Summary
Overview
Work History
Education
Skills
Timeline
Generic
Clint Parnham

Clint Parnham

Perth,Australia

Summary

With a career spanning up to 20 years commencing in 2003 at Murrin with AGC i am a safety focused licensed Advanced Rigger / Scaff specialising in construction and mine site maintenance.

As a multi skilled and diligent team player i possess strong technical and problem solving skills with the ability to work in remote areas under challenging conditions.

i offer flexibility to work various shifts while adhering to OH&S policies and procedures, throughout my career i manage KPI’s such as take 5’s Hazard Observations and tool box talks and I am %100 committed and focused on safety to myself my workmates and the environment, i bring up to 20 years experience mentoring and respectfully engaging in courageous conversations and i believe if given the opportunity i would be a valuable team member

Overview

13
13
years of professional experience

Work History

Rigger / Scaff (Core Crew Coverage / GTG Shutdown)

ALTRAD
Barrow Island, Western Australia
12.2024 - 04.2025

• Executed dual swing core crew coverage of live plant and GTG3 Frame 9 Hot Gas Path Inspection Rigging and Scaff Support

• Erect / Dismantle Quick Stage and Tube and Clip scaffolds

• Dogman 20ton franna lift and safely transport loads throughout site,

• 120ton all terrain crane conduct lifting operations lift and position filter disposal Bins adjacent to GTG3 mid level platform for safe removal of filters.

• Remove / Install Actuators and PSV's using chainblocks

• Extract Transformer pre works train two - Demarcation & Set up 220 ton crane

• Lift and install structural support beams

• Extract Transformer from substation onto support beams using come alongs within Radius of 220 ton crane.

• Conduct heavy lift of 32 ton transformer safely onto trailer and secure for transport.

GTG3 Outage Hot Gas Path Inspection rigging team member

• removal and storage of Chutes, panels, structural steel and Turbine Components with Gantry Crane and Chainblocks

• Gantry crane with heavy lift rigging configeration - Lift / Remove 34 ton Rotar from turbine and place into frame for cleaning and inspection

• Conduct dual crane lifts with 20 ton franna and gantry crane - lift and rotate 9 ton turbine components onto flatracks (GTG3 loading bay)

• Area 12 Workshop support Mech Fitters 20ton franna Lift and rotate turbine parts for cleaning maintenance and transport

• remove and Install turbine components

• Operate 13 ton forklift and Telehandler

Rigger (Shutdowns)

FREO GROUP PTY LTD
Northern Star Gold mine, South Flank (BHP) & Bald Hill Lithium mine, Western Australia
09.2024 - 12.2024

Port Hedland Port Authority MOF

• conduct lifts with 200 ton crane Load 20m Large Bore pipes onto truck, secure for transport, Unload Pipes in Laydown for storage and demobe.

Northern Star Gold Mine Ball Mill maintenance

• Dogman 25 ton franna load and unload ball mill platform with ball mill liners, machinery, tooling and general lifts

Mineral Resources Bald Hill

• Conduct lifts with 90 ton crane

remove and reinstall pumps, screens, cyclones

South Flank Area C

• Dogman 25 ton franna remove

• Remove / Reinstall drive motor for stacker reclaimer

Whaleback - 750 ton Pin Jib crane

• Build heavy lift rigging configuration

• remove crusher, bin liners and Chute.

120 ton all terrain crane

• General lifts Remove redundant rolller frames from Platform to ground level

Adv Rigger /Adv Scaff

ALTRAD
Macedon Dom Gas
11.2023 - 05.2024

RESPONSIBILITIES

Structural mechanical and Piping crew

• Managed and conducted Large bore pipe install into piperack -Visually Scope / plan task, precisely install chain blocks, build rigging configeration of pipework and conduct test lift.

