Summary
Overview
Work History
Education
Skills
Certification
References
Timeline
Generic

Thomas Parker

Flagstone,Australia

Summary

Accomplished Piping Supervisor with a proven track record at Bechtel, enhancing operational efficiency and safety compliance across high-stakes projects. Expert in pre-construction planning and job site management, I excel in fostering stakeholder relationships and mentoring teams. My leadership has consistently delivered projects on time, with a keen focus on quality control and risk management.

Overview

18
18
years of professional experience
1
1
Certification

Work History

Piping Supervisor

Bechtel
Karratha, Western Australia
05.2023 - Current

As a supervisor on the Pluto Train 2 construction project, my current roles consist of:

  • Coordinating electrical, mechanical, and civil scopes for OSBL and BOG compressor areas, with direct supervision of BMW, SCW, and pipe fitters.
  • Managing a crew of 45 craft professionals directly, and an additional 40-50 indirectly, ensuring operational efficiency and compliance with safety standards.
  • Reviewing project documents to understand and execute the full project scope, coordinating works in operational areas that require permits, scheduling, and execution.
  • Leading the procurement of site materials, equipment, and labour for the piping and mechanical packages, ensuring seamless operation across multiple disciplines (piping, mechanical, electrical, instrumentation, scaffolding, cranes/rigging, PIF).
  • Coordinating and delegating work across multiple job fronts in the BOG compressor area, ensuring alignment with the overall work schedule in collaboration with planners.
  • Acting as the senior focal point for the area, ensuring coordination and compliance with project requirements, leading safety walkdowns, workshops, and risk reviews.
  • Managing plant shutdowns for future tie-ins, equipment replacement, and upgrades under Woodside’s hazardous area permit system.
  • Leading pre-start and debrief meetings, daily toolbox talks, and reviewing ITPs, ITRs, and QA documentation to ensure readiness for commissioning and client handover.
  • Promoting Zero Harm philosophy by mentoring crew members in JHA development, safe work practices, and identifying training needs to meet project requirements.
  • Building and maintaining relationships with stakeholders, ensuring project goals for environmental, safety & health, quality, cost, constructability, and schedule are met.
  • Managing the submission of TQs and NCR reports for non-compliant equipment and materials.

Leading Hand - Pipe Fitter

Iron Bridge Magnetite Project
Marble Bar, Western Australia
09.2022 - 03.2023

Roles and responsibilities included:

  • Coordinating activities with other leading hands, supervisors, superintendents, and site engineers, ensuring seamless communication and effective task execution.
  • Interpreting isometric drawings and P&IDs to guide the installation, bolting, and hand torquing of carbon and rubber-lined pipe spools, valves, and spec blinds.
  • Managing the installation of carbon steel pipe ranging from 1/4” to 40” in diameter using the GTAW process, including modifications and fitting of pipe spools as required.
  • Directing structural modifications to supports and managing the scheduling and organization of flange, gasket, and stud inspections, ensuring quality control and adherence to timelines.
  • Supervising the fabrication of site-run threaded pipe and overseeing quality and compliance with technical specifications.
  • Fostering strong relationships with stakeholders, ensuring effective collaboration across teams and maintaining alignment with project goals.
  • Leading the completion of all safety KPIs, Pre-starts, and Toolbox presentations, prioritizing safety and well-being while meeting and exceeding client standards.
  • Coordinating the allocation of labour resources to optimize productivity, tracking project hours against forecast earnings, and ensuring timely project completion.
  • Mentoring and developing crew members, ensuring competencies are effectively utilized and fostering an environment focused on maximum productivity.
  • Managing both quality and OH&S compliance, ensuring the team adheres to and exceeds client standards.

