Surveyor experienced in both civil and construction surveying most notably looking after 300 George Street Brisbane. This 800 million dollar project entailed looking after three high rise buildings including an 82 storey building. This was undertaken over 4 years and combined earthworks set-out for footings, set-out for structures, creating control networks and ensuring verticality of all three buildings. Also undertaken within this project was the lease surveys on the podium levels and the checking of compression of the 82 storey building. Recently(last 3 years) have been the surveyor of the South Walker Creek Tailings Dam Lift, Ironbark Mine earthworks construction and Olive Downs Coal Processing Plant Earthworks construction as well as assisting on th Olive Downs Rail Loop.