Summary
Overview
Work History
Education
Skills
Timeline
Generic

Shaun Hoareau

Mundoolun,QLD

Summary

Resume Shaun Hoareau Project Manager SUMMARY I am a Mechanical Engineer with a diverse range of proficiencies and experience. I am highly skilled in the planning and management of specialist projects and possess a high level of practical knowledge. My philosophy encompasses the building of strong personal relationships so as to maximise the effect of working within a team environment. My background stems from a strong design knowledge that was born from hands-on experience in the Processing Industry, which then progressed into the International Market undertaking projects for various world-leading companies. My experience in the Construction Industry has expanded my knowledge of Project Management, Industry Health and Safety and Subcontractor Management, Fabrication and OEM Expediting, and Procurement. I have developed a wealth of experience in both the Design and Construction Industry. Having worked in both disciplines enables me to understand Projects from the initial design stages through to Practical Completion. This also attributed to my practical knowledge in Process Engineering and Construction sector for Structural, Mechanical, and Piping disciplines. Latterly I have undertaken Business Development and Sales tasks to expand the company's market position. AREA OF EXPERTISE Safety Leadership with a Zero Harm focus Structured Work Ethic Communication, Time Management and Commitment to Problem Solving Technical, Commercial & Financial Management Collaborative Approach with commitment to Team Building and Leadership

Overview

22
22
years of professional experience

Work History

Business Development Manager, Sole Trader Contractor

James Hardie
, Qld
07.2023 - Current
  • Fabrication supply (SMP) to Bravus and Sedgman Mining Projects (Bravus; Kestrel & Olive Downs) Kestrel Coal Resources – Dry Disposal project, Emerald, Queensland
  • BHP – 1000t Surge Bin, Olympic Dam, South Australia
  • Downer Group – Technical Resource Pre-Contracts Team (Mining; Energy & Industry) QCLNG Project Airport Link, Brisbane, 28 years of professional engineering experience
  • Shaun Hoareau Mobile: 0422657909 email: shaun.hoareau@gmail.com Mount Isa Mine – Lead / Zinc Process Upgrade Dysart Mine – Coal Wash Plant, Stock Yard & Train Load-Out Moura Mine – Coal Wash Plant & Stacker / Reclaimer Construction, Role included Business Development, Sales, and Estimating
  • Various Client relationship (River Sands; Riverside Marine; IOR/Caltex;, ; West Rex;
  • Biocare Projects.

Project Manager

WDT Engineers
06.2021 - 06.2023
  • Role included the development of Project Scope of Works, Design Coordination, Fabrication
  • Coordination, Expediting, Project Management and Construction Management in the Mining Industry
  • Bravus (Carmichael Mine II) – Structural, Mechanical & Platework modularization
  • Sedgman (Olive Downs Mine) – Mechanical; Piping, Structural & Platework; Modularization
  • DRA Global – (Carmichael Mine I) - Mechanical; Piping, Structural & Platework; Modularization.

Project Manager

10.2020 - 06.2021
  • Role included development of Project Scope of Works, Design Coordination, Fabrication
  • Coordination, Expediting, Project Management and Construction Management for small Sand Mining
  • Projects ($2M); Holcim Quarry Upgrade ($1,5M) & Sand Mine Wharf upgrade on Brisbane River
  • Holcim Crusher station refurbishment – Structural, Mechanical & Platework
  • Southern Pacific Sands new Trommel Project– Mechanical; Piping, Structural & Platework Riverside Industrial Sands New Wharf Structures– Structural and

Senior Project Engineer

Downer EDI Construction East, Mining, Energy & Industrial
01.2018 - 06.2020
  • Responsible for the technical development of Scopes of works and constructability within the pre- tender and bids teams through to the development phase of the project
  • Thereafter being project based in a support function doing QA; Fabrication Coordination & Expediting roles on the following Projects: BHP 1000T Surge Bin – Structural & Platework Packages Kestrel Mine Dry Disposal project – Mechanical; Piping, Structural & Platework

Owner / Director

SMH Technical – Brisbane Orora Group & Visy Beverage
Cans, Qld
01.2015 - 01.2017
  • Specialised in projects for the beverage canning industry, focusing on re-engineering existing equipment and structures to meet modern day HSEA requirements and minimizing capital expenditures and managing site installations
  • Shaun Hoareau Mobile: 0422657909 email: shaun.hoareau@gmail.com Re-engineered existing conveyors and equipment saving on Capital Expenditure Project Installation completed on time during production shut-down window within budget
  • Project Engineer at Thiess QCLNG (BG Group) Fabrication Coordinator, Structural Steelwork
  • Package AU$8M (approx
  • 1150T Structural Steel

Project Engineer

01.2012 - 01.2015
  • Responsible for all structural steelwork fabrication packages on the QCLNG Project
  • Fabrication Coordination & Expediting of Structural Steel and Equipment packages
  • This included 18 field compression stations and 3 compression process plants
  • I managed fabrication of all the
  • Structural Steel in Queensland, New South Wales and Victoria for 2 years and spent two months doing pre-commissioning checks on pipe lines and reinstating prior to MC on one of the CPPs
  • Met construction milestones with all packages as per schedule Managed fabricators within budget.