  • Lift and rotate pipework with chain blocks into correct orientation and conduct lifting operations to position pipe within entrance of piperack, transfer load from crane hook to chainblocks inside piperack position load successfull installation for special class welders
  • Install small bore pipes, compressor unit and structural steel
  • Dogman 25ton franna Lift rotate and Join pipework onto pipe stands with Precision
  • Assist Erect and dismantle tube and clip scaffold

Advanced Rigger (Shutdown Support)

MONADELPHOUS
CD3 Port Hedland, Western Australia
09.2023 - 11.2023

RESPONSIBILITIES

  • remove / reinstall dust suppression chutes with chainblocks and come alongs
  • Set Up Overflow crib rooms and Erect Dome Shelter in laydown yard
  • Stacker Reclaimer Drive Motor change out preworks - Set up exclusion zone Hot Bolt and Remove associated Drive Motor Parts, Install Conveyor Belt spreader bar, Come Alongs
  • Assist with removal and Install of Drive Motor
  • Train Rail Welding Machine Reworks - General Labour

Advanced Rigger / Telehandler Operator

KAEFER
Yara Urea Plant Karratha
04.2023 - 08.2023

RESPOSIBILITIES

  • Conduct Visual assessmemt of shutdown Job scopes with supervision team
  • Pre Shut Source and mobilise rigging, Tooling, structural steel, Crane Lifts as Required, Install Rigging and Working at Heights Gear, Set up Tool store
  • assist mech fitters with installation and removal of hi torque tensioning equipment,
  • ift and rotate 5 ton spool with 25 ton franna and place into frame
  • operate 2.5ton and 4ton Telehandler lift and safely transport loads throughout site, Load / Unload trucks - Lighting towers, EWP, Scissor Lifts, Structural Steel, Install valves with Jib Attachment (under Heat Exchanger Module)
  • Shitdown Execution Assist with Set Up of Job fronts tooling, machinery, Parts, rigging, Working @ Heights, Lighting, Fuel, encapulation, Exclusion Zones, Housekeeping
  • 120ton crane - (Pre Lift Team meeting for safest most practicable rigging configeration upgrade including spreader bar) Remove / reinstall 5 ton valve with come alongs,
  • (Replace 86ton tube bundle rigging support) Collaborate with rope access for Rigging Install. remove and reinstall 6ton Elbow beneath Tube Bundle with Chainblocks
  • descale inside tube bundle with high pressure water cleaner
  • Structural integrity upgrade conduct Lifts with 200 ton crane Remove / reinstall gridmesh, brackets, braces and beams

Advanced Rigger

MONADELPHOUS
Iron Bridge, Western Australia
02.2023 - 04.2023

Iron Bridge pipeline project, slurry pipeline and return water pipeline Install

• Set up job front with compressor, Generator, Bolts, Hi Torque, Shade, Tooling, Rigging, Position Excavators • Conduct dual lifts with excavators and connect pipe flange faces

• install Bolts and tension with rattle gun

• assist mech fitters with Hi Torque tension bolts to correct specification

• Conduct Lifts with 20 ton franna and 80 ton crane

Advanced Rigger (Shutdown Support)

KARRIDALE GROUP PTY LTD
Karara (Geraldton), Western Australia
09.2022 - 01.2023

maintenance and shutdown support

• Dogman 25 ton franna - lift and safely transport loads throughout site

• remove / install magnetic seperation chutes and Cyclones with Gantry crane

• Lifts as required for Pump maintenance 20 ton franna and 80 ton crane,

• remove / reinstall pipework and Launders from inside modules using chainblocks.

Advanced Rigger (Shutdown Train 1)

SKOUT SOLUTIONS (VENTIA)
Inpex Project - Ichthys LNG Darwin, Northern Territory
04.2022 - 08.2022

Inlet, train one, train two, PR and MR compressor decks and STG combined power power plant pre shut rigging installation of Rigging, Tooling, working @ Heights, Scaff gear and shutdown Execution

• Erect Tube and Clip Scaffold for MR compressor deck Gantry crane access,

• Conduct Crane Lifts 120ton crane mobilise scaff gear to job fronts.

• conduct visual inspections of mechanical rigging job scopes, capture methodology

• source and mobilise rigging gear for task and Install rigging (beam trolleys, Beam clamps, head slings, chainblocks and engine hoists)

• collaborate with rope access team for rigging install at heights ready for shutdown execution

• Remove / replace spools, Valves, PSV's, Actuators, End caps, blinds, spades, strainers, overhaul of Biffi actuators for O ring change out including end plate and cylinder removal.

• Operate 16 ton forklift Lift and Position Enermech Containers machinery hoses and Parts ready for Nitrogen Purging Operations

Advanced Rigger (Shutdown Support)

TAYLORS ENGINEERING & WELDING SERVICES
Mt Keith Nickel, Western Australia
11.2021 - 12.2021

Adv Rigger

Maintenance and shutdown support

• Remove and Install spools blades and shaft from inside confined space tank using chainblocks and 90ton crane.

