Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic
Waqas Muhammad

Waqas Muhammad

Campbelltown,NSW

Summary

Water treatment professional with solid track record in plant operations, focusing on maintaining safety and regulatory compliance. Proven ability to enhance operational processes and ensure high-quality water production. Collaborative team player known for reliability and adaptability, skilled in system monitoring and troubleshooting.

Overview

12
12
years of professional experience
1
1
Certification

Work History

RECYCLED WATER TREATMENT PLANT OPERATOR (BINGARA GORGE 2571)

Veolia Water Technologies (Australia) Pty Ltd NSW
08.2023 - Current
  • Operating and monitoring water treatment processes to ensure compliance with safety and environmental regulations.
  • Conducting routine maintenance on filtration systems, optimizing performance and extending equipment lifespan.
  • Analyzing water quality data, identifying trends, and implementing corrective actions for continuous improvement.
  • Training junior operators on standard operating procedures and safety protocols, enhancing team effectiveness.
  • Developing and maintaining accurate records of operations, contributing to regulatory compliance and audits.
  • Maintaining accurate records of plant operations, including daily logs, maintenance reports, and regulatory documentation.

WATER TREATMENT PLANT SR. OPERATOR

Tabreed- National Central Cooling Co. Cooltech Water Treatment LLC
06.2022 - 06.2023
  • Monitored and controlled plant operations
  • Performed daily, weekly, and monthly reports and prepared work order permit as required
  • Performed minor corrective maintenance on plant equipment
  • Maintained inventory of supplies, chemicals, and other equipment
  • Troubleshooted water treatment problems
  • Supervised operators in plant troubleshooting and maintenance
  • Assisted outside contractors, supplyed necessary information, and inspected contractors' work
  • Maintained logs and other records

WATER AND SEWAGE TREATMENT PLANT OPERATOR

Metito Overseas LTD
10.2017 - 05.2022
  • Carried out routine operation of the plant’s machines and equipment
  • Performed scheduled preventive maintenance
  • Reported to the Plant Manager and Supervisor daily operation record of RO and saving files
  • Replaced RO and Ultrafiltration membrane modules
  • Checked water parameters (chlorine, PH, TDS, conductivity)
  • Received and proceeding with the transfer of chemical treatment products
  • Carried out the routine upkeep of materials, machines, and equipment

SCADA/PRODUCTION/STP PLANT OPERATOR

Al Jazeera Group – Sewage / Water Treatment Plant
09.2013 - 10.2016
  • Maintained Reverse Osmosis SCADA operation and control
  • Completed worksheet forms (RO Log Performance checklists and chemical inventory)
  • Performed machine troubleshooting when operational abnormalities occurred in the plant
  • Performed tasks assigned by the immediate supervisors such as chemical flushing of RO membranes, water sampling, probing/profiling of RO membranes, etc.
  • Responsible for regular backwashing of sand filters, replacement of chlorine gas cylinder, and refilling of chemicals used (antiscalant, acid, SMBS)

ATM MAINTENANCE OPERATOR

Bank Alfalah Pakistan Limited
06.2013 - 09.2013
  • Maintained the bank ATM for Benazir income support program
  • Prepared and generated various documents control report

Education

Diploma Associate Engineering in Computer Hardware - Computer Hardware

Government College of Technology
Swabi, Pakistan
08-2010

Skills

  • Laboratory testing
  • Filter operation
  • Water testing
  • Backwash procedures
  • Chemical handling
  • Microsoft Office
  • AutoCAD
  • SCADA Operating

Certification

  • Sydney, Australia
  • Work Health & Safety General Construction Induction (RTO800417) February 2024
  • Enter and Work Confined Spaces (RIIWHS202E) November 2023
  • Work Safely at Heights (RIIWHS204E) November 2023
  • Provide First Aid (HLTAID011) November 2023
  • Provide Basic Emergency Life Support (HLTAID010) November 2023
  • Provide Cardiopulmonary Resuscitation (HLTAID009) November 2023
  • Participate in a Rescue Operation (PUASAR022) March 2024
  • Work in Team (PUATEA001) March 2024

Timeline

RECYCLED WATER TREATMENT PLANT OPERATOR (BINGARA GORGE 2571)

Veolia Water Technologies (Australia) Pty Ltd NSW
08.2023 - Current

WATER TREATMENT PLANT SR. OPERATOR

Tabreed- National Central Cooling Co. Cooltech Water Treatment LLC
06.2022 - 06.2023

WATER AND SEWAGE TREATMENT PLANT OPERATOR

Metito Overseas LTD
10.2017 - 05.2022

SCADA/PRODUCTION/STP PLANT OPERATOR

Al Jazeera Group – Sewage / Water Treatment Plant
09.2013 - 10.2016

ATM MAINTENANCE OPERATOR

Bank Alfalah Pakistan Limited
06.2013 - 09.2013

Diploma Associate Engineering in Computer Hardware - Computer Hardware

Government College of Technology
Waqas Muhammad