Hard working reliable multi-skilled employee with strong work ethic. Self-motivated individual who shows sound judgement and initiative in all work aspects with proven ability to work safely under pressure in dynamic environments to achieve goals within time frames. Good communication and team player seeking a new rewarding project
Overview
8
8
years of professional experience
Work History
Pipe Layer/ Labourer
Queensland Civil Engineering
11.2023 - 06.2024
Assembled and installed underground pipe for sewer and storm water using poly, concrete and FRC of various size.
Conducted thorough pre-installation site inspections to assess and prepare groundwork for pipe laying, minimizing disruptions.
Assist with forming and pouring sewer manholes and channel's, build gully pits, render and grout inside pits and manholes repair defects. set aspros and lids to manholes
Assist poly welders with setup and dismantle of poly welding machines, assist with process of Butt and EF welding process
Slinging and moving pipe around with mobile plant
assemble shore boxes of various sizes.
Used equipment such as rollers, dump trucks and front-end loaders to move important supplies.
Assist operators with trenching and backfilling
Operate excavator and trench rollers
Used hand signals to direct equipment operators and alert to hazards.
Maintained clean and organized work site, contributing to safer working environment for all personnel.
Enhanced workplace safety by consistently following standard operating procedures and wearing appropriate personal protective equipment.
Pipe Layer/Labourer
Pensar
10.2022 - 09.2023
Lay various sizes between 250/710 diameter recycled poly pipe
Prep pads for tunnel bore machines and horizontal directional drillers
Accurately trench to depths and grade using lasers
Read and interpret plans
Set concrete jacking pipes, fit spider bands to poly pipe to be pulled through jacking pipe
Build 10 Farm outtake pump sheds to house valve assembly
Conduct flange management for initial and final torque for commissioning pipeline
Spot diggers, assist with dog man duties, trenching, back filling, operate Roller Compacter
Assembled and installed underground pipe, fittings and valves of various sizes
Assemble and use shore boxing in various depths below surface
Used hand signals to direct equipment operators and alert to hazards
Observed and followed all safety measures, company equipment policies, environmental policies and procedures to prevent job site accidents
Used equipment such as rollers, trucks and front-end loaders to move important supplies
Read and understood drawings, written instructions and blueprints to plan work and layout pipe
Followed plans to locate existing utilities prior to digging and flagged locations for operators
Skilled at working independently and collaboratively in team environment
Proven ability to learn quickly and adapt to new situations
Identified issues, analyzed information and provided solutions to problems
Demonstrated respect, friendliness and willingness to help others
Developed and maintained courteous and effective working relationships
Pipe Layer/ labourer
Di Tulie Construction
10.2022 - 10.2022
Spot diggers trenching and back filling, trench to grade and depths using lasers, use pipe lasers,
Graded or leveled trench bases using hand tool
Used electro fusion welder and couplings to join pipes
Assembled and installed underground pipe for mains water, storm water and sewer
Observed all safety measures and company equipment policies to prevent job site accidents
Followed plans to locate existing utilities prior to digging and flagged locations for operators
Worked effectively in fast-paced environments
Paid attention to detail while completing assignments
Followed site specific operation plans
Followed environmental policies, procedures and plans
Civil Labourer
MI Electrical
07.2022 - 10.2022
Lay conduit for electrical and data cable
Night works
Install pits for conduit and cable
Build concrete pads for VLS cabinets
Spot diggers auguring for light poles, trenching back filling
Use MR and HR trucks to deliver material for back filling and remove material from site to lay down area
Use laser to shoot heights accurately
Install steel footing and bolts for streetlights, CCTV and Hwy lighting
Work to Transport Main Roads specifications and procedures
Follow traffic management plans
Follow environmental policy, procedures and plans
Maintain high standard of work place health and safety
Use laser to check heights and grades for footings and trench's
Steel fixing and tying
Laying sewer and storm water pipe
Followed plant safety procedures, rules, and regulations.
Adjusted and maintained plant equipment for safety and performance.
