Marcus  Lawlor

Marcus Lawlor

Gold Coast

Summary

Dynamic Regional Area Manager at Hawthorne Civil with a proven track record in revenue growth and team leadership. Skilled in problem-solving and building strong relationships, I consistently improved operational efficiency and client satisfaction, driving successful project outcomes and fostering a collaborative work environment.

Overview

19
19
years of professional experience

Work History

Regional Area Manager

Hawthorne Civil
12.2024 - Current
  • Monitor Progress on multiple projects across QLD and NSW.
  • Ensure all sites all sites comply with legal, safety and Environmental regulations.
  • Led team to achieve company goals and exceed targets consistently, fostering a positive work environment.
  • Manage daily operations for optimal performance, ensuring timely completion of tasks and projects.
  • Conducted regular performance evaluations to identify areas for improvement and develop action plans for growth.
  • Conducted training sessions to educate employees on best practices and procedures to increase profitability.
  • Assist with Business Development to enhance company growth.
  • Assist with Tender submissions reviews.
  • Oversee the commercial management of contracts.
  • Continuously improved operational procedures through ongoing evaluation of existing practices, incorporating feedback from team members and adopting industry best practices.
  • Developed strong relationships with clients, leading to increased client satisfaction and repeat business.
  • Improved overall efficiency by identifying areas in need of improvement and implementing necessary changes.
  • Increased team productivity by streamlining processes and implementing more efficient systems.
  • Negotiated contracts to secure favourable terms that benefited both parties involved.
  • Managed revenue models, process flows, operations support, and customer engagement strategies.

Project Manager

Hawthorne Civil
07.2021 - 12.2024

Projects:

  • Coomera Connector North QLD DTMR($650M) - Bridge, Culvert and Retaining Wall FRP Package including minor Earthworks package($30M).
  • