Summary
Overview
Work History
Education
Skills
Personal Information
References
License
Personal Qualities
Timeline
Generic

Travis Ballagh

Clifton Springs,Australia

Summary

Hardworking operator skilled in quality control and machine and equipment troubleshooting paired with outstanding time management and multitasking abilities. Quick learner offering several years of experience operating machines of various magnitudes. Focused on reducing costs and increasing productivity.

Overview

25
25
years of professional experience

Work History

Aquatech Civil
07.2018 - Current
  • 12m/14m/16H Grader Trimble GPS/UTS and Earthworks, Loaders, 3t-23t Excavators, Bobcats, Water Carts, Trucks (tipper) and Floats
  • Many various jobs across Geelong and the Surf Coast
  • Start to finish on Subdivisions
  • Final trim for seal on subdivisions and road jobs on the grader
  • Trenching, draining and loading materials on the excavators
  • General bobcat work loading trucks and cleaning up sites
  • Re-sheet program for Surf Coast Shire- Grade the new materials into a road suitable traffic
  • Truck Driving (tippers) and Float Machines around with both a small and larger trailers

Site Manager

Lantrak
01.2014 - 03.2018
  • Company Overview: (Clean fill site)
  • Geelong Cemetery Truss Burviles rd project
  • D6-D10 Bull Dozer, 12m Grader Trimble GPS/UTS and 15t-25t Excavators
  • Day to day running of site, checking tucks in, checking material in tucks and processing payments
  • Bulk Earthworks and Landscaping to a plan for future cemetery
  • (Clean fill site)

McMahon’s John Holland
01.2013 - 01.2014
  • Company Overview: Great Northern Road Expansion Project
  • Grader (14h/m-140h/m) subgrade, capping, drains, clean up and general rehab (Trimble GPS)
  • Loaders (972-980-988) loading road trains, picking up windrows and general loader work (Load Rite weighing system)
  • Excavator (365-385- pc 300 Volvo 30t) loading moxy tipper trucks
  • Dozer (d10- d9- d7) pushing up stockpiles, top-soil stripping
  • Great Northern Road Expansion Project

McMahon’s
01.2012 - 12.2012
  • Company Overview: Hope Downs Rail Expansion Project
  • Grader (14h/m-140h/m) subgrade, capping, drains, clean up and general rehab (Trimble GPS)
  • Loaders (972-980-988) loading road trains, picking up windrows and general loader work (Load Rite weighing system)
  • Excavator (365-385- pc 300 Volvo 30t) loading moxys tipper trucks
  • Dozer (d10- d9- d7) pushing up stockpiles, top-soil stripping
  • Hope Downs Rail Expansion Project

McMahon’s
01.2011 - 12.2012
  • Company Overview: Karara Rail Project
  • Grader (14h/m-140h/m) subgrade, capping, drains, clean up and general rehab (Trimble GPS)
  • Loaders (972-980-988) loading road trains, picking up windrows and general loader work
  • Excavator (365-385- pc 300 Volvo 30t) loading moxys tipper trucks
  • Dozer (d10- d9- d7) pushing up stockpiles, topsoil stripping
  • Karara Rail Project

McMahon’s
01.2010 - 12.2010
  • Company Overview: Leighton’s Joint Venture RGP5
  • Grader (16H and 140H, 14H): Top soil striping, ground prep, mixing, drains, haul roads, shoulder’s, stacking, layout, balance, Final clean up and can trim to +- 5 to 10 mm
  • Leighton’s Joint Venture RGP5

Southern Road Services
07.2009 - 12.2009
  • 120H Grader, Shoulder up-grades, widening’s, mixing, trimming - 5 to 10mm and general mutinous
  • 950G Loader, loading road-trains and general clean up
  • Excavator’s, for cutting drains and loading road-trains

Cape Crushing
09.2008 - 07.2009
  • Company Overview: (LNO)
  • Articulated Dump Trucks, Water Carts, Excavators (up to Volvo 45t), Loaders (up to WA 600), Rollers, Grader (up to 16H), Bull Dozer (up to D10)
  • Building dams and other general duties around the mine site
  • (LNO)

McMahon’s
01.2006 - 05.2008
  • Company Overview: Eye Hwy Project
  • Started off stringing, then got trained on rollers, loaders and the grader
  • Rollers (drum, pad foot and multi): Compaction, rock breaking, and final finish before sealing
  • Loader (966G, IT38G and 972G): Loading road trains, picking up windrows and clearing
  • Grader (14G, 16G and 140H, 140G): Top soil striping, ground prep, mixing, drains, haul roads, shoulder’s, stacking, layout, balance, some face up, A-drains and final clean up and can trim to +- 5 to 10 mm
  • Eye Hwy Project

Ertech
01.2005 - 12.2005
  • Did a few laboring jobs, dam’s, subdivisions, Gloster park (rally track) and a small rail job in Port Headland

Timbertruss
01.2002 - 12.2005
  • First started assembling trusses, which meant reading planes then assembling the pre cut timber
  • After a while got moved to the saws, which meant cutting all the timber to size and at the right angles for the assemblers

Wombat Corner Children’s Camp/ Emerald Back Packer’s
01.2000 - 01.2002
  • Organize and run programs for schools and a school holiday’s
  • General cleaning, some food preparation and cooking
  • Also managed the Back Packers in the quieter months, which meant clean, collecting money, and just day-to-day running

Education

Certificate IV -

Training and Assessing
02.2014

year 11 -

Bellarine secondary collage
01.1999

Skills

  • Tool operation
  • Heavy equipment operation
  • Operational documentation
  • Equipment operation
  • Efficient multitasking
  • Teamwork and collaboration

Personal Information

Date of Birth: 10/10/81

References

Michael Wasylkewycz, John Holland’s, 0417 436 127

License

HC, 06/22/28

Personal Qualities

  • Willing to learn
  • Quick learner
  • Good communicator
  • Loyal worker
  • Reliable
  • Honest

Timeline

Aquatech Civil
07.2018 - Current

Site Manager

Lantrak
01.2014 - 03.2018

McMahon’s John Holland
01.2013 - 01.2014

McMahon’s
01.2012 - 12.2012

McMahon’s
01.2011 - 12.2012

McMahon’s
01.2010 - 12.2010

Southern Road Services
07.2009 - 12.2009

Cape Crushing
09.2008 - 07.2009

McMahon’s
01.2006 - 05.2008

Ertech
01.2005 - 12.2005

Timbertruss
01.2002 - 12.2005

Wombat Corner Children’s Camp/ Emerald Back Packer’s
01.2000 - 01.2002

Certificate IV -

Training and Assessing

year 11 -

Bellarine secondary collage
Travis Ballagh