Summary
Overview
Work History
Education
Skills
References
Timeline
Generic

Thomas Elliott

Burleigh Heads

Summary

  • Dependable, confident, enthusiastic, dedicated team player and solid work ethic, consistently meet project deadlines and budget goals.
  • Licensed Plumber Contractor and business owner committed to providing superior technical skill and excellent customer service. Very approachable person with great people skills and feel I would be a great attribute to your organisation.
  • I have 20+yrs of experience in the Plumbing industry
  • In this time I've achieved all aspects in the Plumbing industry ranging from: - Mining / Construction / High Rise / Commercial / Sub Divisions / Resorts / Hospitals / Schools / Housing / Referbs / Maintenance.
  • Mining Experience (Gas, Oil, Coal, Iron Ore) include:

- Construction of mining camps ranging from 200 - 6000 man

- Construction / Installation / Maintaining and monitoring camps

- Construction and Installation of 'Roy Hills' Bulk Diesel Plant (Mechanical Plumbing)

- Mains Water, Sewer, Fire, gas, Blue Brut, Polywelding, HV and Comms conduit.

- Sewer pump stations

- Reverse Osmosis 'RO' plant (water purification)

- Waste Water Treatment Plants (MBR)

- Fire Pump house installation / commissioning / Maintenance

- Bore spike and pump out lines

- Diesel Tank erection

- Pump Skid installation

- Retention and Storage tanks

- Mechanical Plumbing, valves, roll groove cast 0 - 500mm

- Laser levels, heights for graded earthworks

- Dewatering

- Dogging and Rigging

- Watercart operation

- Escorting Mining equiptment, Triple road train deliveries through mine site.

- Excellent knowledge and understanding of the importance of Safety, JHA, MSDS, PPE etc

- Experienced in the understanding of the importance of quality work and preventative maintenance of commercial kitchens and camp facilities.

  • Regional Construction Plumbing include:
  • Construction / High Rise / Commercial / Hospitals / Sub Divisions / Roads / Schools / Resorts / Housing / Referbs / Housing.

- All mains services: Water, PVC Drainage, Manhole construction, Stormwater, Gas Fire, Rising Mains, Ring Mains... etc

- All materials for the above mentioned: Blue Brute, Poly, Gal, Iron, Copper, PVC, HDPE, Concrete, K2, Rehaeu, Pixel... etc

- Grease Traps / Oil and Grease separators

- Manhole Construction

- Fire Pump Facility

- Banks of Hot Water Units

- School Maintenance Sheds / Bus Bays

- Sub Division Inground Works and Earthworks. Laser and Pipe laser accuracy

- Under slabs with Pipe Laser and Laser accuracy

- Council Meters and Valve Trains

- Copper Meter Manifolds

- Deck Layouts, Penotrations, Water and Gas loops,

- Stacks: PVC, Copper, HDPE

- Rough Inns: Copper, K2, Rehaeu, Shark bite

- Roofing

- Stormwater: Downpipes, Pits, Aggy Drains, Seperator Tanks

- Inslab Pipework - example: Podium Deck

- Budget / Time and Labour management

- All Commissioning through Local Council and Fire Department meeting all legislations (AS3500), Gas and Fire Regulations

- Hospital Grade Plumbing

- Attending weekly subcontractor meetings, accessing site programs, sorting site issues for smooth works

- Working in with Developers, Project Managers, Builders, Site Forman, Crane Operators and Heavy Machinery

- Completeing all 'As Constructed' plans and variations through the correct channels and Local council.

