As a Senior Facade Designer with extensive experience in designing innovative and sustainable facades for high-rise buildings and airports, I am committed to delivering aesthetically striking, functional, and environmentally responsible solutions. My expertise lies in managing complex projects from concept to execution, ensuring optimal integration of cutting-edge materials, advanced engineering principles, and energy-efficient systems. I aim to lead and mentor design teams in creating iconic, high-performance facades that meet the unique challenges of large-scale commercial and public infrastructure projects, enhancing both form and function in dynamic urban environments.
Overview
22
22
years of professional experience
Work History
Senior Façade Designer
Lindner Prater - Façades
Dubai, United Arab Emirates
07.2019 - 11.2024
Preparation of the Concept Design, System Design and Shop Drawings of the façade
To ensure shop drawings are done in accordance with Issued for Construction Drawing of Architectural Drawing and Structural Drawing specifications and conditions
Preparation of material bulk order for all elements required such as glass panels, aluminum dies (profiles), aluminum and steel sheets, accessories and fixings
(Material Take-Off, Material Allocation and Material Optimization)
Preparation of production drawing of Brackets, Unitized Panels, Sticked Panels, Aluminum Sheet, Aluminum Composite Panel and Composite Ceramic Cladding and other relative fixings and supports together with the material production of Assembly List, Optimization List, Component List and Cutting List
3D modeling of the whole facade space structures using 3D wireframe and its methodology, Concept Design, System Design, Shop Drawing, Fabrication Drawing, Installation Drawings & Coordinates System
Checking of all production work order and ensure that it is in accordance with approved drawings, material site measurements, factory capacity, logistics for the delivery of materials and easy site installations
Ensure design shown in shop drawings and fabrication work order is achievable in regards of using standard available horizontal and vertical section details, easy to fabricate, assembled and installed by way of coordination with production team and installation teams
Prepared and maintained updated shop drawing register and fabrication work order
Prepared a Die Drawings, Components List and Sample Board for every project
Coordinate with Technical Manager / Design Manager Structural Engineers or System Development Manager on system calculation
Coordinate with Project Managers and Construction Manager for interface details on site conditions and all design information is available
Attend site coordination meetings and queries during installation and record any changes from design during installation to include in As-Built Drawings
To answer all Non-Conformity Report and make sure that corrective and preventive action are taken
Maintain proper documentation as per the requirement of the Quality Management System and to perform other related duties that may be assigned from time to time by the Technical Manager to accomplish the objective of the company
Senior Façade Designer
Al Ghurair Construction – Aluminum Division LLC
Dubai, United Arab Emirates
11.2015 - 06.2019
Preparation of the Concept Design, System Design and Shop Drawings of the façade
To ensure shop drawings are done in accordance with the Issue for Construction Drawing of Architectural Drawing and Structural Drawing specifications and conditions
Preparation of material bulk order for all elements required such as glass panels, aluminum dies (profiles), aluminum and steel sheets, accessories and fixings
(Material Take-Off, Material Allocation and Material Optimization)
Preparation of production drawing of Brackets, Unitized Panels, Sticked Panels, Aluminum Sheet, Aluminum Composite Panel and Composite Ceramic Cladding and other relative fixings and supports together with the material production of Assembly List, Optimization List, Component List and Cutting List
3D modeling of the whole facade space structures using 3D wireframe and its methodology, Concept Design, System Design, Shop Drawing, Fabrication Drawing, Installation Drawings & Coordinates System
Coordinate with Technical Manager / Design Manager / Structural Engineers or System Development Manager on system calculation
Coordinate with Project Managers and Construction Manager for interface details on site conditions and all design information is available
Attend site coordination meetings and queries during installation and record any changes from design during installation to include in As-Built Drawings
To answer all Non-Conformity Report and make sure that corrective and preventive action are taken
To report to Technical Manager and Project Manager for any variations either positive or negative that occur during design stage and to Perform other related duties that may be assigned from time to time by Technical Manager for accomplishing the objective of the company
Senior Façade Designer
