Summary
Overview
Work History
Licensing
Attributes
References
Timeline
Generic
SHANNON QUINN

SHANNON QUINN

Doonside,NSW

Summary

Highly experienced construction professional with over 15 years of experience in civil construction, tunneling, and project management. Proven track record of delivering complex projects on time and within budget. Skilled in TBM operations, civil construction supervision, project management, safety management, team leadership, and subcontractor management.

Overview

23
23
years of professional experience

Work History

Civil and Tunnel Forman

CPB Constructions
Sydney
01.2022 - 05.2024
  • Prepare and deliver daily prestart briefings and safety toolbox talks
  • Site set up
  • Complete safety site inspections with client, PM and Transport NSW
  • Participate in daily and weekly planning meetings
  • Bulk excavations and early hand over and TBM Dive
  • Temporary works, pilling pad, supervised Rix pilling
  • Capping Beam and upstand wall FRP works
  • Temporary and permeant pile
  • Digging TBM dive, supervising Rix and shot creating and cable anchors
  • FRP works of main dive structure
  • Set up mod ones and twos
  • Organizing and managing sub-contractors
  • TBM assemblies
  • Set up thrust frame and floating ring supports
  • Launch of TBM and logistics
  • XP excavations, installing opening supports
  • XP excavations with brocks and butters
  • XP arch forms FRP works.

Civil and Tunnel Forman General Forman TCF for structures, XP and LEP’s

CPB Constructions
01.2020 - 01.2022
  • Prepare and deliver daily prestart briefings and safety toolbox talks
  • Manage bull gang resources to complete daily activities
  • Complete safety site inspections with client, PM and Transport NSW
  • Complete SWMS/TRA audits and participate in AMS briefings to workers
  • Participate in daily and weekly planning meetings
  • Complete daily site diary/ shift reports and works
  • Organizing and managing sub-contractors
  • Manage Tunnel Civil Fit out (TCF) subcontractors delivering multiple FRP scopes of tunnel XPs/LEPs/Substations/Ventilation structures
  • Manage tunnel excavation works road headers
  • Rebolt areas as needed
  • Strip drains and shot creating.

TBM Shift Boss for 6 months

CPB Constructions
01.2019 - 01.2020
  • Prepare and deliver daily prestart briefings and safety toolbox talks
  • Manage bull gang resources to complete daily activities
  • Complete safety site inspections with client, PM and Transport NSW
  • Complete SWMS/TRA audits and participate in AMS briefings to workers
  • Participate in daily and weekly planning meetings
  • Complete daily site diary/ shift reports and works
  • Organizing and managing sub-contractors
  • Manage Tunnel Civil Fit out (TCF) subcontractors delivering multiple FRP scopes of tunnel XPs/LEPs/Substations/Ventilation structures
  • Manage tunnel excavation works road headers, brokk
  • Management of 2 TBMs.

Shift Boss BEW, Services, NFC, XP, Slip form paver, Barrier back fill and V Drain

CPB Constructions
11.2017 - 01.2019
  • Prepare and deliver daily prestart briefings and safety toolbox talks
  • Manage bull gang resources to complete daily activities
  • Complete safety site inspections with client, PM and Transport NSW
  • Complete SWMS/TRA audits and participate in AMS briefings to workers
  • Participate in daily and weekly planning meetings
  • Complete daily site diary/ shift reports and works
  • Organizing and managing sub-contractors
  • Manage Tunnel Civil Fit out (TCF) subcontractors delivering multiple FRP scopes of tunnel XPs/LEPs/Substations/Ventilation structures
  • Rebolt, spray and strip drains.

Form Worker – Concrete Finisher Leading Hand, Track slab slip form paver

John Holland
04.2017 - 11.2017
  • Hazard detection and control
  • Steel fixing
  • Formwork
  • Track slab paving
  • Hand pours
  • Concrete placing
  • Concrete finishing
  • Intersection track slab pours
  • Sub grading and earthworks
  • Blinding and finishing
  • Curing concrete
  • Infill pours between track slab.

Concreter/ Structures Supervisor – Bridges

Folwick Construction
01.2016 - 03.2017
  • Steel fixing
  • Formwork
  • Adhering to WH&S procedures
  • High risk works
  • Abutments
  • Head stocks
  • Woking closely with engineers and their specifications
  • Organizing and managing Sub contractors
  • Place and finish concrete of bridge work
  • Hand pouring
  • Forming stitch pours
  • Placing concrete
  • Finishing concrete
  • In charge of handwritten SWMS, Start cards.

Foreman- NRMA building maintenance/ Insurance work

Abdul Osman
09.2014 - 01.2016
  • Adhering to WH&S procedures
  • Inspection of damages
  • Roofing
  • All carpentry work
  • Concreting
  • Gyprock installation
  • Kitchen installation
  • Supervising a team of 25
  • Planning work load and giving directions
  • Ordering materials
  • Working in with engineers
  • Organizing and managing Sub contractors
  • Scheduling specialist trades
  • Quoting work.

