Overview
Work History
Skills
Short description about myself
Certification
Education
Timeline
Generic
VICTOR THOMPSON-HOKAI

VICTOR THOMPSON-HOKAI

Brisbane,Queensland

Overview

7
7
years of professional experience
1
1
Certification

Work History

Advanced Scaffolder

Unispan
05.2022 - Current
  • Ticketed Scaffolder • Uni-span
  • Kurri Kurri Snowy Project February 2024-May2024 (Construction)
  • Work with Surelock
  • Erect, modify and dismantle scaffold
  • Working at Heights
  • UGL inducted
  • Filling out STAR card before each job commences
  • Night shift
  • Working with other trades
  • Tarong Power Station, September 2023-November2023 (Shutdown)
  • Erect, modify and dismantle scaffold
  • Work with tube and fit/kwik stage/atpac
  • Filling out STAR card before each job commences
  • Working at Heights
  • Working in Confined Space
  • Arcadia Valley, ACS-03 July 2023-August 2023 (Construction)
  • Oil and gas mining
  • Santos inducted
  • Filling out STAR card before each job commences
  • GLNG expansion construction
  • Erect, modify and dismantled scaffold to suit all trades
  • Work with kwikstage and tube and fittings
  • Working at heights
  • Followed protocols and stayed organised to provide personal and teammate safety.
  • Work to a permit to work and isolation system
  • 18/10 roster
  • Downers hub 4 Injune April 2023 to May 2023 QLD
  • Oil and gas mining
  • 5 week shutdown
  • Working within pipe rack, in between beams.
  • Assembled, erected and dismantled scaffolding structures to meet project needs.
  • Santos inducted
  • Scoping jobs and giving the client the best possible working decks
  • Followed protocols and stayed organised to provide personal and teammate safety.
  • Working at heights
  • Tarong Power station April 2023 to May 2023 (Shutdown)
  • Erect, modify and dismantle scaffold
  • Work with At-pac, tube and fit
  • Work with power tools jigsaw and skill saw
  • Scope and erect scaffold
  • Milmerran Power station May 26/2023 to May 31/ 2023 (Shutdown)
  • Erect and dismantle furnace/boiler
  • Worked with modular
  • 12 hour shifts
  • Day and Night shift
  • Work in confine space
  • Work with permit systems sign in sign out
  • Work with power tools
  • Phosphate Hill Mine Site, QLD • May 2022 to July 2022. (Shutdown and live plant environments)
  • FIFO Roster
  • 12hour Shifts
  • Day/Night Shift Work
  • Work in confined space
  • Working at heights
  • Work with tube and fit, At-pac and Kwikstage scaffolding.
  • Erect, modify and dismantle scaffolding.
  • Work in team enviroment
  • Tumut Visy paper mill August 2022 to November 2022 (Shutdown)
  • Work with At-pac, Kwikstage, Tube and fit
  • Erect, modify and dismantle scaffold.
  • Scaffold in confined space
  • Spurred and Hung scaffold
  • Worked in pipe racks
  • Work with permit systems
  • Gas test
  • Long stint shut down 3 months DIDO

Intermediate Scaffolder

UGL Pty Limited
02.2023 - 05.2023
  • Kestrel Coal Recourse's Queensland March 2023 to April 2023 (Shutdown)
  • Assembled, erected and dismantled scaffolding structures to meet project needs.
  • Erect scaffold in train load out in confined space
  • Working at heights
  • Work to a permit to work system (lock on/lock off)
  • Worked in team-focused environment to collaboratively complete projects
  • 12 hour Night shifts
  • Work inside rail corridor
  • Work with At-pac and kwikstage
  • Hung and spurred scaffold.
  • Used variety of hand and power tools to complete tasks.

Intermediate Scaffolder

RB Scaffolding
10.2021 - 05.2022

RB Scaffolding Brisbane, QLD • October 2021 to May 2022

Intermediate Scaffolder

Scafflink Australia
06.2018 - 02.2021

Sub contracted labour to help on numerous residential and semi commercial storm restoration job sites across Queensland.

Which includes:

  • Gympie
  • Springfield lakes

Labourer/Intermediate Scaffolder

Northside Scaffolding
02.2017 - 10.2021

Joined crew as Scaffold Laborer small family owned sub
contractor, servicing Sunshine Coast and Brisbane in residential and semi-commercial/commercial
scaffolding.

Skills

  • Ability to work under pressure
  • Dependable/Independent Superior Work Ethic
  • Risk Assessment
  • Decision Making/Leadership/Critical Thinking
  • Maintain individual performance
  • Teamwork and Collaboration
  • Active Listening skills /Active Questioning
  • Attention to Detail/Perfectionist
  • Great communicator at all levels
  • Experience with , kwik stage,At Pac,
    Cup Lock, Tube and fit scaffolding
    Experience with hung
    Scaffolds,Cantilever scaffold,bird
    Cages,capsulation scaffold,ladder
    Beam scaffold,perimeter
    Scaffold,dance floor, plying
  • Experience with commercial and
    Residential, shutdown , maintenance
    ,long stint FIFO rosters

Short description about myself

Kiaora and thank you for considering my profile. I'm 30 years of age with 8 years of experience in scaffolding, I've honed my skills while working across Queensland and New South Wales. My journey started in 2016 and I've had the opportunity to work on a variety of projects including residential and commercial dwellings, commercial construction builds, maintenance, and shutdown works. I'm excited to bring my expertise to your team and contribute to your projects. 


 I believe that maintaining a positive attitude and energy is essential for both personal and team success. 

Certification

  • Open Drivers License
  • White Card- 1935841
  • Working at heights- RIIWHS204E
    • Enter and work in confine space- RIIWHS202E
  • Scaffold Advanced (SA)-0003380827
    • Scaffold Intermediate (SI)-0003380827
    • These competencies form part of RIISS00034 Surface Coal Mine Safety Skill Set
    • RIICOM201E Communicate in the workplace
    • RIIERR205D Apply initial response First Aid
    • RIIERR302E Respond to local emergencies and incidents
    • RIIGOV201E Comply with site work processes/procedures
    • RIIRIS201E Conduct local risk control
    • RIIWHS201E Work safely and follow WHS policies and procedures
    • MSMWHS217 Gas test atmospheres
  • TLIF0020 Safely access the rail corridor

Education

Mount Albert Grammar School

2007-2011

Timeline

Intermediate Scaffolder

UGL Pty Limited
02.2023 - 05.2023

Advanced Scaffolder

Unispan
05.2022 - Current

Intermediate Scaffolder

RB Scaffolding
10.2021 - 05.2022

Intermediate Scaffolder

Scafflink Australia
06.2018 - 02.2021

Labourer/Intermediate Scaffolder

Northside Scaffolding
02.2017 - 10.2021
VICTOR THOMPSON-HOKAI