Overview

23
23
years of professional experience

Work History

Plumber

Virtue Plumbing
11.2023 - 02.2024
  • Plumbing installations to a multi commercial unit infrastructure
  • Kings storage shed consisted of 150mm victolic fire mains to 2x 3 storey storage sheds. 2x fire hose reels per floor, 10x fire hydrants, street water main meters, 25mm copper water mains, stormwater pit construction.
  • Other facilities required kitchenette facilities and fitoff, 150mm fire water mains underneath the podium, all sewer and 50mm copper water mains.
  • All works were carried out after morning co ordination meeting with the site forman and client management.
  • This project had a very tight program so logistics and co ordination were key for the program to run seamlessly.
  • All aspects of plumbing were met meeting local authority and Australian standards

Plumber Supervisor

Blue Mojo
02.2022 - 11.2023
  • Supervised 2x jobs over the duration of employment
  • QLD government Emergency Disaster Centre
  • 9 storey 90 unit complex
  • All of which include:
  • Mains services, H-Patterns / Booster pump skids, Sewer, man hole construction, stormwater, rough inns, fitoff, polywelding, Fire tanks, Backup water tank, Deck work, underslabs, pump and treatment facility, sump pumps and rising mains.
  • All aspects of plumbing were covered on the above mentioned tasks
  • The Emergency Disaster Centre was a tier 1 project under Hansen and Yunkan. All works were performed to meet class 5 cyclonic disaster conditions.
  • Conversed with Project Managers, site supervisors, fellow trades, cranes, concrete pumps, machinery
  • All installations are installed with a sound knowledge of AS3500 and local bi-laws.

Plumber Supervisor

Aquatech Coastal Plumbing
10.2020 - 02.2022
  • All aspects of Plumbing from new installations, commercial, housing, sub divisions, semi - highrise, schools, factories, shop fittout. Commercial Maintenance.
  • All of which include:
  • Mains services, H-Patterns / Booster pump skids, Sewer, man hole construction, stormwater, rough inns, fitoff and polywelding
  • Identifying maintenance issues and resolving problems promptly and efficiently.
  • Conversed with Project Managers, site supervisors, fellow trades, cranes, concrete pumps, machinery
  • All installations are installed with a sound knowledge of AS3500 and local bi-laws.

Plumber Supervisor / Project Manager

Precision Services
01.2020 - 10.2020
  • Plumbing Supervisor / Project Manager of 800man camp, Kitchen and Dining, EPCM Office facilities for Worleys on the Koodiaderi Mines and Camp facilities
  • Work consisted of co-originating and designing civil / hydraulic / Electrical works on 3x site locations.
  • 800 man camp consisted of Hydraulic mains services, water, fire, rising sewer mains, pump station, Ro plant and water treatment, Sewer install, HWU, chlorination, flushing and testing
  • Kitchen infrastructure consisted of Sewer, hydraulic mains services, water, fire, sewer pump systems, Bank HWU installations, commercial Appliance install and fitoff, chlorination, flushing and testing.
  • EPCM office infrastructure included civil works, Installation of hydraulic services, rising main, pumpstation, RO water treatment plant, HWU, commercial fitoff, chlorination, flushing and testing.
  • Heavy macinery consisted of 5x Excavators 5 - 30tonne, 3x loaders, screed machine, 4x bobcats, watercarts, Pumping skids and polywelders.
  • Programming and delegation of works for 30-40 workers over 3 different locations. Pre starts and de- brief occurred everyday with full discussion of all aspects of the tasks performed.
  • Safety is a key focus of all tasks onsite. All paperwork, JHA's to 3mth servicing and reporting on all plant, testing and tagging, licencing, competent staff with complete knowledge of tasks being performed, addressing fellow trades in vicinity for safe works. Barricading, signage, PPE is required in work areas. Competent escort personnel for deliveries to site.
  • Liaising with EPCM staff, project management, construction management, Engineering and design teams. All plans are thoroughly discussed before and work proceeds to ensure no clashes and good flow and seamless integration through programmed works.
  • Streamlined inventory management by regularly monitoring stock levels, maintaining accurate records, and ordering supplies as needed.
  • All commissioning procedures were undertaken to company policies and Australian standards, chlorination, flushing and commissioning.
  • This particular site was very remote so logistics was key in planning all tasks.

Plumber Supervisor

Aquatech Coastal Plumbing
07.2019 - 01.2020
  • All aspects of Plumbing from new installations, commercial, housing, sub divisions, semi - highrise, schools, factories, shop fittout. Commercial Maintenance.
  • All of which include:
  • Mains services, H-Patterns / Booster pump skids, Sewer, man hole construction, stormwater, rough inns, fitoff and polywelding
  • Identifying maintenance issues and resolving problems promptly and efficiently.
  • Conversed with Project Managers, site supervisors, fellow trades, cranes, concrete pumps, machinery
  • All installations are installed with a sound knowledge of AS3500 and local bi-laws.

Plumber Supervisor

Precision Plumbing
11.2018 - 07.2019
  • Supervisor over seeing / designing 600 man mining Camp for BHP in the Pilbara Western Australia.
  • Consisted of all inground civil works from Hydraulic Services ( Water, Fire, Recycled water ), Sewer, Rising sewer mains and Pump stations.
  • This facility consisted of RO plants, Fire pump skids, Sewer Pump stations, Bore pump systems, HWU install, all plumbing and Drainage to onsite buildings.
  • All Electrical civil works excavations with a sound knowledge of code / separation and height distances and exclusion areas between common services.
  • This application had all install, Flushing, chlorination and commissioning, procedures and reporting of all mentioned pipelines and facilities.
  • Held all work pre starts everymorning with 20+ employees on all work related tasks and safety standards for the days proceedings, with a full debrief in the afternoons.
  • Office duties consisted of administrative works. Creating test packs and procedures, JHA's, timesheets, redline drawings, daily and weekly reports, Hydraulic design to all applications of works.
  • Attended all supervisor meetings with Project management / construction management / engineering cliental on design and workfront programming.
  • Safety is a key aspect considered in all tasks performed on site. All areas are discussed and treated accordingly.
  • This site was very remote, ordering and controlling logistics of materials and plant helped provide competion of tasks in a professional manner.


Plumber Supervisor

Precision Plumbing
08.2017 - 11.2018
  • Supervisor overseeing the Hydrolic Installation Of the Mines Infrastructure at the Amrun Project in North Queensland
  • Consisted of all inground installations of Hydrolic services from Mains water, Rising Main, Fire lines, Raw water to all areas of earthworks.
  • The facility consisted of Mechanical workshops, welding bays, Tyre change bays, administration and crib buildings, emergency services, diesel fuelling stations, washdown bays, truck fill points, wastewater treatment plants, RO facility, fire pump skids, bore pumping wells, sewer pump stations, man hole subdivision to all final trip earthworks / drainage swales.
  • This application had all install, Flushing, chlorination and commissioning of all mentioned pipelines and facilities .
  • Held work prestarts every morning addressing 40+ employees on work related tasks and safety standards for the days proceedings with a full debrief in the afternoons.
  • Office duties consisted of all administrative works. Creating test packs and procedures, JHA's, timesheets, redline drawings, daily reports, Hydrolic design to all applications of works.
  • Attended all meetings with Supervisors, Project managers, company heads form Bechtel to Rio Tinto on design and work front targets and programming.
  • Safety was a key focus of mine in the field. All areas were treated thoroughly.
  • The site was very remote so good logistics and pre planning was the key to good progress and completeing all tasks on time in a professional manner.

