
https://www.linkedin.com/in/danish-f-278214114?utm_source=share&utm_campaign=share_via&utm_content=profile&utm_medium=android_app
I am a passionate Adv Rigger/Scaffolder with extensive exposure to Marine construction and Resource industry. Experienced in all kind of Maintenance in live oil and gas, Mining industry. I have had a clean safety record with a zero harm policy. Experience in all kinds of rigging techniques, tube and clip Scaffold and franna/roughy cranes. Can provide more detail and references
Advnced Rigger/Scaffolder L1 Rope Currently on 2:2 roster on North Rankin platform and Goodwin A Platform. Been part of Fabric Maintenance team doing big structural repair, modifications and demo work. Highly experienced working over the side/water, obtaining/holding permits and creating lift plans.
Project works 2:2 roster at Varanus Island just off Barrow Island Santos offshore Gas Facility. Tasks include General services operator Telehandler Franna Forklift rigging/Scaffolding
Wood side KGP Train 1 Major Turnaround. Rigging Tasks for Valve Crew replacement of all kinds of valves 180 works fronts around the train. Flange management, Simple/Critical lift plans
Core shutdown crew for the pilbars region Rio Tinto iron ore and Roy Hill port
Major Turnaround at Geelong Oil Refinery Viva energy. Preventative maintenance in a high risk petrochemical environment. Exchangers and spool
Work. Spading despading.
Major Turnaround at Altona Qenos Resins facility.
Ethylene gas to Polyethylene conversion.
All tasks from Spading/Despading , replacement of Solvet, hydrogen and colling water spools valvues, actuators and Hydro testing. All in a hazardous petrochemical environment.
Major Turnaround at QNP Ammonium Nitrate plant. Moura Qld . Rigging work at their Nitric acid reactor, Air separation units and general valve actuator replacement around the plant.
Ugl Maintainence Crane Crew
maintainence on Digestion unit 3 and 4
RIO Yarwun Alumina production
Setup and Replacement of All types of Valves, actuators, spools, heaviest one 12 ton. Molsives catalyst change over. Obtaining and holding permit for the works front.
General preventative Maintainence on plant including oil colling system, refractory, Cooling towers and gas turbines. Mostly rigging in acid suits in high risk areas.
BOC liquid Oxygen air separation plant upgrade. Replacement of all the coolers in 4 units. Valve and actuator replacement.
Rigging to Build fastest catamaran ferries in the world up to 130m. Rigging for everything that goes in a ship (Big Modules, steel jigs ,59t Diesel motors, gearboxes shafts impellers water jets ,seats and ect) and mainly preparation and launch of the vessel on bogies or air bags usage of heavy duty turfers winches skates blocks and hydraulic Jacks up to 200t. Tug boats or Capstains
1× Shutdown Prominent Hill Mine SA
2 × Shutdown NewMont Tanami NT Gold Mine
1× Shutdown Penrice Quarry Barossa Valley
Maintenance on conveyor system , oar bins , chutes and wear plates. Machinery replacement Ball and sag mill maintenance
4 week shutdown Impact Fertiliser
Rebuild of acid rock mixer , Burner and Kiln, the classifier and the granulation drum. Other general stuff like screw and bucket conveyors. Fans and motors.
Major Bucket rail conveyor rebuild cs1. Chutes and scrapers. Rollers. Filter house filter bag replacement.
Zinc lead Smelter Port Perie Shutdown Major mould chain conveyor rebuild.
Advanced Rigging
Advanced Scaffolding
L1 Rope Access
Bosiet/Huet CA-EBS
Msic and police check
Recent Oguk medical
C6 Crane
Recent Working at heights
Recent Confined Space Entry
Recent Atmosphere Gas Test
All Voc's
Manual Drivers Licence
Telehandler, Forklift ,Ewp
White Yellow card
First aid, cpr ,basic firefighter