Summary
Overview
Work History
Education
Skills
Project
Languages
Timeline
Generic

Shu Wu

Melbourne,VIC

Summary

Adept Civil Engineer with a proven track record at Sun Engineering Consultants International, Inc., excelling in project management and AutoCAD. Spearheaded the Guangzhou Metro Station, showcasing meticulous attention to detail and expertise in excavation processes. Renowned for enhancing construction efficiency and quality, ensuring project excellence.

Overview

2
2
years of professional experience

Work History

Civil Engineer Draftsperson

Sun Engineering Consultants International, Inc.
04.2021 - 08.2023


  • Maintained clear and organized digital files to ensure smooth transitions between design phases, from pit excavation to the completion of the station's main load-bearing structure, enabling quick access and reference for the project team.
  • Used computer-aided design software to create blueprints and schematics for various stages of the project, including pit support, structural force analysis, and overall station design, supporting the engineering team in efficient construction.
  • Interpreted technical drawings, schematics, and computer-generated reports to revise CAD drawings, optimizing designs for underground pit excavation support and structural construction.
  • Meticulously checked dimensions, details, and notes on drawings before submission to clients or contractors, effectively reducing errors on-site, particularly during excavation and structural construction phases.

Education

Master of Engineering - Civil Engineering

University of Melbourne
Parkville, VIC
12-2020

Bachelor of Environment - Civil Engineering

University of Melbourne
Parkville, VIC
12-2018

Skills

  • Project management
  • AutoCAD proficiency
  • Cost estimates
  • Microsoft Office Suite
  • Attention to detail
  • Excavation processes

Project

  • Contributed to the design and development of major projects, including:

Guangzhou-Dongguan-Shenzhen Intercity Railway (New Baiyun to Guangzhou section) Airport Station

Guangzhou Metro Line 18

Guangzhou Metro Line 21

Underground connection passages between the subway and shopping malls

  • These projects encompassed all phases, from pit excavation to the completion of the main and secondary structures, ensuring seamless integration and high construction quality.
  • Analyzed data and utilized computer simulations to model and test design concepts for each phase of subway station construction, including excavation and structural stability, ensuring both safety and reliability.

Languages

Chinese (Cantonese)
Native or Bilingual
English
Professional Working

Timeline

Civil Engineer Draftsperson

Sun Engineering Consultants International, Inc.
04.2021 - 08.2023

Master of Engineering - Civil Engineering

University of Melbourne

Bachelor of Environment - Civil Engineering

University of Melbourne
Shu Wu