Summary
Overview
Work History
Education
Skills
Certification
Software
Timeline
Generic

Zunoon CP

Team Lead - Project Engineering (Australian Citizen)
Point Cook

Summary

Dynamic Project Engineering Leader with expertise in overseeing cross-functional teams to deliver complex infrastructure. Strong track record of optimizing project planning, procurement, and design processes while maintaining a strong focus on safety, quality, and client satisfaction. Skilled in driving continuous improvement, managing stakeholder relationships, and ensuring timely, cost-effective project completion. Proven ability to inspire and develop teams, streamline operations, and deliver innovative engineering solutions that meet business objectives.

Overview

11
11
years of professional experience
6
6
years of post-secondary education
4
4
Certifications

Work History

Team Lead - Project Engineering

Beon Energy Solutions (Victoria Power Network)
05.2022 - Current
  • Lead and developed a high-performing Project Engineering team delivering complex civil works in large scale renewable energy and infrastructure projects for electricity utilities, infrastructure and renewable developers, commercial and industrial companies, and transport network operators across Australia.
  • Oversaw project planning, scoping, and tendering, optimizing design, procurement, and quality management to meet and exceed client expectations.
  • Managed resource planning and allocation, talent acquisition, and performance management of various teams across the business.
  • Took full ownership of procurement packages, building strong partnerships with contractors and consultants to deliver cost-effective, practical, and high-quality engineering solutions that satisfied all stakeholders.
  • Promoted a safe working environment by integrating health, safety, and environmental standards into every aspect of team operations and project delivery.
  • Ensured rigorous quality management through the development and implementation of quality management systems to maintain high standards.
  • Led continuous improvement initiatives, proposing innovative solutions that drove operational efficiency and enhanced team performance.
  • Cultivated strong relationships with stakeholders, serving as the go-to point of contact for negotiations and dispute resolutions.
  • Projects:
  • Suburban Rail loop project, Melbourne VIC (Client – Laing O’Rourke)
  • Design and construct for 3 substations for the Construction Power Works and Bulk Power Supply Points (BPSP) to supply the Tunnel Boring Machines (TBMs) during the construction and operation of the rail loop.
  • Limondale BESS (Client – RWE):
  • Design and build a 100MW Battery Energy Storage system with Tesla Megapacks
  • Quorn Park BESS and Solar Farm (Client – Enel)
  • Design and construct 80 MW solar farm with a 40 MWh battery energy storage system and a 132 kV network interconnection.
  • Girgarre Solar Farm (Client – Enel)
  • Design and construct a 93.5MW Solar Farm and Substation
  • Hastings Zone Substation, Hastings VIC (Client – United Energy)
  • Extension of 66kV and 22kV Sub and demolition of existing control building & installation of new control building.
  • Hickory Data Centre Substation, Truganina VIC (Client: Hickory Data Centre and Stack infrastructure)
  • Design and construct a new 66kV substation with 3 x 66kV Transformers.
  • Kidston Pumped Hydro Project, Kidston Queensland (Client: GenX Power)
  • Design and Construct a new 275kV Switching station and 275kV Transmission Line works.
  • Ararat Syncon Project, Ararat VIC: (Client: AEMO)
  • Design, Construct and Connect 275 MVA synchronous condenser at Ararat Terminal station.

Senior Project Engineer/Project Engineer

Multiworks Australia
05.2019 - 04.2022
  • Managed and coordinated a team of engineers and site supervisors to execute multiple complex construction projects from start to finish.
  • Delivered projects in high-risk locations including electrical substations, terminal stations, water treatment plants and high traffic roads.
  • Controlled engineering activities to maintain work standards, adhere to project timelines and meet quality assurance targets.
  • Commercial and financial management of projects including budgets, forecasts, cost tracking, payment claims and EOT’s.
  • Prepared project work methodologies, programs, payment schedules, quality and safety documentation. · Prepared and submitted tenders including all submission documents (up to $16m).
  • Mentored and trained junior engineers in construction practices and management processes.
  • Supported management throughout decision making and process improvement by involving in construction planning meetings, tender review meetings and project review meetings.

Projects:

  • Berrybank Windfarm Project (Client: Downer/Transgrid) Extension works of Berrybank Substation and Switching station. Works including construction of large transformer enclosures, equipment foundations, road and drainage works.
  • Coolaroo Substation (Client: Zinfra/Jemena) Bulk earthworks, construction of foundations for new control room and equipment’s, fencing works, conduit works and road & drainage.
  • Ford Broadmeadows Decommissioning (Client: AECOM/Ford) Decommissioning, deconstruction and demolition of the Ford Broadmeadows manufacturing facility. Works included Bulk earthworks, demolition works, installation of services, road and drainage works.
  • G&E Substation works, Port Melbourne (Client: Citipower) Constructed 3.4m high perimeter fence in high traffic industrial zone and other civil maintenance works.
  • Brooklyn TS Project (Client: Zinfra) Construction of large monopole foundations, access tracks, demolition works and perimeter fence along M1 freeway in Brooklyn Terminal Station.
  • Citipower Pit Remediation works (Client: Citipower) Remediation of multiple existing HV cable pits in high traffic roads in Melbourne CBD. Works including structural rectification works, precast roof replacement, service relocations and reinstatement of infrastructure.ole foundations, access tracks, demolition works and perimeter fence along M1 highway in Brooklyn Terminal Station.
  • Citipower Pit Remediation works (Client: Citipower) Remediation of multiple existing HV cable pits in high traffic roads in Melbourne CBD. Works including structural rectification works, precast roof replacement, service relocation and reinstatement of infrastructure.

