Summary
Overview
Work History
Education
Skills
References
Languages
Timeline
Generic

SHERIN MATHEW

Canning Vale, Perth,Australia

Summary

I am a self-motivated ‘Maintenance & Reliability Engineer’ with 2 years’ experience in the ‘Asset Management’ space within the Mining Industry. I specialize in operation readiness projects and am familiar with the end-to-end processes and deliverables throughout project lifecycle.

Overview

2
2
years of professional experience

Work History

Consultant (Specialist Assets) - Client: BHP

DELOITTE
Perth, WA
01.2024 - Current
  • Conducted a BOM & Spares review and catalogued materials in SAP 'Spares finder' after reviewing GA drawings, SLDs and part's lists.
  • Extracted SAP data and developed a detailed FLOC structure with assemblies and materials.
  • Developed a detailed maintenance build with strategy recommendations for 'Distribution Boards', 'Power distribution panel', & 'Air Conditioning Units' within the 'Ore Car Repair Workshop' building at Nelson Point
  • Conducted workshop with relevant site reliability engineer to review FLOCs, strategies & BOM and to confirm actions
  • Involved in taking meeting minutes and facilitating client communications
  • Also responsible for creating and maintaining a query register.

Consultant (Specialist Assets)

DELOITTE
Perth, WA
11.2022 - 01.2024
  • Project management responsibilities including weekly progress meetings with client, fortnightly reports sent to client, scope variation budgeting as well as timesheets and invoicing
  • Developed FLOC structure for greenfield equipment and created new FLOCs, CTs and Assemblies
  • Extracted SAP data and developed a detailed maintenance build which serves as a summary of recommended PM strategies including plans, items, task lists, operations, and documents
  • Conducted workshops with stakeholders to finalise and agree upon recommended strategies
  • Drafted new 'Preventive Maintenance Instruction' documents for greenfield equipment like conveyors, reclaimer, transfer stations and substation & updated existing documents for brownfield mining equipment
  • Used BHPs 'D2' document portal to workflow documents through the review & approval processes all the way to publishing the documents
  • Created DIR (1SAP unique) numbers for documents published in D2 and linked the documents to their relevant task lists
  • Identified critical parts to be added to task lists and conducted a gap analysis for brownfield equipment
  • Developed load sheets and raised master data requests to implement strategies in SAP
  • Data Controller' responsibilities including progressing master data requests as well as implementing the changes in SAP via ASI
  • Used APM software tools like data loaders to implement newly created strategies in SAP.

Reliability Engineer

NIHAR
07.2022 - 12.2022
  • Engineering input and review of design deliverables (documents and drawings)
  • Involved in project scheduling from start to finish
  • Project management responsibilities including fortnightly progress meetings with client, email communication with client and invoicing
  • Developed a 'Functional Block Diagram' to clearly visualise the different sections & components of the BARS plant such as 'Water Circulation', 'HCL Circulation' & 'Sulphuric Acid Circulation'
  • Developed a detailed equipment list with tags for all valves, instruments, pumps, tanks etc
  • Developed a FLOC structure for all the pipelines in the BARS plant
  • Developed a detailed 'FMECA' analysis for maintainable units of the BARS plant
  • Conducted 2 workshops (mechanical & electrical) with relevant stakeholders to review FMECA, finalise strategy recommendations and risk ratings
  • Submitted key project deliverables on time and within budget.

Reliability Engineer

NIHAR
Perth, WA
03.2022 - 06.2022
  • Engineering input and review of design deliverables (documents and drawings)
  • Involved in client meetings & in charge of taking meeting minutes
  • Developed a 'Functional Block Diagram' to clearly visualise the different components of the 'Hot Box Detectors' installed on railway tracks in BHP's WAIO sites
  • Conducted a BOM & spares review and catalogued materials in SAP 'Spares finder' after calculating min/max levels
  • Conducted a strategy gap analysis and recommended new strategies for brownfield HBDs
  • Updated PRTs like PMIs, WINs & datasheets
  • Developed load sheets to facilitate the strategy and FLOC updates.

Education

Master of Professional Engineering, Chemical Engineering -

University of Newcastle
11.2019

Bachelor of Engineering, Chemical Engineering -

Mahatma Ghandi University
05.2017

Skills

  • Asset Performance Management (APM)
  • Master Data (Fiori, D2, Loadsheets, ASI)
  • Microsoft Office Suite (Project, Word, Excel, Outlook)
  • SAP
  • Technical Drawings (SLDs, P&IDs, GA Drawings)
  • Excellent Communication Skills
  • Technical Documentation
  • Technical Presentations
  • Project Management Skills

References

References will be provided upon request.

Languages

English
Full Professional
Malayalam
Native/ Bilingual
Hindi
Native/ Bilingual
Arabic
Elementary

Timeline

Consultant (Specialist Assets) - Client: BHP

DELOITTE
01.2024 - Current

Consultant (Specialist Assets)

DELOITTE
11.2022 - 01.2024

Reliability Engineer

NIHAR
07.2022 - 12.2022

Reliability Engineer

NIHAR
03.2022 - 06.2022

Master of Professional Engineering, Chemical Engineering -

University of Newcastle

Bachelor of Engineering, Chemical Engineering -

Mahatma Ghandi University
SHERIN MATHEW