Experienced and detail-oriented Civil Engineer with a strong background in delivering infrastructure and asset maintenance projects within the public transport sector. Proven track record at Transport for NSW leading the planning and execution of road and pavement rehabilitation works across regional networks, with a focus on safety, compliance, and asset longevity. Skilled in conducting site inspections, identifying defects, coordinating repair strategies, and managing contractor performance to ensure quality outcomes. Demonstrated ability to apply sound engineering judgement to assess asset condition, investigate failures, and implement cost-effective and technically robust solutions. Proficient in SAP for project forecasting, accruals, and financial tracking, supporting accurate reporting and effective budget control. Adept at collaborating with diverse stakeholders including contractors, internal teams, and government bodies to resolve delivery challenges and align project outcomes with organisational objectives. Committed to ensuring the safety, reliability, and long-term resilience of critical infrastructure for the communities served.
T2M Metron – Bridges & Utilities Survey: The Sydney Metro project involves the survey of the existing bridges for the southwest metro comprising eight different bridges at eight different stations
Sydney Metro Marrickville Stabling Yard: The development comprises access roads, drainage line, and a huge culvert filled with well compacted sandstone for the Metro resting yard
Sydenham Station and Junction: Sydenham Metro upgrade contract involved upgrading Sydenham station to able to operate as part of the new Metro, including signaling works, utility relocations, and train control system installations.
Sydney Metro Bankstown Geotechnical investigation
Acciona Ferrivoal Joint Venture (AFJV): Sydney Metro Central tunnelling package contract involves the development of the station box and tunnelling from Port Access Road Rozelle, Five Dock, Burwood to Sydney Olympic Park to be able to operate as part of the new Metro tunnel including signalling works, utility relocations, and train control system installations.
Australian Rail Track Corporation Ltd (ARTC): Hunter Valley region track reconditioning contract involves upgrading track foundation, Culvert replacement at different stations of Werris creek, Parkville, Muswellbrook, Quirindi, Singleton.
M12 West Enabling Works (CPBGGJV): The Development comprises access roads and bridges for the new western Motorway.
TfNSW – Cambridge Avenue Upgrade (CAU) Glenfield: The CAU contract involves the upgrade of the existing road, design and maintenance of pavement and bridge at Glenfield