

With a career spanning up to 20 years commencing in 2003 at Murrin with AGC i am a safety focused licensed Advanced Rigger / Scaff specialising in construction and mine site maintenance.
As a multi skilled and diligent team player i possess strong technical and problem solving skills with the ability to work in remote areas under challenging conditions.
i offer flexibility to work various shifts while adhering to OH&S policies and procedures, throughout my career i manage KPI’s such as take 5’s Hazard Observations and tool box talks and I am %100 committed and focused on safety to myself my workmates and the environment, i bring up to 20 years experience mentoring and respectfully engaging in courageous conversations and i believe if given the opportunity i would be a valuable team member
• Executed dual swing core crew coverage of live plant and GTG3 Frame 9 Hot Gas Path Inspection Rigging and Scaff Support
• Erect / Dismantle Quick Stage and Tube and Clip scaffolds
• Dogman 20ton franna lift and safely transport loads throughout site,
• 120ton all terrain crane conduct lifting operations lift and position filter disposal Bins adjacent to GTG3 mid level platform for safe removal of filters.
• Remove / Install Actuators and PSV's using chainblocks
• Extract Transformer pre works train two - Demarcation & Set up 220 ton crane
• Lift and install structural support beams
• Extract Transformer from substation onto support beams using come alongs within Radius of 220 ton crane.
• Conduct heavy lift of 32 ton transformer safely onto trailer and secure for transport.
GTG3 Outage Hot Gas Path Inspection rigging team member
• removal and storage of Chutes, panels, structural steel and Turbine Components with Gantry Crane and Chainblocks
• Gantry crane with heavy lift rigging configeration - Lift / Remove 34 ton Rotar from turbine and place into frame for cleaning and inspection
• Conduct dual crane lifts with 20 ton franna and gantry crane - lift and rotate 9 ton turbine components onto flatracks (GTG3 loading bay)
• Area 12 Workshop support Mech Fitters 20ton franna Lift and rotate turbine parts for cleaning maintenance and transport
• remove and Install turbine components
• Operate 13 ton forklift and Telehandler
Port Hedland Port Authority MOF
• conduct lifts with 200 ton crane Load 20m Large Bore pipes onto truck, secure for transport, Unload Pipes in Laydown for storage and demobe.
Northern Star Gold Mine Ball Mill maintenance
• Dogman 25 ton franna load and unload ball mill platform with ball mill liners, machinery, tooling and general lifts
Mineral Resources Bald Hill
• Conduct lifts with 90 ton crane
remove and reinstall pumps, screens, cyclones
South Flank Area C
• Dogman 25 ton franna remove
• Remove / Reinstall drive motor for stacker reclaimer
Whaleback - 750 ton Pin Jib crane
• Build heavy lift rigging configuration
• remove crusher, bin liners and Chute.
120 ton all terrain crane
• General lifts Remove redundant rolller frames from Platform to ground level
RESPONSIBILITIES
Structural mechanical and Piping crew
• Managed and conducted Large bore pipe install into piperack -Visually Scope / plan task, precisely install chain blocks, build rigging configeration of pipework and conduct test lift.
RESPONSIBILITIES
RESPOSIBILITIES
Iron Bridge pipeline project, slurry pipeline and return water pipeline Install
• Set up job front with compressor, Generator, Bolts, Hi Torque, Shade, Tooling, Rigging, Position Excavators • Conduct dual lifts with excavators and connect pipe flange faces
• install Bolts and tension with rattle gun
• assist mech fitters with Hi Torque tension bolts to correct specification
• Conduct Lifts with 20 ton franna and 80 ton crane
maintenance and shutdown support
• Dogman 25 ton franna - lift and safely transport loads throughout site
• remove / install magnetic seperation chutes and Cyclones with Gantry crane
• Lifts as required for Pump maintenance 20 ton franna and 80 ton crane,
• remove / reinstall pipework and Launders from inside modules using chainblocks.
Inlet, train one, train two, PR and MR compressor decks and STG combined power power plant pre shut rigging installation of Rigging, Tooling, working @ Heights, Scaff gear and shutdown Execution
• Erect Tube and Clip Scaffold for MR compressor deck Gantry crane access,
• Conduct Crane Lifts 120ton crane mobilise scaff gear to job fronts.
• conduct visual inspections of mechanical rigging job scopes, capture methodology
• source and mobilise rigging gear for task and Install rigging (beam trolleys, Beam clamps, head slings, chainblocks and engine hoists)
• collaborate with rope access team for rigging install at heights ready for shutdown execution
• Remove / replace spools, Valves, PSV's, Actuators, End caps, blinds, spades, strainers, overhaul of Biffi actuators for O ring change out including end plate and cylinder removal.