Managing Director

TP Fabworks Pty Ltd
Brisbane, Queensland
03.2021 - 09.2022
  • Oversaw the fabrication of 6-cylinder and 4-cylinder merge collectors, ensuring quality standards were met throughout the process.
  • Managed the TIG welding of merge collectors, both internally and externally, ensuring precision and durability.
  • Directed the porting process and ensured all custom car fabrication projects, such as intercooler piping, intake pipes, custom brackets, exhaust systems, 4-link rear-end suspension, body modifications, and transmission cooler setups, were completed to high specifications.
  • Led the general fabrication and welding operations, utilizing both TIG and MIG processes to deliver high-quality products.
  • Implemented and maintained high standards of housekeeping across all work areas to ensure safety, cleanliness, and operational efficiency.
  • Supervised and mentored the fabrication team, fostering a collaborative environment focused on meeting deadlines and exceeding project goals.
  • Coordinated the day-to-day operations and streamlined workflows to maximize productivity and ensure client satisfaction.

TIG Welder

6boost
Toowoomba, Queensland
03.2019 - 02.2021
  • Performed precision tack welding and disassembly of exhaust manifold runners, ensuring accurate alignment and fitment for optimal performance.
  • Executed TIG welding on manifold runners and components, ensuring high-quality, durable welds that meet stringent industry standards.
  • Led the reassembly and final TIG welding of exhaust manifolds, ensuring seamless integration and structural integrity.
  • Welded chromoly roll cages for drag cars, maintaining compliance with safety and strength standards.
  • Maintained a high standard of cleanliness and organization in the workspace, ensuring compliance with safety regulations and enhancing operational efficiency.

Pipe Fitter

NACAP
Central Queensland
06.2018 - 12.2018
  • Worked closely with leading hands, supervisors, superintendents, and site engineers to ensure smooth project coordination and execution.
  • Interpreted isometric drawings and P&IDs to accurately fit and install carbon and stainless-steel pipes (3/4” to 60” in diameter) using GTAW.
  • Modified, fitted, and bolted pipe spools, ball valves, and pressure relief devices (PRVs, PSVs) as required, ensuring proper system function.
  • Installed flange insulation kits and performed hand and hytorque on joints to ensure secure, leak-free connections.
  • Organized flange, gasket, and stud inspections to maintain project quality standards.
  • Conducted structural modifications to supports, including cable tray and uni-strut adjustments, as necessary.
  • Installed anti-vibration clamps, drilled cores, and installed pipe supports to ensure system stability.
  • Performed grouting as required for added structural support.

Pipe Fitter

Monadelphous
Darwin, Northern Territory
06.2017 - 12.2017

Company Overview: Ichthys LNG Project, Darwin, Northern Territory

  • Worked on the $34 billion AUD Ichthys LNG project, one of the most complex LNG projects globally, in high-risk areas such as the annular space, suspended deck, and atop Butane and Propane tanks.
  • Interpreted isometric drawings and fitted carbon and stainless-steel pipes (3/4” to 60” in diameter) using GTAW welding techniques.
  • Bolted up and torqued pipe spools, ball valves, PRVs, and PSVs, ensuring leak-free, compliant installations.
  • Applied flange management practices and organized inspections for flanges, gaskets, and studs to meet project requirements.
  • Collaborated with supervisors, engineers, and other key stakeholders to ensure alignment with project milestones and safety standards.

Leading Hand – Pipe Fitter

Bechtel
Onslow, Western Australia
03.2017 - 06.2017

Company Overview: Wheatstone Project, Onslow, Western Australia

  • Working in the ISBL Area on the Wheatstone Project, collaborating with supervisors and leading hands, and providing coverage for supervision during A/L and R&R periods.
  • Interpreted isometric drawings and fitted carbon and stainless-steel pipes (3/4” to 60” in diameter) using GTAW welding techniques.
  • Set up pipe spools at correct elevations and orientations using a dumpy level, ensuring accuracy in measurements.
  • Modified and bolted up pipe spools, ball valves, bleed rings, PRVs, and PSVs, adhering to quality and OH&S compliance standards.
  • Hydratight trained and experienced in applying stringent quality and safety protocols.
  • Organized flange, gasket, and stud inspections and ensured adherence to LOTO and permit-to-work procedures.

