Senior Project Engineer with a proven track record excelling in site operations management and client engagement. Achieved significant project completion time reductions while ensuring safety compliance and quality control. Skilled in resource planning and fostering strong client relationships, consistently delivering projects on time and within budget.
Lake cargelligo embankment upgrade - Lake Cargelligo, NSW, 2672
• Earthworks
• Soil nailing and shotcrete stabilisation
• Drainage infrastructure (pits, pipes)
• Safety improvements: reinforcement barriers
• landscaping
Covalent Logistics road-113 Km Main road spec - Mount Holland WA 6426
• Earthworks and pavement construction
• stabilisation
• Drainage infrastructure (pipes, culverts)
• Bitumen sealing and asphalt placement
• Safety improvements: guardrail, signage, delineators
• Fencing
Boolgeeda Airport Resurfacing works - Rocklea WA 6751
B2 B4 ROADS - WA 6751
• Earthworks and pavement construction
• Drainage infrastructure (pits, pipes, culverts)
• Bitumen sealing and asphalt placement
• Safety improvements: guardrail, signage, and line marking
• Fencing
Belconnen trunk sewer - Belconnen ACT 2617
Rio Tinto - B2 Bus bay - Brockman 4, Western Australia 6751
• Earthworks and pavement construction
• Electrical, Communication infrastructure (pits)
• Bitumen sealing and asphalt placement
• Furniture
SGE Managed Aquifer Recharge - Western Australia 6751
Tailing dam - Tomingley NSW 2869
Wellington solar farm - Wuuluman NSW 2820
Wyee pipeline package 2 - Wyee NSW 2259
Design and analysis of structure(building) - Research work
• Ensure the structure is safe against all possible loading conditions
• Safety requirements must be met within the budget
• Analyse various building elements and their properties
• Ensure the structure is safe against all possible loading conditions
• Safety requirements must be met within the budget
• Analyse various building elements and their properties