Projects worked on with Exact Earthmoving include,
BHP Southflank : rail duplication, bulk earthworks and detailed earthworks.
BHP Nelson Point and Finucane Island : dust sealing( detailed earthworks for asphalt laying. Austral Construction rail shutdowns.)
Albany Ringroad : all aspects of bulk earthworks and detailed earthworks.
Gruyere Goldmine : tailings damn all aspect of earthmoving, bulk and detailed with a 30 tonne GPS digger.
Assisted in site preparation tasks, including clearing debris and vegetation, ensuring a safe work environment for all team members.
- Dug ditches and trenches using trench rollers, rammers and shovels for small-scale excavations.
- Collaborated with other heavy equipment operators to coordinate movements and optimize work zone safety.
- Supported crew members in various tasks such as grading terrain, leveling surfaces, or compacting soil when necessary.
- Supported construction projects by efficiently loading trucks with excavated materials for proper disposal or reuse.
- Demonstrated precision in trench digging for utility installations, minimizing disruption to surrounding areas.
- Drove construction equipment to excavate and grade land on road beds.
- Achieved optimal excavator performance by diligently following manufacturer recommendations for equipment use, maintenance, and care.
- Reduced downtime by promptly troubleshooting and repairing minor mechanical issues with the excavator.
- Maintained positive relationships with clients, addressing their concerns and providing updates on project progress.
- Calculated slopes and grades, performed ground surveys and used pipe lasers for pipe laying.
- Ensured accurate digging depths by utilizing GPS technology and laser-guided systems.
- Minimized risk of injury during operation through strict adherence to OSHA safety guidelines and best practices in the industry.
- Contributed to environmental sustainability initiatives through responsible soil management and erosion control practices.
- Strengthened communication within the team by participating in regular safety meetings and debriefs following each workday.
- Enhanced worksite safety by performing daily equipment inspections and maintenance tasks.
- Improved overall job satisfaction among crew members by consistently displaying a strong work ethic, professionalism, and dedication to teamwork.
- Coordinated machine actions with other crew member activities by positioning and moving loads to necessary locations.
- Increased project efficiency by collaborating with team members to complete excavation projects on schedule.
- Performed repairs on excavator engines, throttles and pedals.
- Streamlined workflow processes through effective coordination with supervisors regarding daily activity plans and priorities.
- Upheld compliance with federal regulations regarding excavator operation, contributing to safe work environments on all job sites.
- Mitigated potential hazards by staying informed about current weather conditions and adjusting excavation activities as needed.
- Maximized fuel efficiency through careful planning of routes and strategic use of machinery during operation periods.
- Facilitated timely completion of excavation projects by strictly adhering to established guidelines and schedules.
- Implemented strict safety measures on job sites, reducing accidents [Number]%.
- Performed equipment inspections before and after each shift, turning in equipment logs to supervisor.
- Followed markers, work instructions and hand signals to complete accurate work.
- Followed exact digging plans within capabilities and limitations of available machinery.
- Adhered to strict safety requirements for digging, machine operation and personal behaviors.
- Followed standard operating procedures as guidelines for operating and maintaining vehicles.
- Operated excavator to dig on and around live utilities in underground or telecom utility fields.
- Notified supervisor to escalate issues needing further investigation or study.
- Moved levers, pushed pedals or turned valves to control equipment.
- Readied sites with manual work such as hand shovel and materials distribution.
- Employed safe digging practices in line with machine capabilities and limitations to prevent hazards.
- Checked to make sure that trench excavations met correct depth.
- Maintained pit with regular cleanings and removal of obstacles such as mud and rock.
- Adjusted dig face angles for overburden depths and set correct lengths.
- Created ramps for smooth movement of heavy loads between site locations.
- Completed shoveling at job sites to finish appearances and achieve precise specifications.
- Created inclines and ramps by moving and tamping down earth as well as gravel for top layers.
- Coordinated machine actions with crew members using hand or audio signals.