• Steel Erection Pilot Plant Module

• Dogman 25 ton franna lift and rotate raker arm for thickener tank in laydown yard

• Lifts as required for Pump maintenance

•Operate Forklift

Advanced Rigger (Shutdown)

AGC | AUSGROUP | MAS
Wheatstone Onslow, Western Australia
09.2021 - 10.2021

Wheatstone LNG Train one Major Turnaround Adv Rigger

130T crane - conduct lifts for Install of 5 ton Elbow on top of vessel

Install KBSS Grammaphone milling machinery with chainblocks

Remove and Reinstall Actuators, PSV's, structural beam and Spool blinding, Tooling, Scaff Gear

Advanced Rigger (shutdown)

MONADELPHOUS
Olympic Dam, South Australia
07.2021 - 08.2021

RESPONSIBILITIES

SCM21 Deconstruct / Reconstruct - Smelter building shutdown works

  • install working at heights gear,
  • emove pipe bracing, handrails & columns
  • install platforms using 120 ton slew crane and chain blocks
  • Install rail beams for smelter removal using chain blocks & pull lifts
  • erect dribble chute in laydown yard, mobilise chute to gantry crane lift zone, Transfer dribble chute from gantry crane to chain blocks for install

Advanced Rigger (Shutdown Train 2)

SKOUT SOLUTIONS (VENTIA)
Inpex Ichthys LNG Darwin, Northern Territory
04.2021 - 06.2021

Inpex LNG Train two Major Turnaround

Pre Shut Rigging Activities

- Operate 16ton forklift Set up Rigging and Tool store compound

- 120ton crane lifts Scaff gear to various locations around site

-MR compressor deck Frame 7 Change Out

-Removal of fire suppression unit panels, Piping & Turbine Parts with Gantry crane and Chainblocks

-conduct lifts with 25 ton franna and gantry crane lift loads to ground for storage

-Conduct Dual Gantry Crane test lift with 109T counterweights.

-nightshift rigging support successful completion 109 ton Dual gantry crane frame 7 change out (world first)

-PR compressor deck Hot Gas Path Inspection mechanical rigging

- assist with removal and install of turbine components and parts using gantry crane and chainblocks,

-conduct lifts with 25 ton franna or gantry crane safely lift loads to ground for storage

- maintain PR deck rigging gear

- assist scaffolders with dismantle tube and clip scaffolds and demobe of scaff gear.

Advanced Rigger

CPB CONTRACTORS
Ironbridge, Western Australia
02.2021 - 03.2021

RESPONSIBILITIES

Walkway Tunnel Assembly -

  • install panels together into large sections and lift into position, bolt out tunnel assembly and tension bolts
  • General Lifts - 80 ton crane unload rio bar from trucks, Lift Compressors, generators, Form work into position

Advanced Rigger/Dogman

CLOUGH
Southflank BHP, Western Australia
10.2020 - 01.2021

(OHP) Dogman - lift and safely transport loads throughout site - shipping steel for demobe, heavy lift spreader bars and rigging, Structural Steel, concrete blocks

Load & Unload trucks and containers, install pumps at water pond,

-Assist steel erection for Transfer Station module

-Install Conveyor section and rollers for Rom Pad

(NPI) Gantry crane structural integrity Upgrade

demarcation and install brackets onto columns,

-install structural bracing using SWL 5ton Spider crane and chain blocks,

- Tension bolts

- assist boilermakers with reworks.

Advanced Rigger

CIVMEC
Eliwana FMG, Western Australia
09.2020 - 10.2020

RESPONSIBILITIES

Eliwana

  • 200ton crawler - Lift and safely travel with 44meter conveyor sections place load into radius for Install
  • 500 ton crawler - conduct heavy lift 44 meter Gallery and install with surveyor, install shims and secure load
  • 200 ton crawler Install 99 ton crusher and realign ith come alongs
  • Plan and document heavy lift methodology and submit lift study
  • punch list items - install and align gridmesh, kickplates and handrails

Advanced Rigger (Shutdown)

MONADELPHOUS
Tropicana Gold Mine, Western Australia
08.2020 - 08.2020

RESPONSIBILITIES

Shutdown maintenance -

Pre works - install chainblocks ready for load transfer

- Dogman 20 ton franna mobilise structural steel to job front.