Leading Hand – Pipe Fitter

CB&I
Onslow, Western Australia
01.2016 - 03.2017

Certainly! Here’s a more refined and concise version of the role description:

Company Overview: Project: OSBL Wheatstone Project, Onslow, Western Australia
As a Leading Hand with CB&I on the Wheatstone Project, I was responsible for coordinating the installation and construction of key infrastructure, in the OSBL area, as part of the EPC scope. My duties included:

  • Leading the team in the installation of carbon and stainless-steel pipe spools (3/4” to 60”), ensuring adherence to piping standards and project specifications.
  • Interpreting isometric drawings and overseeing the fitting, bolting, and torquing of pipe spools, valves, and associated components.
  • Filling supervisory gaps during A/L and R&R periods, ensuring work continued smoothly and without delays.
  • Ensuring all work complied with safety, quality, and regulatory standards, coordinating inspections, and implementing necessary modifications to supports and pipework.
  • Identifying and addressing operational challenges, proactively resolving issues to maintain project efficiency and meet deadlines.

Foreman - Boilermaker/Pipe Fitter

PPW Steel Fabrication & Welding
Brisbane, Queensland
06.2013 - 01.2016
  • Company Overview: Stayplton, Brisbane
  • Supervision of all fabrication and welding of structural steel, pipework, stainless steel and aluminium
  • Co-ordinate a workshop of 30 staff members to achieve maximum efficiency and productivity
  • Being proactive in finding solutions to problems that are brought to my attention
  • Liaise with management, engineers, draftsmen, TMR inspectors and clients
  • Check all jobs for quality control and assurance
  • Ensure lead times are met
  • Be a role model demonstrating appropriate work behaviours and attitudes
  • Identify training needs for staff members to maximise productivity in a safe work environment
  • Interpret technical drawings, CAD and isometric
  • Fabricate and weld pipe and structural steel when required using GTAW, GMAW and MMAW processes
  • Fitting carbon and stainless-steel pipe ranging from 3/4” to 60” in diameter using GTAW, GMAW and MMAW processes
  • Lathe work
  • Allocation of labor requirements to ensure optimum productivity, track hours burnt against forecast earnings and completion
  • Ensure both quality and OH&S compliance to the client’s standards or above
  • Mentoring crews in JHA development and safe work practices and actively promoting Zero harm philosophy
  • Running multi discipline crews consisting of machinists, mechanical fitters, boilermakers and welders
  • Stayplton, Brisbane

Boilermaker/Pipe Fitter

Saipem
Curtis Island, Queensland
01.2013 - 06.2013
  • Company Overview: GLNG (FIFO), Curtis Island, Queensland
  • Fitting carbon and stainless-steel pipe ranging from 3/4” to 60” in diameter using GTAW process
  • Structural steel fabrication and welding
  • Interpret technical drawings, CAD and ISO
  • Handrail Fabrication and installation
  • Structural modifications
  • Fabrication and welding of cable trays and covers
  • Maintenance

Boilermaker/Pipe Fitter

Forge Group
Tom Price, Western Australia
01.2012 - 01.2013
  • Company Overview: FIFO, Tom Price, Western Australia
  • Fitting carbon and stainless-steel pipe ranging from 3/4” to 60” in diameter using GTAW process
  • Fabricating and welding pipe brackets
  • Structural steel fabrication, welding and modifications as required
  • Interpret technical drawings, CAD and isometric
  • Handrail fabrication and welding
  • Fabrication and welding of cable trays and covers
  • Maintenance
  • FIFO, Tom Price, Western Australia