Carpentry and Concreting Supervisor

George Tannous
06.2013 - 08.2014
  • Formwork
  • Fix outs
  • Frame work
  • Concreting
  • Adhering to WH &S procedures
  • Organizing and managing sub-contractors
  • Building high end complexes
  • Sub grading.

Carpentry and Concreting Leading hand

Metro Building Supply
05.2012 - 06.2013
  • Adhering to WH &S procedures
  • Building high end complexes at Balmain and Newtown, Sydney NSW
  • Building granny flats
  • Steel fixing
  • House extension
  • Fit out
  • Organizing and managing sub-contractors
  • Sub grading
  • Concreting
  • All carpentry
  • Formwork
  • Any other duties that are required of me.

Domestic concreting Supervisor

Warren Krough
03.2011 - 05.2012
  • Form wok
  • Place concrete
  • Finish concrete
  • Adhere to WH&S procedures
  • Organizing and managing sub-contractors
  • Interpreting plans
  • Working closely with engineers and their specifications
  • Government contracted works for upgrade of St Colombia Anglican School
  • Pricing and tendering works
  • Sub grading and earthworks
  • Excavation.

Building maintenance/ Concreting/ Tendering for works

Crocker Construction
04.2008 - 03.2011
  • Adhering to WH&S procedures
  • Domestic concreting
  • Council contracting with public works, such as Cowarra damn and pump house
  • Interpreting plans
  • Organizing and managing sub-contractors
  • Woking closely with engineers and their specifications
  • Forming suspended slabs
  • Building pits.

Dairy and freezer manager

BI-LO - Laurieton
02.2002 - 03.2008
  • Manage a team of four
  • Stock control
  • All aspects of ordering
  • Customer service
  • Customer complaints and enquiries
  • Replenish stock.

Fruit and veg

BI-LO - Laurieton
12.2000 - 02.2002
  • Customer service
  • Replenish stock
  • Stock control.

Licensing

  • Certificate IV in Civil Construction - Supervision
  • Work Safely as a Safety Observer/Spotter
  • Occupational First Aid
  • Conduct Civil Construction Wheeled Front End Loader
  • Conduct Civil Construction Skid Steer Loader Operations
  • Excavator Operator
  • White Card
  • Grey Card for Bridges
  • Car License

Attributes

  • Effective Communicator: Articulate and adaptable communicator with strong interpersonal skills, able to work effectively with diverse teams and stakeholders.
  • Honest and Reliable: Demonstrates strong ethics and integrity, taking ownership of tasks and responsibilities with a high level of accountability.
  • Flexible and Adaptable: Proven ability to thrive in dynamic environments, adapting to changing demands and priorities with ease.
  • Time Management Expert: Skilled in prioritizing tasks, managing time effectively, and meeting deadlines with a high level of productivity.
  • Collaborative Team Player: A supportive and inclusive team member who fosters positive working relationships and contributes to a productive team culture.
  • Results Oriented: Driven to deliver high-quality outcomes, meeting and exceeding expectations with a focus on continuous improvement.

References

  • Vincent Ganet, Ghella Project Manager TBM's - Western Sydney Metro, 0429 367 636
  • Ruben Omar, Ghella Senior Project Engineer - Western Sydney Metro, 0478 026 115
  • Scott Connor, John Holland Construction Director, 0447 464 036

Timeline

Civil and Tunnel Forman

CPB Constructions
01.2022 - 05.2024

Civil and Tunnel Forman General Forman TCF for structures, XP and LEP’s

CPB Constructions
01.2020 - 01.2022

TBM Shift Boss for 6 months

CPB Constructions
01.2019 - 01.2020

Shift Boss BEW, Services, NFC, XP, Slip form paver, Barrier back fill and V Drain

CPB Constructions
11.2017 - 01.2019

Form Worker – Concrete Finisher Leading Hand, Track slab slip form paver

John Holland
04.2017 - 11.2017

Concreter/ Structures Supervisor – Bridges

Folwick Construction
01.2016 - 03.2017

Foreman- NRMA building maintenance/ Insurance work

Abdul Osman
09.2014 - 01.2016

Carpentry and Concreting Supervisor

George Tannous
06.2013 - 08.2014

Carpentry and Concreting Leading hand

Metro Building Supply
05.2012 - 06.2013

Domestic concreting Supervisor

Warren Krough
03.2011 - 05.2012

Building maintenance/ Concreting/ Tendering for works

Crocker Construction
04.2008 - 03.2011

Dairy and freezer manager

BI-LO - Laurieton
02.2002 - 03.2008

Fruit and veg

BI-LO - Laurieton
12.2000 - 02.2002
SHANNON QUINN