Plumber

Connect / Broadspectrum
01.2016 - 08.2017

Manus Island Detention Center, PNG

  • This project had a vast variety in the work scope from Maintenance to new project work.
  • Maintaining the facilities of the centre, commercial kitchen, boiler units / commercial laundry, Medical centre / hospital, Camp facilities, Pump stations, WWTP, Reverse Osmosis plant and working in with a variety of trades.
  • Moved from general maintenance to running and maintaining the Desalination plants, polishing stations and WWTP Dual train MBR. Reverse Osmosis: Conducting daily checks on plant using the PLC board, conductivity, NTU, pressure sensor readings etc.. changing out 1 and 3 nominal micron cartridge filters, chemical clean membranes, Sea pumps, Feed pumps, High pressure pumps, system pumps, cleaning out disc filters, Daily water checks for PH / chlorine levels, echoli testing, checking all chemicals and dosing pumps. MBR: Daily checks / settle test, Nitrates, Nitrites, Phosperous, Amonia checks, Checking all mechanical parts eg. WAS, RAS, Filtrate pumps, changing flow rates and settings on PLC board to suit Influent coming into sysem and adjusting Floc to suit, General maintenance on plant.
  • Understanding and working under Australian Border Forces strict security guidelines.
  • Organising and setting daily tasks for the plumbing crew. 
  • Detailed paperwork of all tasks to be completed and submitted at the working day.
  • Working under extreme climate conditions, heat / humidity, given the location of the island.
  • 12hr days over 3week swings. Including call outs and shared room accomodation.
  • Understanding and respecting local customs and laws

Plumber Forman

Reid Plumbing
05.2015 - 07.2016
  • Currently Running a 30unit luxury apartmaents complex in Bond University, Gold Coast.
  • Have been on this job from day one where I've achieved all in ground services from mains sewer, water, fire, stormwater to Deck layouts, rough inns, stack systems, fit off. Fire pumping systems, hot water unit installation.
  • Worked in with the developer, Builder head management, hydraulic consultants, engineers, fire staff and site forman in the redesign of the current plumbing systems.
  • Interpreted blueprints to determine locations, quantities and sizes of materials required.
  • Expanded trade knowledge by networking with colleagues and participating in courses and seminars.
  • Independently worked on projects, while offering process coordination and cooperation with other teams.
  • Prepared detailed records of all project tasks from start to finish.
  • Trained and supervised all incoming employees.
  • Inspected structures to avoid any obstruction and delays throughout the project.

Plumber

Protek Plumbing
03.2015 - 05.2015
  • Protek Plumbing, Exclusive Lizard Island resort referberation on the Great Barrier Reef, North QLD.
  • Sound knowledge of national park guidelines, which had to be followed at ALL times during construction.
  • All aspects of plumbing during the rebuild of Day spas, restaurant, commercial kitchens, beach club, villas, staff accom, from ring mains, drainage, gas lines, elevated pipework, rough inns, HDPE drainage, copper pipework, commercial kitchen fit out, with knowledge of keeping the facilities live whilst working on certain sections of the build.
  • adjusted to North QLD climate, humidity, squally showers, cyclone prep to evacuation.
  • 4 and 10 roster FIFO
  • Obtained precise results by performing accurate hydrotesting.

Plumber / mechanical / Polywelder

Decmil Australia
09.2014 - 03.2015
  • Decmil Australia, Roy Hill Project,Diesel Bulk Fuel Facility.
  • 14 off loading diesel suction pump skids from train the line, feeding the bulk diesel tanks , for distribution throughout the Roy Hill Mine site. For machinery, road trains and surrounding facilities.
  • Active interaction with superiors, scope of works through to changes in design.
  • Sound knowledge appropriate permits for woks. Hot works, JHA, work method statements..
  • Installation and fabrication of 2 x Diesel Storage Tanks 12m wide x 14m high, assisting Crane crews in positioning plate work (walls) in erecting the tanks.
  • Installation of 14 x pump skids, 1 x Locomotive refueling skid, 1 x Super skid.
  • Preparation and installation of metal roll groove piping. Ranging from 25mm - 350mm
  • Pipe stand fabrication, cable / airline and pipework tray fabrication, stand heights calculated to the mm. Scabbling and grouting.
  • All mechanical aspects of diesel pumping systems, installation and commissioning of pumps, correct torque wrenching.
  • Preparation work for tank and pipe welders
  • Underground plumbing works include Diesel separation tank, sumps, drainage, water feeds, poly welded mains..
  • Escorting deliveries from the gate house through an active mine site, keeping clear and correct comms. triple road trains, concrete trucks etc.
  • Obtained precise results by performing accurate hydrotesting.

