working at heights Certificate.

-M.A.D access supervisor millen wihone 0458257777

-Kaefer supervisors.

jamie te puke (J.T) -0410638115

-James mcbreen 0408005478

-Altrad supervisors

Jamie te puke 0410638115

James mcbreen 0408005478

-western workforce supervisor.

Shaun Thwaites 0472696904

-SRG Global worsley refinery. Supervisor.

Alex Sunderland 0447 247 637

-kaefer itchys project Darwin. supervisor.

Henry merino. 0419 103 805

Thomas davies. 0437 568 230

-Hertel Modern- Barrow island.

Clint hopkins. 0488 026 404

Luke Talbot. 0457 411 688

-On 2 it Utility Services-Supervisor/Owner.

Braidy Holmes. 0415 817 694

-Cape Supervisor-Wheatstone.

Louis De Bono 0416 066 967

Ryan Te Maari 0439 777 123

Sonny Ruha 0498 148 933

Timeline

Advanced Scaffolder Leading Hand

KAEFER Integrated Services
06.2022 - 12.2022

Advanced Scaffolder

M.A.D Access Services
01.2022 - Current

Advanced Scaffolder

KAEFER Integrated Services
07.2021 - 12.2021

Advanced Scaffolder

Monadelphous Group
01.2021 - 07.2021

Advanced Scaffolder Leading Hand

Kaefer Muja Powerstation
06.2020 - 12.2020

Advanced Scaffolder

Altrad Collie A Powerstation
03.2020 - 06.2020

Advanced Scaffolder

Western Workforce
10.2019 - 03.2020

Advanced Scaffolder

SRG Global
08.2018 - 10.2019

Advanced Scaffolder

Kaefer
11.2017 - 07.2018

Advanced Scaffoler

Cape
05.2017 - 06.2017

Advanced scaffolder

Hertel Modern Pty Ltd
01.2017 - 11.2017

Advanced Scaffolder, Intermediate Rigger, Labourer

On To It Utility Services Pty Ltd
06.2016 - 12.2016

Advanced Leadind Hand Scaffolder

Cape PLC
10.2014 - 05.2016

School C Year 11 - Art, Maori Education, Physical Education, Outdoor Education, Metal and Wood Work Education

Gisborne Boys High School
Shannon JonesAdvanced scaffolder