Project Engineer, Lead / Zinc Process Upgrade

Thiess
, Qld
01.2009 - 01.2012
  • (Mechanical) – Airport Link, AU$4.3BN, Seconded to the MEFT (Mechanical Electrical Fitout Team) at start-up to work with Tunnelling Team and civils on design reviews and work pack structures
  • On completion of civil structures, I was moved to Construction Team to manage the tunnel fit out for fire services, exhaust fans, tunnel drainage, electronic signals and signs
  • I also managed vendor equipment undergo CSIR fire testing and obtaining relevant fire certifications
  • Over 500,000hrs (excl subcontractors) LTI free Managed work packs for 4 crews (60 men) Modified Work Platform design to increase productivity and safety during Tunnel fitout Initiated concept design to have modular Fire Services Skids in tunnel cross passages, reducing site work by 80% which hugely reduced costs and safety issues Created and Facilitated JSEA’s in conjunction with crews

Project Engineer

Thiess
01.2008 - 01.2009
  • Created work packs and installation procedures for new equipment and “cut and shut”
  • Managed installation of conveyors and weigh belts on brownfield site
  • Developed ITPs and work flow packages
  • Completed all installations within process shut down time frames Designed rail jig system which facilitated interface of machinery changeout during shutdown periods This enabled pre-assembly alongside live process systems Created and Facilitated JSEA’s in conjunction with crews
  • Project Engineer at Thiess (Mechanical) – Dysart Mine Coal Wash Plant, Stock Yard and Train
  • Load-out Construction, Qld 2008
  • Managed work packs and generated standard work procedures/installation procedures for equipment
  • Managed construction of sub terrain coal valves, stock yard rotary stacker and train loading structure and transfer conveyors
  • Developed ITP’s and work flow packages
  • Completed construction ahead of schedule Managed 3 construction crews (3 Supervisors and 36 men) Conducted pre-start meetings Created and facilitated JSEA’s in conjunction with crews
  • (Mechanical) – Moura Mine Coal Wash Plant and Stacker/Reclaimer

Construction
, Qld
01.2006 - 01.2008
  • Managed work packs and generated standard work procedures / installation procedures for equipment
  • Managed installation of equipment and piping in coal prep plant
  • Developed ITP’s and work flow packages
  • Inspected equipment and plate-work deliveries (pumps, centrifuges, chutes
  • Shaun Hoareau Mobile: 0422657909 email: shaun.hoareau@gmail.com screens and piping spools)
  • Factory and fabrication facility inspections to ensure delivery as per schedule
  • Met construction schedule and overcame design setbacks Completed CPP construction ahead of schedule and was moved to product handling area to drive construction
  • MC was as per schedule
  • Over 1.5 Million LTI free man hours (excluding offsite subcontractors).

Project Engineer

Heat & Control Pty Ltd
Brisbane, Qld
01.2003 - 01.2006
  • Reporting directly to the client, and liaising with Engineering Management and Directors
  • Project
  • Management for various international based clients in food processing and product handling equipment
  • Implementing current and new technology to ensure “cutting edge” systems for clients
  • Continual development of systems and supervising of design using AutoCAD design tools
  • Managed 4 draftsmen for design and fabrication Project Managed onsite installation of structures and equipment Designed Modular Structural systems to significantly reduce onsite installation time and costs
  • Conducted trials and testing of new innovations to meet and exceed customer requirements
  • Project Managed various Frito-Lay projects worldwide.

Education

Mechanical Engineering - Technician

Cape Peninsula University of Technology, South African Defence

undefined

Skills

Project Management

undefined

Timeline

Business Development Manager, Sole Trader Contractor

James Hardie
07.2023 - Current

Project Manager

WDT Engineers
06.2021 - 06.2023

Project Manager

10.2020 - 06.2021

Senior Project Engineer

Downer EDI Construction East, Mining, Energy & Industrial
01.2018 - 06.2020

Owner / Director

SMH Technical – Brisbane Orora Group & Visy Beverage
01.2015 - 01.2017

Project Engineer

01.2012 - 01.2015

Project Engineer, Lead / Zinc Process Upgrade

Thiess
01.2009 - 01.2012

Project Engineer

Thiess
01.2008 - 01.2009

Construction
01.2006 - 01.2008

Project Engineer

Heat & Control Pty Ltd
01.2003 - 01.2006

Mechanical Engineering - Technician

Cape Peninsula University of Technology, South African Defence

undefined

Shaun Hoareau