Plumber /Drainer / Gasfitter / Polywelder

ISS
01.2014 - 2015
  • Monitoring and maintaining Waste Water Treatment Plant
  • Monitoring and maintaining R O Plant
  • Monitoring Bore / Pumps
  • Conducting water purity tests
  • Maintaining commercial kitchen, appliances, laundries, 300+ demandables, pump stations, spray fields and gas services.
  • Conversing with management, deliveries and fellow staff members.
  • Interpreted site plans to determine locations, quantities and sizes of materials required.
  • Roster 4 and 1 FIFO

Plumber / Drainer / Gasfitter / Polywelder

Atomic Plumbing Services
12.2013 - 04.2014
  • All aspects of plumbing from new installations, commercial, housing, sub divisions, semi high-rise, schools, factories, shop outlets. Also including maintenance domestic / commercial.
  • All of which include:
  • Mains services of water, fire / H-patters / booster pumpskids, gas, sewer, manhole construction, storm water, rough inns, fit off and polywelding.
  • Conversed with project managers, other trades, cranes, concrete pump trucks, machinery...
  • All installations tested and inspected to AS3500 and local standards.

Plumber / Drainer / Gasfitter / Polywelder

Precision Plumbing for Atlas Iron / Decmil
07.2013 - 12.2013
  • Completed Mt Webber mining camp from start to finish. Including all attributes of plumbing in the construction of this 200man camp.
  • Installation of :
  • 2x Waste water treatment plants / 1 of which was a temporary plant and pump skid, which was installed and shut down whilst camp and facilities were operational during construction.
  • 2x Reverse osmosis plants
  • Spray fields
  • Fire pump station and Booster engines
  • Storage tanks
  • Temporary ablution blocks
  • All mains fire, raw water, potable water, rising mains,.
  • 3x pump stations
  • All drainage systems from mains to donga hook ups
  • Roster 3 and 1 FIFO

Plumber / Drainer / Polywelder / pipefitter

Tri Star Water Solutions / Decmil
04.2013 - 06.2013
  • Installation of Wheatstones MBR waste water treatment plant and spray field manifold
  • Storage tanks
  • pump systems
  • valve manifold for various spray fields 300 schedule 80 piping
  • Polywelding
  • process plant
  • testing and activation / commissioning of plant
  • Pressure testing
  • All of which went through Bechtels strict safety and lockout procedures
  • Roster 3 and 1 FIFO

Plumber / Drainer / Gasfitter / Polywelder

Delta (Compass Group) Wheatstone Pioneer, Fly and construction village camps
02.2013 - 04.2013
  • Maintaining commercial Kitchen, appliances, laundries, 1200+ demandables, pump stations and gas bullets.
  • Conducting water purity tests
  • Conversing with management, deliveries and fellow staff member from different departments.
  • Interpreted plans to determine locations, quantities and sizes of materials required.
  • Conversing with waste water treatment operations
  • FIFO role 4 and 1

Plumber / Drainer / Gasfitter / Polywelder

Atomic Plumbing Services
07.2012 - 02.2013
  • All aspects of plumbing from new installations, commercial, housing, sub divisions, semi high rise, schools, factories, shop outlets.Also including maintenance domestic / commercial.
  • All of which include:
  • Mains services of water, fire / H-Patterns / Deisel booster engines, gas, sewer, manhole construction, storm water, rough inns, fit off and poly welding.
  • Conversed with project managers, other trades, cranes, concrete pump trucks, machinery...
  • All installations tested and inspected to AS3500 and local standards.