• Operate 16 ton forklift Lift and Position Enermech Containers machinery hoses and Parts ready for Nitrogen Purging Operations
Adv Rigger
Maintenance and shutdown support
• Remove and Install spools blades and shaft from inside confined space tank using chainblocks and 90ton crane.
• Steel Erection Pilot Plant Module
• Dogman 25 ton franna lift and rotate raker arm for thickener tank in laydown yard
• Lifts as required for Pump maintenance
•Operate Forklift
Wheatstone LNG Train one Major Turnaround Adv Rigger
130T crane - conduct lifts for Install of 5 ton Elbow on top of vessel
Install KBSS Grammaphone milling machinery with chainblocks
Remove and Reinstall Actuators, PSV's, structural beam and Spool blinding, Tooling, Scaff Gear
RESPONSIBILITIES
SCM21 Deconstruct / Reconstruct - Smelter building shutdown works
Inpex LNG Train two Major Turnaround
Pre Shut Rigging Activities
- Operate 16ton forklift Set up Rigging and Tool store compound
- 120ton crane lifts Scaff gear to various locations around site
-MR compressor deck Frame 7 Change Out
-Removal of fire suppression unit panels, Piping & Turbine Parts with Gantry crane and Chainblocks
-conduct lifts with 25 ton franna and gantry crane lift loads to ground for storage
-Conduct Dual Gantry Crane test lift with 109T counterweights.
-nightshift rigging support successful completion 109 ton Dual gantry crane frame 7 change out (world first)
-PR compressor deck Hot Gas Path Inspection mechanical rigging
- assist with removal and install of turbine components and parts using gantry crane and chainblocks,
-conduct lifts with 25 ton franna or gantry crane safely lift loads to ground for storage
- maintain PR deck rigging gear
- assist scaffolders with dismantle tube and clip scaffolds and demobe of scaff gear.
RESPONSIBILITIES
Walkway Tunnel Assembly -
(OHP) Dogman - lift and safely transport loads throughout site - shipping steel for demobe, heavy lift spreader bars and rigging, Structural Steel, concrete blocks
Load & Unload trucks and containers, install pumps at water pond,
-Assist steel erection for Transfer Station module
-Install Conveyor section and rollers for Rom Pad
(NPI) Gantry crane structural integrity Upgrade
demarcation and install brackets onto columns,
-install structural bracing using SWL 5ton Spider crane and chain blocks,
- Tension bolts
- assist boilermakers with reworks.
RESPONSIBILITIES
Eliwana
RESPONSIBILITIES
Shutdown maintenance -
Pre works - install chainblocks ready for load transfer
- Dogman 20 ton franna mobilise structural steel to job front.
- Remove and install pipe bracing transferring load from crane hook to chain blocks - - - 220 Ton all terrain crane - remove / reinstall head chute from conveyor
- high pressure water blast to descale Thickener tank
- Assist knife gate install using gantry crane
- TA for boilermakers
structural 004 crew
RESPONSIBILITIES:
Steel Erection, mechanical and piping rigging
Dom Gas line blowing and Reinstatement crew -
Dom Gas reinstatement
Train 2 and Dom Gas compressor deck roof crew
RESPONSIBILITIES
120ton All Terrain Crane conduct lifts, Co-ordinate and unload trucks
PROFESSIONAL DEVELOPMENT
Proven ability to deliver safe and complex rigging support across large-scale projects and Shutdowns in remote settings
Scaffolding & Access Systems: Competent in erecting and dismantling tube & clip and quick-stage scaffolds,
Forklift ,Telehandler and mobile crane Operation: Licensed experienced in operating forklifts telehandlers including 3 years experience operating 20 and 25 ton frannas with legitimate references
Working at Heights, Confined Spaces and Gas Testing trained and compliant
Permit acceptor / Permit Holder trained compliant with demonstrated knowledge of
permit systems, gas testing, hazard identification including continuous coordinated pre task communication with area authority
Teamwork consistant Communication, Courageous Conversations, professional, safety-focused attitude and the ability to collaborate effectively across multidisciplinary teams
Heavy and Dual crane lift Rigging & Planning: Experienced in interpreting and constructing engineered lift studies and assembling customised
heavy lift configerations
Equipment Inspection, Tagging & Compliance: Proficient in inspecting, testing and tagging rigging and working-at-heights equipment in line with site and legislative standards