I have high expectations of myself and the work I do. Having worked in the construction industry for a number of years I’m not afraid of accountability and or criticism. I enjoy problem solving and finding alternative solutions to lighten the workload.
Erecting Formwork and edge board for concrete. Standing columns. Working in stair core and lift core jumps
Stripping Formwork pans and conventional Formwork. Stacking materials. Stripping and stacking edge boards and set down materials.
Vacuuming waste at various mine sites and power station shut downs. Entering confined spaces and vacuuming waste material.
Can work in a team environment and be a team leader and also complete tasks independently in a timely manner
Display competent use of hand tools and machines including die cast aluminium and polymer injection moulding
Possess a high level of problem solving skills and very mechanically minded
References
Chris Avellino
Foreman/Safety representative
SEQ Formwork
0405 475 470
Robert French
AWCON Australia Wide Constructions
Safety Representative
0411 251 883