Plumber / Drainer / Gasfitter / Polywelder

Precision Plumbing
02.2012 - 08.2012
  • Completed Mulla Mulla mining camp from start to finish. Including all attributes of plumbing in the construction of this 500man camp.
  • Installation of:
  • 3x Biomax tanks
  • 1x Reverse osmosis plant
  • Fire pump station, Deisel booster engine
  • Storage tanks
  • Temperary ablution blocks, crib and office areas
  • All mains fire, raw water, potable water, rising mains.
  • Pump station
  • All drainage mains from mains to donga hook ups and commissioning.
  • Interpreted plans to determine locations, quantities and sizes of materials required.
  • All plumbing was installed and tested to meet AS3500 and local standards.
  • Roster 3 and 1 FIFO

Plumber / Drainer / Gasfitter / Poly welder

Theiss Pty Ltd
07.2010 - 02.2012
  • Civil drainage and manhole construction
  • All mains services fire, water, gas, rising mains, raw water.
  • Detention tanks / 2.5m concrete
  • Sewer pump stations
  • Storage tanks
  • Commercial kitchens
  • 2 storey dongas / 44rooms per wing
  • All hookups from mains to new buildings
  • Lived in sharedaccommodation for the first 8mths
  • 28 and 9 roster FIFO
  • Interpreted plans to determine locations, quantities and sizes of materials required.

Plumber / Drainer / Gasfitter / Poly welder

Knowles Plumbing
02.2010 - 06.2010
  • Government school stimulus package. Installing new school blocks from Art, Science, auditorium and common buildings.
  • All mains were installed water, gas, drainage and storm water as a 2man team.
  • Excavations, manhole erection, rough inns, fit off to hand over stage.
  • Interpreted plans to determine locations, quantities and sizes of materials required.
  • All services were tested and inspected to AS3500 and local standards

Plumber / Pipefitter / Operator

Beach Building and Civil Group
10.2009 - 02.2010
  • Pipe laying 450mm pipe and construction 30+ concrete manholes, setting and benching all.
  • 1x Pump station installation
  • Operation of Water Cart and vibe rollers
  • Conversing with project managers, site forman, concrete pump trucks, machinery, material take offs.
  • Interpreted plans to determine locations, quantities and sizes of materials required.
  • All tested to AS3500 and local standards
  • Worked in extreme North QLD weather conditions

Leading Hand Plumber / Drainer / Gasfitter / Polywelder

GTS Plumbing
01.2009 - 10.2009
  • Project involved 56 luxury units and 20 retail outlets
  • All aspects of commercial plumbing:
  • Elevated pipework, stack systems, deck layouts, fire mains, gas mains, mains sewer, manhole construction, fire pump skids and storm water.
  • Interpreted plans to determine locations, quantities and sizes of materials required.
  • Conveyed with all Project managers, site forman and attended various meeting discussing scope of works.
  • All installation were tested and inspected to meet AS3500 and local standards.
  • Dealt with all kinds of environmental impacts, wet seasons and extreme humidity.

Leading Hand Plumber / Drainer / Gas fitter / Poly welder

MSC Plumbing
03.2006 - 02.2009
  • Peppers Coral Sea Resort and Day Spa / Blue Horizons.
  • 160 luxury units, penthouses, amenities, commercial kitchens, day spas, restaurant and reception facilities.
  • All mains services, sewer, water, fire, gas, storm water, manhole construction.
  • Deck layouts for service penetrations.
  • Conversed with all types of management from the builder, project manager down to fellow workers.
  • Responsible for allocating tasks, interpreted plans to determine locations, quantities and sizes of materials required.
  • Installed fire pump skids, H-patterns, Deisel booster engines, passed through fire department.
  • All installations met AS3500 and local council standards.
  • This job was constructed in elements such as wet season, land slides and constructed on the side of a mountain.