Conducted safety inspections and followed safety rules and procedures.
Performed minor mechanical work and routine equipment maintenance.
Recorded inside and outside process readings on daily log sheets.
Knowledgeable of machine maintenance in order to troubleshoot effectively.
Adhered to EPA and OSHA regulations.
Handled preventive and corrective maintenance to maintain proper equipment safety and functionality.
Machine operator
RCP pipes
02.2016 - 02.2020
Operated machining equipment safely with team of operators on rotating 24/7 day, afternoon and night shift roster
Operated multiple machines simultaneously to meet production requirements
Followed detailed instructions to operate machines with accuracy and produce quality products
Complied with company and OSHA safety rules and regulations
Set up and adjusted equipment and properly configured machines for daily operation
Set up and ran machinery to produce exceptional products for industrial needs
Loaded raw materials using front end loader, forklift and gantry crane into machines and unloaded finished products to keep manufacturing process running smoothly
Monitored machines during operation to detect sounds of malfunction or excessive vibration and adjusted machines to eliminate problems
Monitored boiler system, ball mills ,multiple storage tanks for raw product
Replenished materials and supplies as needed to maintain production
Calibrated, tested, and adjusted machine settings or controls in preparation for production operations
Assessed equipment after each production run and performed preventive maintenance to keep machines running smoothly
Maintained equipment performance by lubricating and cleaning components
Updated daily production logs and informed management of production incidents or non-conformance issues
Kept detailed production records and identified hold-ups
Made sure that products were produced on time and are of good quality
Maintained organized work area by cleaning and removing hazards
Inspected products and machines to maintain quality and efficiency
Inspected finished products for quality and adherence to customer specifications
Met production targets and tight deadlines by collaborating closely with team members
Organized and prepared workstations and materials needed for operations to maximize productivity
Used problem-solving and issue-resolution skills to promptly and successfully address production problems
Trained new production staff members on safe and efficient production procedures and proper machine operations
Assembled products according to changing daily work orders and specific customer needs
Adjusted machines to increase productivity for runs
Performed general equipment maintenance and repair to minimize downtime
Calibrated machines to maintain required productivity levels and adherence to quality standards
Investigated processing errors and malfunctions, resolving issues with minor machine repairs
Collaborated with other departments to optimize production workflows
Prepared reports and technical documentation of day-to-day production processes
High Reach Forklift
Arnotts Group
08.2016 - 10.2016
Education
Cert III Gas fitting -
2014
Year 10 -
Seymour Tech High School
1992
LICENCES -
Skills
Mechanical
Critical Thinking
Earth works
Pipefitting
Operating/Maintaining various plant
Problem-solving
Attention to Detail
Organization and Time Management
Team-oriented and dependable
References
Brett Reynolds
Supervisor Pensar Infrastructure
0421384682
Paul Creen
Supervisor Killards Civil
0416583123
Timeline
Pipe Layer/ Labourer
Queensland Civil Engineering
11.2023 - 06.2024
Pipe Layer/Labourer
Pensar
10.2022 - 09.2023
Pipe Layer/ labourer
Di Tulie Construction
10.2022 - 10.2022
Civil Labourer
MI Electrical
07.2022 - 10.2022
Civil Labourer/ Plant Operator
Main Construction
05.2020 - 10.2022
High Reach Forklift
Arnotts Group
08.2016 - 10.2016
Machine operator
RCP pipes
02.2016 - 02.2020
Cert III Gas fitting -
Year 10 -
Seymour Tech High School
LICENCES -
Similar Profiles
Salote ToganivaluSalote Toganivalu
Assistant Case Manager (TAM Team) at Queensland Civil And Administrative TribunalAssistant Case Manager (TAM Team) at Queensland Civil And Administrative Tribunal
Assistant Professor at Department of Civil Engineering, Zeal College of Engineering and Research, Narhe.Assistant Professor at Department of Civil Engineering, Zeal College of Engineering and Research, Narhe.