Profils Systemes - Gulf FZCO
Dubai, United Arab Emirates
04.2013 - 11.2015
Company Overview: Curtain Wall System Supplier & Consultancy
Preparation of the Concept Design, System Design and Shop Drawings of the façade
To ensure shop drawings are done in accordance with the Issue for Construction Drawing of Architectural Drawing and Structural Drawing specifications and conditions
Preparation of material bulk order for all elements required such as glass panels, aluminum dies (profiles), aluminum and steel sheets, accessories and fixings
(Material Take-Off, Material Allocation and Material Optimization)
Preparation of production drawing of Brackets, Unitized Panels, Sticked Panels, Aluminum Sheet, Aluminum Composite Panel and Composite Ceramic Cladding and other relative fixings and supports together with the material production of Assembly List, Optimization List, Component List and Cutting List
3D modeling of the whole facade space structures using 3D wireframe and its methodology, Concept Design, System Design, Shop Drawing, Fabrication Drawing, Installation Drawings & Coordinates System
Checking of all production work order and ensure that it is in accordance with approved drawings, material site measurements, factory capacity, logistics for the delivery of materials and easy site installations
Ensure design shown in shop drawings and fabrication work order is achievable in regards of using standard available horizontal and vertical section details, easy to fabricate, assembled and installed by way of coordination with production team and installation teams
Prepare and maintain updated shop drawing register and fabrication work order
Prepare Die drawings, Sample Board and Components List for every project
Coordinate with Technical Manager / Design Manager Structural Engineers or System Development Manager on system calculation
Coordinate with Project Managers and Construction Manager for interface details on site conditions and all design information is available
Attend site coordination meetings and queries during installation and record any changes from design during installation to include in As-Built Drawings
To answer all Non-Conformity Report and make sure that corrective and preventive action are taken
Maintain proper documentation as per requirement of Quality Management System and to Perform other related duties that may be assigned from time to time by Technical Manager for accomplishing the objective of the company
Curtain Wall System Supplier & Consultancy
Façade Designer
Swiss Middle East
Dubai, United Arab Emirates
04.2007 - 03.2013
Company Overview: Curtain Wall & Architectural Cladding
Preparation of the Concept Design, System Design and Shop Drawings of the façade
To ensure shop drawings are done in accordance with the Issue for Construction Drawing of Architectural Drawing and Structural Drawing specifications and conditions
Preparation of production drawing of Brackets, Unitized Panels, Sticked Panels, Aluminum Sheet, Aluminum Composite Panel and Composite Ceramic Cladding and other relative fixings and supports together with the material production of assembly list, optimization list and cutting list
3D modeling of the whole facade space structures using 3D wireframe and its methodology, Concept Design, System Design, Shop Drawing, Fabrication Drawing, Installation Drawings and Coordinates System
Prepare Shop drawing and Fabrication Drawings of Performance Mock-up (PMU) and Visual Mock-up (VMU)
Curtain Wall & Architectural Cladding
Junior Architect
Office of the President – Republic of the Philippines
Philippines
05.2006 - 02.2007
Company Overview: National Housing Authority - Task Force North Rail Project
Monitor the quality and quantity of the work progress to ensure timely completion of the assigned project
Responsible for quantification and ordering of the owner’s supplied materials and ensure the quality is to be used by the contractors
Prepare base map showing status of relocation and stages of construction and prepare daily monitoring reports
Conduct orientation on guidelines of housing construction and coordinate with the developers and contractors for the progress of the site development as well as the housing constructions progress
Conduct community awareness and focuses on the assurances of efficient and effective implementation of basic system in a community as a whole
National Housing Authority - Task Force North Rail Project
Architectural Draftsman
Redstone and Design Execution
Cebu City, Philippines
06.2002 - 01.2005
Assisted in architectural drafting, architectural problem solving during conceptual design phase and planning
Assisted in arrangement and preparing contact documents and specification writings
Assisted in structural designing, drafting and allied engineering field
Assisted in preliminary cost estimate of the design project
Assisted in technical and working drawings based on given specification and structural calculation of concrete and steel structure
Assisted and incorporated standard measurement and building codes for construction