Summary
Overview
Work History
Skills
Additional Information
Timeline
Generic
Howard Hokai

Howard Hokai

Brisbane,QLD

Summary

Thank you for taking the time to read about my experiences and the skills i have acquired over the last 8-9 years in the Scaffolding industry.

Im 30 years young and have been scaffolding since 2015 on various projects across Queensland Australia as well as works commencing as far down as northern New South Wales to deep inland regional NSW.

The traits I pride myself on is being an honest and loyal person who understands the importance of good work ethic. If you should choose to employ me i will endeavour to complete every task with a high level detail and in a timely manner.

On a personal level, I like to look at myself as life of the party to share my energy and make people laugh, They say a day without laughing is a day wasted.

Overview

2
2
years of professional experience

Work History

Santos/Downers Outage Hub 2

ACROW LTD
02.2024 - 03.2024
  • Continued erection modification through pipe racks
  • Assisting all trades with safe work platforms
  • Utilised problem-solving skills to troubleshoot and resolve issues with scaffolding structures.
  • Improved client satisfaction by addressing concerns promptly and professionally during the scaffolding process.

Mount Piper Power Station

ACROW LTD
02.2024 - 02.2024
  • Assembled, erected and dismantled scaffolding structures to meet project needs.
  • Assisted with tying off and securing scaffolding to building structures to optimize safety.
  • Adhered to OSHA regulations, ensuring a safe working environment for all team members.
  • confined space permit
  • internal erect/dismantle of coal loading drum

Eraring Power Station Shutdown

ACROW LTD
09.2023 - 11.2023
  • Followed OSHA regulations and safety standards when installing and working with scaffolding.
  • Assembled, erected and dismantled scaffolding structures to meet project needs.
  • Inspected scaffolding for safety and structural integrity before each use.
  • Assisted in the development of project timelines, contributing to successful project completions.
  • Isolation Admin control systems
    working at heights permits
  • Confined space permits
  • 10.5 Hour shifts

Diamantina Power Station

ACROW LTD
07.2023 - 08.2023
  • Provide safe work platforms
  • Erecting and dismantling tube and clip scaffolds
  • Permits to works, SWMS
  • Cantilever and spur scaffolds
  • Working off engineered plans and scaffolds

Millmerran Power Station

ACROW LTD
05.2023 - 05.2023
  • Internal Boiler Dismantle
  • Manual Handling
  • Permit to work Systems
  • Confined spaces permit

Santos/Downers Outage Hubs 4 & 2

ACROW LTD
04.2023 - 05.2023
  • Santos Inducted
  • Acquired Santos Work Permit Procedure certificate (Santos requirement).
  • Erect and modify scaffold through pipe racks
    providing safe working platforms for all trades
  • Working at heights
  • Works off permit procedures

Phosphate Hill Major Shutdown

INCITEC PIVOT LIMITED
05.2022 - 07.2022
  • Using isolation admin control systems
  • Erect and dismantle scaffolds of multiple Internal and external Acid tanks
  • Chasing 100-200 metre long pipe racks using the Atpac system
  • Working off engineered approved plans
  • Demobilisation of all scaffolding equipment at the end of the project in an safe manner.

Note: The major shutdown concluded in July 2022 however I continued my employment until April 2023 completing various jobs on site.

Scaffolder

Uni Span/Acrow
09.2021 - 03.2022
  • Working on bridges building ground up Form support using Super Cup-Lock
  • Access and egress stretcher stairs
  • Providing tube and clip Edge protection from exposed Falls
  • shaped and cut materials to specified measurements using hand tools, machines and power saws
  • Working at heights permits
  • working 12 hour shifts.


Skills

  • Manual Drivers License
  • Construction White Card - 2012239
  • RTO no : 40592

  • Work safely at Heights - RIIWHS204D
  • Enter and work in confined spaces - RIIWHS202E
  • Gas test atmospheres - MSMWHS217
  • Work in accordance with an issued permit - MSMPER200
  • Safely Access the rail corridor - TLIF2080
  • Scaffold Basic (SB)-0003379284 01
  • Scaffold Intermediate (SI)-
  • Experience with various types of scaffolding such as Kwick stage, cuplock, Sherlock, At-Pac and Tube and Clip
  • Experience with Construction, Shutdown Outages, Maintenance, Long stint FIFO rosters and residential civil and Commercial with types of jobs ranging from Perimeter Scaffolding, Railway and Highway Bridge Upgrades, Bird cages, Truss scaffolding, Cantilevers and Spurs

Additional Information

Employment History from 2015 - 2021


Ezy Scaffolding

  • House wraps
  • Town house dismantle and erect scaffolds


Scafflink

  • Insurance works
  • Erect tube and clip Handrails


NSS scaffolding

  • Apartment Block full wraps
  • Erect/dismantle of Large scale viewing platforms


Bolt Scaffolding

  • Access to rail corridor
  • Rail bridge upgrade
  • Works over water

Timeline

Santos/Downers Outage Hub 2

ACROW LTD
02.2024 - 03.2024

Mount Piper Power Station

ACROW LTD
02.2024 - 02.2024

Eraring Power Station Shutdown

ACROW LTD
09.2023 - 11.2023

Diamantina Power Station

ACROW LTD
07.2023 - 08.2023

Millmerran Power Station

ACROW LTD
05.2023 - 05.2023

Santos/Downers Outage Hubs 4 & 2

ACROW LTD
04.2023 - 05.2023

Phosphate Hill Major Shutdown

INCITEC PIVOT LIMITED
05.2022 - 07.2022

Scaffolder

Uni Span/Acrow
09.2021 - 03.2022
Howard Hokai