Communicated with team members using hand signals and radios.
Partnered with crew members to use stop and slow paddles for multi-directional traffic control.
Assembled signs and cones to direct traffic through construction sites.
Routed traffic around construction sites for worker and driver safety.
Rigger
Studio Steel
01.2022 - 11.2023
Rigged for heavy lifts according to blueprint requirements.
Improved lifting efficiency with proper selection of rigging equipment for specific tasks.
Increased workplace safety by conducting regular rigging inspections and equipment maintenance.
Worked at heights without difficulty.
Steel erecting operations and reading drawings and plans.
Intermediate Rigger
LCR
01.2021 - 01.2022
Ensured accurate load calculations for safe lifting operations, reducing potential hazards onsite.
Enhanced job site productivity through timely identification and resolution of rigging-related issues.
Conducted regular safety briefings before each lift operation, emphasizing the importance of teamwork and communication among crew members.
Increased workplace safety by performing thorough rigging inspections and ensuring proper maintenance of equipment.
Improved lifting efficiency with the correct selection and usage of slings, shackles, and other rigging equipment.
Intermediate Rigger
Freo Group
02.2018 - 08.2021
Conducted regular safety briefings before each lift operation, emphasizing the importance of teamwork and communication among crew members.
Implemented best practices for load control measures, ensuring stability during crane lifts and minimizing risks associated with heavy load movements.
Contributed to project completion on time by effectively collaborating with crane operators and other team members.
Optimized equipment utilization by promptly identifying required repairs or replacements for damaged components or gear items.
Contributed to a culture of safety awareness by actively participating in safety meetings, tool-box talks, and other relevant training sessions.
Crane Rigger
Newcastle Stevedores
03.2014 - 07.2018
Ensured precise load placement by accurately calculating load weights and determining proper rigging configurations.
Performed pre-lift meetings with all involved parties to promote clear communication and understanding of roles and responsibilities throughout the lift process.
Assisted crane operators with detailed load charts and calculations in order to guarantee safe weight distribution during the lift process.
Mastered various knots and hitches when securing loads for transport or aerial delivery, optimizing stability and safety of the items being moved.
Minimized project delays by promptly identifying and addressing any rigging issues or malfunctions.
Maximized team productivity by providing comprehensive training to new crew members on safe rigging practices.