Project Engineer/Site Engineer

Winslow Constructors
12.2018 - 05.2020
  • Prepared and submitted first principal and rollover tenders and variation works.
  • Acted as a company representative in client, consultant and subcontractor meetings and correspondences.
  • Liaised with authorities like Wyndham and Melton council, Vicroads, Powercor, Ausnet, Melbourne Water, City West Water, NBN and Vic-track.
  • Setting up progress claims, verifying and approving subcontractor claims.
  • Preparation of construction programs, progress reports and job-cost reports.
  • Organized and managed subcontractors, resources and site personnel.
  • Monitored day to day on site activities, conducted quality inspections and resolved design / construction issues.
  • Involved in planning, execution and daily KPI tracking of the projects.
  • Completed invoice processing, prepared Project Management Plan, compliance documentation and testing requirements for all aspects.
  • Updated daily and weekly checklists (safety, environmental and traffic management).
  • Conducted site inductions, safety meetings, SWMS review, Prestart and Permit to work for all employees and subcontractors.

Projects Completed:

  • Emerald Park Estate stages 4-11 and Tarneit Rd Intersection,Tarneit (Value- $21M). Client: Tarneit Consolidated

Development of 8 stages of subdivision (295 lots) and construction of signalised Tarenit Rd intersection. Works including Bulk Earthworks, Road and Drainage works, Sewer, Communication, Electrical, Gas and Water reticulation and traffic signal installation.

  • Orchard Estate Stages 1-9 and Davis Rd intersection, Tarneit (Value- $18.5M) Client: APD Projects and DAHUA Group.

Development of 9 stages of subdivision works (412 lots) and development of Davis road intersection.

  • Habitat Estate Stages 14-19, wetlands, Sayers Rd Intersection and Wetlands corridor shared path, Tarneit. (Value- $12.8M) Client: Satterlys Developers.

Development of 6 stages of subdivision works (247 lots), construction of Melbourne Water Wetlands, development of Homebush drive/Sayers road intersection and construction of 1.6km long shared path along the wetlands corridor of Habitat estate.

  • Edgeleigh Estate, Tarneit (Value-$2.5M) Client: Lennium Group.

Development of residential subdivision estate that comprised of 60 residential lots in Tarneit.

KPI Engineer

Winslow Constructors
03.2018 - 12.2018
  • Recorded KPI data by regular monitoring, measuring and tracking major works involving Bulk earthworks , Road & Drainage and Concrete works undertaken in 22 subdivision estates and infrastructure projects.
  • Developed and implemented KPI packs for projects to achieve optimum productivity and cost savings.
  • Prepared daily, weekly and monthly reports to provide information regarding the performance and profitability of ongoing projects.
  • Presented KPI performance data in Site meetings, Constructors planning meetings and Quarterly board meetings.
  • Assisted Project Managers to track individual project performance and pricing works.
  • Involved in training of Graduates, Leading Hands and Site Foremen to track activities and achieve best KPI results.

Graduate Engineer

Winslow Constructors
07.2017 - 03.2018
  • Prepared takeoffs for different site works.
  • Assisted the Foreman in measuring, marking and inspecting of works.
  • Kept document control register up to date with latest revision of drawings to reflect in all controlled copies.
  • Completed site paperwork including safety checklists, inductions, KPI data collection and time-sheets.
  • Gained understanding of manual laboring techniques, construction procedures, working with construction equipment’s & machines and operating hand/power tools.
  • Developed strong understanding of construction works, site plans and company policies.

Structural Engineer

Design Spectrum-Structural/Project Mgmt Consultant
07.2014 - 06.2015

Worked on various projects including apartments, educational institutions and residential buildings. Primarily involved structural design, construction management, quality control and client interaction.

  • HANCO Sree Ganesh (G+5) Apartments, Palakkad- Handled design, construction management and quality control.
  • Zealots Villa Project, Calicut- Complete Structural design of 9 luxury villas.
  • Dr.Ramesh Apartment, Calicut (G+2) - Project Coordinator.
  • Abdul Gafoor Commercial Complex, Calicut- Involved in Design and Quality control.

Education

Master of Construction Management -

DEAKIN UNIVERSITY AUSTRALIA
Geelong
01.2015 - 05.2017

Bachelor of Science - Civil Engineering

SRM UNIVERSITY
INDIA
07.2010 - 06.2014

Skills

    Construction management

    Financial management

    Design development

    Quality management systems

    KPI tracking

    Operations management

    Process improvement

    Regulatory Compliance

    Safety compliance

    Human resources management

    Performance monitoring

Certification

Melbourne Water Green card

Software

MS Project

AutoCAD

Etabs

STAAD Pro

Therefore Navigator

Bluebeam Revu

MS Office

Primavera P6

Timeline

Team Lead - Project Engineering

Beon Energy Solutions (Victoria Power Network)
05.2022 - Current

Senior Project Engineer/Project Engineer

Multiworks Australia
05.2019 - 04.2022

Project Engineer/Site Engineer

Winslow Constructors
12.2018 - 05.2020

KPI Engineer

Winslow Constructors
03.2018 - 12.2018

Graduate Engineer

Winslow Constructors
07.2017 - 03.2018

Master of Construction Management -

DEAKIN UNIVERSITY AUSTRALIA
01.2015 - 05.2017

Structural Engineer

Design Spectrum-Structural/Project Mgmt Consultant
07.2014 - 06.2015

Bachelor of Science - Civil Engineering

SRM UNIVERSITY
07.2010 - 06.2014

Melbourne Water Green card

Construction White card

Leadership Excellence

Leading at Beon

Zunoon CPTeam Lead - Project Engineering (Australian Citizen)