Boilermaker/Pipe Fitter

PPW Steel Fabrication & Welding
Brisbane, Queensland
01.2007 - 01.2012
  • Company Overview: Stapylton, Brisbane
  • Fitting carbon and stainless-steel pipe ranging from 3/4" to 60” in diameter
  • Structural steel fabrication and welding
  • Checking fabrication and welding for quality assurance
  • Interpret technical drawings, CAD and ISO
  • GMAW, GTAW, MMAW, FCAW, air arc gouging, oxy cutting
  • Plate cropping
  • Lathe work
  • In house MPI and LPI
  • Civil fabrication and welding (Gateway bridge, Safelink Alliance, Eastern Bus way, D2G, Legacy Way)
  • Welding together two Tunnel Boring Machines at Legacy Way (Toowong to Kelvin Grove tunnels)
  • Stapylton, Brisbane

Boilermaker/Pipe Fitter

Star Steel Construction
Rocklea, Brisbane
01.2012
  • Company Overview: Rocklea, Brisbane
  • Fitting carbon and stainless-steel pipe ranging from 3/4” to 60” in diameter using GTAW process
  • Structural steel fabrication and welding
  • Interpret technical drawings, CAD and isometric
  • GMAW, MMAW, FCAW, oxy cutting
  • Plate cropping
  • Operating an ART plasma bed
  • Checking workshop fabrication and quality assurance
  • Liaising with the general manager and clients
  • Rocklea, Brisbane

Education

Completed year 11 -

Salisbury East High School
Salisbury, Adelaide
01.2001

Skills

  • Pre-construction planning
  • Job site management
  • Quality control
  • Risk management
  • Material procurement
  • Verbal and written communication
  • Inventory management
  • Problem-solving aptitude
  • Task prioritization
  • Project management
  • Construction safety
  • Assignment delegation
  • Hiring and onboarding

Certification

  • Cert III Boilermaker Trade Qualification
  • Cert IV Competitive Manufacturing
  • Blue card
  • Working at heights
  • Confined space
  • Atmospheric Testing
  • High risk work licence: LF, EWP
  • Hydratight trained
  • FMG inducted

References

  • Rob Steepe, Piping Superintendent, Bechtel, 0418 332 230
  • Jett Bacalla, Lead Piping Field Engineer, Bechtel, 0438 879 138
  • David Taylor, Piping Supervisor, SIMPEC, 0438 805 541
  • Kyle Hopf, Managing Director, 6boost, 0488 680 057
  • Brad House, Piping Supervisor, Monadelphous, 0438 905 717
  • Michael Biddle, Piping Supervisor, Bechtel, 0402 014 582
  • Russell Taylor, Piping Supervisor, CB&I, 0419 428 764
  • Riste Jonceski, Piping Supervisor, CB&I, 0411 104 075
  • Sam Fronte, Piping Superintendent, CB&I, 0417 022 195
  • Paul Pryor, Workshop Manager/Director, PPW Steel Fabrication & Welding, 0418 739 808
  • Phil Gragam, Site Manager/Director, PPW Steel Fabrication & Welding, 0417 770 851

Timeline

Piping Supervisor

Bechtel
05.2023 - Current

Leading Hand - Pipe Fitter

Iron Bridge Magnetite Project
09.2022 - 03.2023

Managing Director

TP Fabworks Pty Ltd
03.2021 - 09.2022

TIG Welder

6boost
03.2019 - 02.2021

Pipe Fitter

NACAP
06.2018 - 12.2018

Pipe Fitter

Monadelphous
06.2017 - 12.2017

Leading Hand – Pipe Fitter

Bechtel
03.2017 - 06.2017

Leading Hand – Pipe Fitter

CB&I
01.2016 - 03.2017

Foreman - Boilermaker/Pipe Fitter

PPW Steel Fabrication & Welding
06.2013 - 01.2016

Boilermaker/Pipe Fitter

Saipem
01.2013 - 06.2013

Boilermaker/Pipe Fitter

Forge Group
01.2012 - 01.2013

Boilermaker/Pipe Fitter

Star Steel Construction
01.2012

Boilermaker/Pipe Fitter

PPW Steel Fabrication & Welding
01.2007 - 01.2012

Completed year 11 -

Salisbury East High School
Thomas Parker