Summary
Overview
Work History
Education
Skills
References
Timeline
Generic

Sonny Hall

Darwin

Summary

Dynamic professional with a solid background in the Australian Army, excelling in first aid and safety compliance. Experience in concrete form construction and effective communication, ensuring project success through teamwork and adherence to safety protocols. Committed to maintaining high standards of performance and operational readiness in all tasks.

Overview

2
2
years of professional experience

Work History

Infantryman

Australian Army
Darwin
05.2024 - Current
  • Performed defensive and offensive operations in support of combat operations.
  • Assisted with the maintenance of weapons, equipment and vehicles.
  • Conducted training exercises to ensure proficiency in basic infantry skills.
  • Ensured compliance with safety regulations and standard operating procedures.
  • Rendered first aid treatment to injured personnel on the battlefield.
  • Maintained accountability of assigned personnel, weapons, equipment and supplies.
  • Constructed fortifications such as foxholes, trenches, bunkers and fighting positions.
  • Conducted daily physical fitness training to maintain combat readiness.
  • Conducted regular war games without live ammunition to practice scouting, attacks and counteroffensive movements.

Formwork Laborer

NTProform
Darwin
01.2023 - 05.2024
  • Measured, marked and cut lumber according to specifications provided by engineers or architects.
  • Set up ladders and rigging systems for workers who needed access to higher levels of the structure being built.
  • Cleaned up debris after completion of each phase of a project.
  • Operated power tools such as jackhammers, drills, saws, grinders. to cut and shape wood or metal components.
  • Lifted heavy objects using proper techniques while working in tight spaces safely.
  • Installed shoring systems to support vertical walls and slabs.
  • Assembled bolts, nuts, screws, clamps, ties and braces to secure formwork components together.
  • Ensured that all safety protocols were followed at all times on the jobsite.
  • Removed formwork components after concrete has cured using hand-tools or pneumatic chisels and hammers.
  • Constructed forms to create various concrete structures.

Education

Year 10 Completion -

Taupo Nui-A-Tia College
Taupo, NZ
11-2022

Skills

  • Concrete form construction
  • Power tool operation
  • Shoring system installation
  • Team collaboration
  • Effective communication
  • Formwork assembly
  • Formwork dismantling
  • First aid training
  • Concrete formwork
  • Physical fitness
  • Safety compliance

References

References available upon request.

Timeline

Infantryman

Australian Army
05.2024 - Current

Formwork Laborer

NTProform
01.2023 - 05.2024

Year 10 Completion -

Taupo Nui-A-Tia College
Sonny Hall