- Remove and install pipe bracing transferring load from crane hook to chain blocks - - - 220 Ton all terrain crane - remove / reinstall head chute from conveyor

- high pressure water blast to descale Thickener tank

- Assist knife gate install using gantry crane

- TA for boilermakers

TRAVEL AND RECONNECT WITH FAMILY AND FRIENDS

TRAVEL, R & R AND PERSONAL DEVELOPMENT
08.2018 - 07.2020

Advanced Rigger

BECHTEL
Wheatstone LNG Project | Onslow, Western Australia
01.2015 - 07.2018

structural 004 crew

RESPONSIBILITIES:

Steel Erection, mechanical and piping rigging

  • Erect modules walkways and platforms in Laydown yard ready for transport to job fronts. (100 ton crawler)
  • Install platforms walkways and modules for Heavy Removals Column, CO2 Absorber, Solvent Regen, Oxidiser Heat Exchanger vessels WHRU (cold box) Fin Fan modules, and compressor decks
  • Stick build Staircase access for fin fan modules and compressor decks
  • Train one compressor deck install columns and secure with rigging to concrete blocks
  • Conduct Heavy lifts Install Roof Truss to columns.
  • Remove shipping steel with 20 ton franna and chain blocks ( modules transported from overseas)
  • nstall ladders for access with chainblocks
  • Yard Duties - Locate and tag structural steel, Gridmesh, kickplates and Handrail in laydown yard.
  • (80 ton crane and 20 ton franna) conduct dual lifts rotate chutes in mechanical laydown yard
  • Rigging store - Test and tag rigging and working at heights gear
  • install working at heights gear
  • Punch list items complete to spec - instal gates, remove / reinstall gridmesh for reworks, align gridmesh and secure with Hilti System.

Dom Gas line blowing and Reinstatement crew -

  • secure and barricade pipework line bllowing perimeter radio contact with work group prior to compressed air release

Dom Gas reinstatement

  • Removal and Reinstallation of Pipes, Valves and blinding ready for handover to commissioning

Train 2 and Dom Gas compressor deck roof crew

  • Complete steel erection infill steel braces and beems, bolt out structures and tension bolts
  • Crane lifts - roof mesh, roof sheets, tooling
  • assist roofing crew with install of roof sheets and downpipes, Install and maintain working at heights gear
  • general housekeeping

Advanced Rigger/Scaffolder/Franna & HR Truck Operator

ATCO STRUCTURES AND LOGISTICS
Wheatstone LNG Onslow, Western Australia
10.2013 - 12.2014

RESPONSIBILITIES

  • Operate 20ton and 25 ton franna load and unload trucks -machinery and parts, firewater tanks and pump, General lifts throughout site

120ton All Terrain Crane conduct lifts, Co-ordinate and unload trucks

  • Erect Bechtel Permanent Office Complex Medical Center, Training Facilities, Security Hut, Crib Rooms and Containers,
  • Involved in designing lift studies with Operator
  • Conduct heavy lift of 35ton weld rod room
  • Operate 9ton truck - secure and safely transport loads throughout site.
  • Erect and Dismantle scaffolds for roof access - Office complex, Cape Wharehouse, Training Facilities, Medical center,
  • Erect edge protection for roofing crew, install and maintain working at heights gear
  • Operate Water Cart for concrete crew and dust suppression

Advanced Rigger/Franna Operator

FORGE GROUP
West Angeles Fuel Infrastructure Project, Western Australia
07.2013 - 09.2013
  • Diesel storage tanks - install rafters, steel panels, gurts, roof petals, centre columns, stairways and platforms install weld machine for tank, (250 ton crawler , 70 ton rough terrain crane)
  • Operate 20 ton franna, conducting daily pre-starts, maintaining rigging gear, lifting and safely transporting loads throughout site, loading and unloading trucks, erecting scaffold platforms around tank.

Advanced Rigger/Franna Operator

FORGE GROUP
Hope Downs 4, Western Australia CPLJV
06.2012 - 06.2013
  • Steel erection modules for central facilities - HVLV workshop, administration building, stores warehouse, explosives warehouse, light vehicle workshop, tyre maintenance, gas bottle storage and bulk lube storage, substations
  • 130 ton all terrain crane and 70 ton Todano - Camp construction Lift and place 30 ton Dongas.
  • Operate 20 tonne Franna - Dual crane lift, Tail module for installation of HVLV workshop module (130 tonne All Terrain Crane).
  • Lift and safely transport loads throughout site, load and unload trucks.
  • Erect and dismantle scaffolds.

