Adept at leading teams and enhancing productivity, I leveraged strong organizational and problem-solving skills at Tranex Solar Pty Ltd to improve project efficiency and safety. My expertise in mechanical installations and maintenance, combined with a knack for fostering teamwork, has consistently ensured project success and quality standards.
Adept at strategic planning and problem-solving, I significantly enhanced productivity and efficiency at Pilecom Pty Ltd by streamlining operations and fostering team collaboration. My strong analytical skills and proficiency in mechanical remediation led to improved project flexibility and safety, showcasing my ability to lead and innovate in challenging environments.
- Aldoga Solar Farm
- Nextracker System ( XTR Version )
- Mechanical Job
• Booming
• Alignment
• Swaging
• Ubolt Drills
• Ubolt Torque
• Module rail Drills
• Module rail Torque
• Tube Installation
• Damper Installation
• Pile Bracket Installation
• Sludrive Installation
• Material Distribution
• Mechanical Remediation
• Booming / Swaging Hydraulic Guns Maintenance
• Hydraulic Pump / Hose Maintenance
• Assisted supervisor with various daily tasks which improved productivity and resulted in better efficiency
• Spoke with peers to verify task completion, meeting tight deadlines, and schedules
• Improved work site safety, identifying potential hazards and implementing preventative measures
• Supported quality control efforts, ensuring that work met or exceeded standards
• Improved project flexibility, quickly adapting to changing tasks and priorities
- Kerang Solar Farm
- Nextracker System
- Mechanical Job
• Booming
• Alignment
• Swaging
• Ubolt Drills
• Ubolt Torque
• Module rail Drills
• Module rail Torque
• Tube Installation
• Damper Installation
• Pile Bracket Installation
• Sludrive Installation
• Material Distribution
• Mechanical Remediation
• Booming / Swaging Hydraulic Guns Maintenance
• Hydraulic Pump / Hose Maintenance
• Managed conflict resolution among team members, fostering a positive and collaborative work environment
• Maintained an inclusive and diverse team culture, promoting respect and understanding among all members
• Collaborated with other department leaders to establish shared goals and ensure alignment across teams
• Established open and professional relationships with team members to achieve quick resolutions for various issues
- Wellington Solar Farm
- PVH System ( New Version )
• Install the post head and sludrive bracket and doing post head and sludrive bracket alignment
• Sludrive Installation
• Tube Installation
• Drive Bar Installation
- Armidale Solar Farm
- Nextracker System
- Mechanical Jobs/Task
• Booming
• Alignment
• Swaging
• Ubolt Drills
• Ubolt Torque
• Module rail Drills
• Module rail Torque
• Tube Installation
• Damper Installation
• Pile Bracket Installation
• Sludrive Installation
• Material Distribution
• Mechanical Remediation
• Solar Module Installation
• Booming / Swaging Hydraulic Guns Maintenance
• Hydraulic Pump / Hose Maintenance
• Set performance expectations for the team, monitoring progress towards goals and providing constructive feedback as needed
• Empowered team members by delegating responsibilities according to individual strengths and areas of expertise
- Gympie Solar Farm
- Nextracker System
• Do Alignment to make a BHA look beautiful or straight, need to follow the tube which way tube going down or going up before want to do a swaging.
• Do Swaging After Alignment is already done, use Hydraulic Guns to swage Pin / Collar, before swag need to look or double check alignment just to make sure everything is good and good to go for swage, delivered a good quality after that.
• Do Booming after Tubing Team already done install the tubes, booming is like a Bom Torque Tubes, before others mechanical task, need to do Booming First to make sure Tubes is already fit with each other Tubes.
• Pile Remediation, fix everything whatever mistake came from Piling Rig Operator or Offsider.
• Mechanical Remediation, fix everything whatever mistake came from all of the mechanical task or Team to make sure in the end everything we do delivered a good quality to finish the project.
• Assisted supervisor with various daily tasks which improved productivity and resulted in better efficiency.
• Can fix the Booming Gun, Swaging Gun, Cutter Gun, Hydraulic Hose and Hydraulic Pump, got this skill and can help a mechanic and leading hand to make sure everything going smoothly.
- Hillston Solar Farm
- PVH System
• Pile Distribution
• Being a Piling Rig Offsider
• Install the post head and sludrive bracket and doing post head and sludrive bracket alignment
• Sludrive Installer
• Tubing Installer
- Wellington Solar Farm
- ATI System
• Solar Panel Modules Installer
• Installing Drive lines / Motors
• Mechanical works to build ATI tracking system
• Mechanical works at the station crew to deliver for row tracking system
•Installing bracket and place the bracket so that the tube can be installed
• Do the remediation works, identify faults and damage that occurs after installing the panel
- Limondale Solar Farm
- Idlematec System
• Work as a mechanical labour at site, install and build all the mainframe part such a traverse, bracket, bearingand make sure that part in good position.
• Install a Solar panel, nuts and bolt after complete building all the frame. Also do a drilling, torquing andmarking for the panel team.
• Be a spotter of forklift and telehandler in logistic team. Layout all the materials for mechanical team withforklift and telehandler. Make sure all the part in good condition after layout.