Education

Certificate III in Plumbing / Drainage / Gasfitting and construction - Plumbing / Drainage / Gasfitting

Yeronga Institute of Tafe
Brisbane, QLD.
2001

Skills

  • PLUMBERS AND DRAINERS LICENCES (CONTRACTORS)
  • WA PL7789
  • QLD 20881
  • NT LPD2139
  • POLY WELDING STAMP NO
  • XLT00453
  • WORKING AT HEIGHTS
  • R11OHS204A
  • WHITE CARD
  • 36109041
  • NATIONAL POLICE CLEARANCE
  • 259974
  • COMPETANT EXPERIENCED IN
  • CONFINED SPACE
  • EWP
  • SCAFFOLDING
  • WORK IN ACCORDANCE WITH AN ISSUED PERMIT
  • 1097 / 4023
  • HIGH RISK WORK
  • WL3365741
  • CERTIFICATE IV CONSTRUCTION SERVICES (PLUMBING, DRAINAGE, GASFITTING) INSTALLATION AND SEVICES QUALIFICATION
  • 12265QLD
  • ROY HILL INDUCTED
  • BNE20140322TE
  • BECHTEL INDUCTED
  • CHEVERON INDUCTED
  • BHP INDUCTED
  • ATLAS IRON INDUCTED
  • DRIVERS LICENCE NO62492712

References

Michael White
Bechtel / Monadelphous / Tri Star / MSC
0423549662



Mark Sheehan

Precision Services Group

0427 777 191


 




Timeline

Plumber

Virtue Plumbing
11.2023 - 02.2024

Plumber Supervisor

Blue Mojo
02.2022 - 11.2023

Plumber Supervisor

Aquatech Coastal Plumbing
10.2020 - 02.2022

Plumber Supervisor / Project Manager

Precision Services
01.2020 - 10.2020

Plumber Supervisor

Aquatech Coastal Plumbing
07.2019 - 01.2020

Plumber Supervisor

Precision Plumbing
11.2018 - 07.2019

Plumber Supervisor

Precision Plumbing
08.2017 - 11.2018

Plumber

Connect / Broadspectrum
01.2016 - 08.2017

Plumber Forman

Reid Plumbing
05.2015 - 07.2016

Plumber

Protek Plumbing
03.2015 - 05.2015

Plumber / mechanical / Polywelder

Decmil Australia
09.2014 - 03.2015

Plumber /Drainer / Gasfitter / Polywelder

ISS
01.2014 - 2015

Plumber / Drainer / Gasfitter / Polywelder

Atomic Plumbing Services
12.2013 - 04.2014

Plumber / Drainer / Gasfitter / Polywelder

Precision Plumbing for Atlas Iron / Decmil
07.2013 - 12.2013

Plumber / Drainer / Polywelder / pipefitter

Tri Star Water Solutions / Decmil
04.2013 - 06.2013

Plumber / Drainer / Gasfitter / Polywelder

Delta (Compass Group) Wheatstone Pioneer, Fly and construction village camps
02.2013 - 04.2013

Plumber / Drainer / Gasfitter / Polywelder

Atomic Plumbing Services
07.2012 - 02.2013

Plumber / Drainer / Gasfitter / Polywelder

Precision Plumbing
02.2012 - 08.2012

Plumber / Drainer / Gasfitter / Poly welder

Theiss Pty Ltd
07.2010 - 02.2012

Plumber / Drainer / Gasfitter / Poly welder

Knowles Plumbing
02.2010 - 06.2010

Plumber / Pipefitter / Operator

Beach Building and Civil Group
10.2009 - 02.2010

Leading Hand Plumber / Drainer / Gasfitter / Polywelder

GTS Plumbing
01.2009 - 10.2009

Leading Hand Plumber / Drainer / Gas fitter / Poly welder

MSC Plumbing
03.2006 - 02.2009

Certificate III in Plumbing / Drainage / Gasfitting and construction - Plumbing / Drainage / Gasfitting

Yeronga Institute of Tafe
Thomas Elliott