Education

Diploma -

GRIFFITH UNIVERSITY
Qld (External)
01-2001

Skills

    PROFESSIONAL DEVELOPMENT

  • Confined Space / Gas Test / Working@Heights - Saferight
  • Open Crane - Skills Training
  • White Card – Aveling
  • First Attack Fire - Saferight
  • First Aid – St Johns
  • Advanced Rigging and Dogging - CSTC
  • Compliant - FMG,, BHP, RIO TINTO, NEWMONT, CHEVRON
  • Advanced Scaffolding - CSTC
  • EWP - CSTC
  • LF – IFAP
  • Telehandler – Skills Training
  • Bobcat- Skills Training
  • Skilled in conducting Rigging and Lifting Operations in construction and mine site maintenance on various major projects specialising in structural, mechanical and piping
  • Proven ability to deliver safe and complex rigging support across large-scale projects and Shutdowns in remote settings

    Scaffolding & Access Systems: Competent in erecting and dismantling tube & clip and quick-stage scaffolds,

    Forklift ,Telehandler and mobile crane Operation: Licensed experienced in operating forklifts telehandlers including 3 years experience operating 20 and 25 ton frannas with legitimate references

    Working at Heights, Confined Spaces and Gas Testing trained and compliant

    Permit acceptor / Permit Holder trained compliant with demonstrated knowledge of

    permit systems, gas testing, hazard identification including continuous coordinated pre task communication with area authority

    Teamwork consistant Communication, Courageous Conversations, professional, safety-focused attitude and the ability to collaborate effectively across multidisciplinary teams

    Heavy and Dual crane lift Rigging & Planning: Experienced in interpreting and constructing engineered lift studies and assembling customised

    heavy lift configerations

    Equipment Inspection, Tagging & Compliance: Proficient in inspecting, testing and tagging rigging and working-at-heights equipment in line with site and legislative standards

Timeline

Rigger / Scaff (Core Crew Coverage / GTG Shutdown)

ALTRAD
12.2024 - 04.2025

Rigger (Shutdowns)

FREO GROUP PTY LTD
09.2024 - 12.2024

Adv Rigger /Adv Scaff

ALTRAD
11.2023 - 05.2024

Advanced Rigger (Shutdown Support)

MONADELPHOUS
09.2023 - 11.2023

Advanced Rigger / Telehandler Operator

KAEFER
04.2023 - 08.2023

Advanced Rigger

MONADELPHOUS
02.2023 - 04.2023

Advanced Rigger (Shutdown Support)

KARRIDALE GROUP PTY LTD
09.2022 - 01.2023

Advanced Rigger (Shutdown Train 1)

SKOUT SOLUTIONS (VENTIA)
04.2022 - 08.2022

Advanced Rigger (Shutdown Support)

TAYLORS ENGINEERING & WELDING SERVICES
11.2021 - 12.2021

Advanced Rigger (Shutdown)

AGC | AUSGROUP | MAS
09.2021 - 10.2021

Advanced Rigger (shutdown)

MONADELPHOUS
07.2021 - 08.2021

Advanced Rigger (Shutdown Train 2)

SKOUT SOLUTIONS (VENTIA)
04.2021 - 06.2021

Advanced Rigger

CPB CONTRACTORS
02.2021 - 03.2021

Advanced Rigger/Dogman

CLOUGH
10.2020 - 01.2021

Advanced Rigger

CIVMEC
09.2020 - 10.2020

Advanced Rigger (Shutdown)

MONADELPHOUS
08.2020 - 08.2020

TRAVEL AND RECONNECT WITH FAMILY AND FRIENDS

TRAVEL, R & R AND PERSONAL DEVELOPMENT
08.2018 - 07.2020

Advanced Rigger

BECHTEL
01.2015 - 07.2018

Advanced Rigger/Scaffolder/Franna & HR Truck Operator

ATCO STRUCTURES AND LOGISTICS
10.2013 - 12.2014

Advanced Rigger/Franna Operator

FORGE GROUP
07.2013 - 09.2013

Advanced Rigger/Franna Operator

FORGE GROUP
06.2012 - 06.2013

Diploma -

GRIFFITH UNIVERSITY
Clint Parnham