Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Syed Muhammad Fraz Gillani

Vermont,VIC

Summary

Electrical Engineer with in-depth knowledge of background developing, designing and testing new electrical systems. Possess excellent interpersonal abilities and a wide range of technical skills. Enjoy being part of a team, as well as managing, motivating, and training a productive team, and thrive in high-pressure and challenging working environments.

Overview

7
7
years of professional experience
1
1
Certification

Work History

Project Scheduler

Ventia
01.2023 - Current
  • Working mainly on three major Projects:

i. National Broadband Project. (NBN)

ii. Across Government Facilities Management Arrangement.

(AGFMA)

iii. Vector Electrical Metering.

  • Monitoring and updating progress through NOVUS and by using Gantt charts.
  • Helping Vendors and Technicians by coordinating and issuing tickets to them for different maintenance and installation tasks with correct artifacts.
  • Identifying risks and took corrective action as needed by reviewing daily KPI's.
  • Maintaining open communication by presenting regular updates on project status to customers.
  • Reported regularly to managers on project budget, progress and technical problems.
  • Managing time efficiently in order to complete all tasks within deadlines.
  • Planning network maintenance activities and programs.
  • Contributing to collaborative innovation by identifying continuous improvement initiatives and analysing and recommending improvements to current Ventia and NBN maintenance practices.
  • Tracking variations and its impact on schedule.
  • Monitoring productivity & earned value.

Work Group Supervisor /Team Leader - Project Management

AME Systems Pty Ltd
02.2021 - 08.2022
  • Leading and managing team of 40 to 50 technician/operators.
  • Exhibited strong commitment to quality assurance by meticulously examining finished products.
  • Issuing tickets to technicians for every phase of project inline with project timeframe.
  • Supervising manufacturing team for product integrity to line with Aerospace quality requirements (ISO9001, AS 9100)
  • Working with Engineering Technicians for technical improvements regarding 2D drawings, terminal issues and other cabling issues.
  • Implement, Operate and continuously improve WHS safety management system that conforms to AS/NZ4801
  • Planning and scheduling of day to day work using Microsoft Office
  • Completing corrective action reports for internal and external customer issues.
  • Testing harness with Multimeters.
  • Maximized efficiency by removing safety hazards and debris from work areas.
  • Coordinated weekly meetings for internal and external groups.
  • Monitored operating machinery to assess progress, adjust settings and maintain desired tension and speeds.
  • Set up and calibrated machinery to meet specific production requirements and meet desired tolerances.

Manufacturing Team Operator

AME Systems Pty Ltd
12.2020 - 02.2021
  • Working in assembly department building electrical wiring harnesses ensuring compliance with harness design and board diagrams
  • Participated in continuous improvement by generating suggestions, engaging in problem-solving activities to support teamwork.
  • Building of Electrical harnesses using product specification Testing and commissioning of electrical harnesses using wee and analog testers to check faults
  • Determining manufacturing errors or damage to be corrected before dispatch
  • Good understanding of different cables sizes using detailed documentation.
  • Collaborated within the assembly department, playing a crucial role in building highly intricate electrical wiring harnesses with over 200 circuits.
  • Ensured meticulous adherence to engineering technical documentation, including board visuals and drawings, to meet the highest quality standards.
  • Completing paperwork including batch sheets and check sheets of the associated electrical harness for QA/QC inspections
  • Examining finished products to ensure compliance with international standards and customer requirements.
  • Quickly learned new skills and applied them to daily tasks, improving efficiency and productivity.
  • Demonstrated respect, friendliness and willingness to help wherever needed.
  • Performed duties in accordance with applicable standards, policies and regulatory guidelines to promote safe working environment.
  • Used critical thinking to break down problems, evaluate solutions and make decisions.
  • Maintained excellent attendance record, consistently arriving to work on time.

Graduate Engineer

Fauji Fertilizer Company Ltd
07.2016 - 09.2017
  • Learned about the field instrumentation and how that integrated with the PLC control plus understanding how the process interacted with the equipment
  • Learned the Safety Integrated Level (SIL) requirements for the PLC controls in the plant enabled me to improve my knowledge of critical equipment and PLC control in the field
  • Key successes achieved:
  • Exposure about the key instruments in the field and the maintenance strategies to underpin critical equipment
  • Successfully maintained the uptime performance of the plant
  • Learned and performed electrical instrument calibrations
  • Established the ability to work in a competitive industrial organization.
  • Performed quality control procedures on equipment and materials.
  • Monitored project progress, ensuring conformance to design specifications and safety standards.
  • Revised instrumentation guidelines to address exceptions and provide clarification, where needed.
  • Monitored installation and operations to consistently meet rigorous customer requirements.
  • Troubleshot electrical equipment problems such as electro-valves and sensors.
  • Monitored and learned electrical control systems and also designed solutions for FFC.
  • Studied manufacturing processes to improve overall knowledge.

Education

Engineering Management

Central Queensland University
07.2020

Electrical Engineering

NFC Institute of Engineering And Technology
06.2016

Higher Secondary School Degree - Engineering (Pre-Engineering)

Board of Intermediate And Secondary Education
06.2012

Skills

  • Functional Skills:

Team Management, Teamwork, Emotional Intelligence,

Prioritization skills, Adaptability, Technology

Implementation, Continuous Improvement Planning, Agile

Work Processes, PPE Compliance, Work Planning and

Prioritization, Overtime Management, Contract Development

  • Technical Skills: Expert in: Programmable Logical Control (PLC), AutoCAD, Proteus and PSpice Intermediate in: Microsoft Office, MS Project Basic in: MATLAB, C, Java

Certification

  • Work Health and Safety 2020 National Examination Board in Occupational Safety and Health (NEBOSH).
  • Programmable Logical Control (PLC's) 2015 Pakistan Industrial Technical Assistance Center, Lahore.
  • Electrical Engineering Skill Assessment, Engineers Australia.

Timeline

Project Scheduler

Ventia
01.2023 - Current

Work Group Supervisor /Team Leader - Project Management

AME Systems Pty Ltd
02.2021 - 08.2022

Manufacturing Team Operator

AME Systems Pty Ltd
12.2020 - 02.2021

Graduate Engineer

Fauji Fertilizer Company Ltd
07.2016 - 09.2017

Engineering Management

Central Queensland University

Electrical Engineering

NFC Institute of Engineering And Technology

Higher Secondary School Degree - Engineering (Pre-Engineering)

Board of Intermediate And Secondary Education
Syed Muhammad Fraz Gillani