Summary
Overview
Work History
Education
Skills
Websites
car and motorcycle driving,game streaming
Timeline
Generic
CHANGSEOP PARK

CHANGSEOP PARK

Brisbane,QLD

Summary

Working as an electrical engineer assist, tile assistant, farm hand, I learned the most about safety and communication with people, and I learned that each field is completely different, but what they have in common is that if you communicate with people and learn and pay attention to safety, you bring your work a little closer to completion. It's pretty hard work, which usually takes more than 10 hours to work, but I think I had a great time thanks to the support of my colleagues and family. I want to continue to gain good experience at your company and help you

Overview

5
5
years of professional experience

Work History

Farm Hand

Ci-syuan CAI
05.2023 - 11.2023

I worked diligently for about 6 months on the farm. In the 2nd month, I started working at the strawberry packinghouse and was in charge of transporting and organizing strawberries. Since I have worked in a warehouse in Korea, I was often in charge of loading and transporting goods with pallet jackets, and my skills were recognized by my manager, so I worked as a leader of the transport team. I always paid attention to safety accidents by communicating smoothly with people. So I always checked the surroundings and communicated with my team members. I also have a forklift license, so when the driver was absent, I drove once in a while and did my best to help with my work

Industrial Electrician Helper

Namsuk Kim
01.2020 - 09.2022

In Korea, I mainly worked on cable line opening at Samsung semiconductor plant. I have about 4 to 5 years of experience working. 2017~2018,2020~2022

At the construction site of the semiconductor factory, I mainly worked on installing electronic panels, cable piping, and cable installation in the sandwich box and main computer control room for the operation of electronic devices in each section. There were many installations from 2 to 5 meters above the site, and a lot of materials were made for cables called cable ducts to pass through. Therefore, I always paid attention to the safety of the site, had meetings with team members, and always kept safety rules in mind.

Installation of the electronic panel - Check the damage and operation of the item and receive transportation to the site. After installing the panel, the anchor was placed on the floor, the cable was pulled out and connected to the sensors in the location

Manufacturing under piping installation- If only two or three cables pass, piping is mainly installed. To avoid interference from the sensor location and equipment, we check and manufacture figures. When manufacturing, we use a bending machine to adjust the necessary angles, cut, and install pipes on site.

Cable Duct Manufacturing-Same installation and manufacture on site. If the equipment and sensors at each location need a lot of cables, cable ducts are used, and manufacturing is essential because it is usually installed on the upper part of the building and a lot of equipment overlaps.
Cable ducts are made of steel and are recognized by bosses because they mainly weld grinder for angle control and length control and have a lot of learning and performance

Cable terminal work - If cables are installed and each equipment and sensors are located, the computer must control and manage them, so the wires must be connected. When working on a terminal, remove the cable skin, connect the contact ring, connect it to the main terminal, and check it. In this case, we work by checking the operation and safety of the sensor through two-person work

Tile Assistant

Dany Lee
02.2019 - 02.2020

It's my first time in Australia and I've worked for about a year

Tile transportation and fabrication -
It's huge and heavy because we use so many different tiles in the field. But I've built up my stamina through work, and I transfer the tiles to the engineers, and if necessary, I make shapes through cutting of the tiles. With a grinder and a tile cutter, they calculate the figures, cut the tiles, and transfer them to the engineers

Glue, cement, sand transport and fabrication -
First, mix sand with cement to make the floor flat. To make floor bed, mix it with a shovel or use equipment to mix water, transfer it to a trolley, and deliver it to the technician

The glue for attaching tiles is made by combining it with water with a tile mixer and delivered to the technician.

Skirt Tile Work-
There are also tiles that attach to the floor and wall. In that case, the tiles left after cutting were reused to reduce losses and to work by attaching them them themselves.

Groot Work -
After I put on the tiles, there is a space between the tiles and I filled it in. It's the end of the process, so I have to make sure, so I worked hard, bending my knees and waist a lot

Education

High School Diploma -

Shinjung High School
Korea
03.2017

Skills

  • Forklift Operation
  • Drive license

car and motorcycle driving,game streaming

 I got hooked on motorcycles in Australia. I used to love driving and I love the sense of going somewhere listening to music. So it's really good to buy a camera to take pictures of the scenery while riding a motorcycle and capture the moments when you have a valuable experience

I have participated in broadcasting and competitions as a hobby of playing a game called Tekken. Because of this, I often traveled to other countries and communicated with the viewers through this game, and now I'm an Ambassador of a controller company, and I'm gaining a lot of strength from my broadcasting activities. I made a lot of foreign friends through this game, and I feel healed while playing this game, so it's a very precious hobby 

Timeline

Farm Hand

Ci-syuan CAI
05.2023 - 11.2023

Industrial Electrician Helper

Namsuk Kim
01.2020 - 09.2022

Tile Assistant

Dany Lee
02.2019 - 02.2020

High School Diploma -

Shinjung High School
CHANGSEOP PARK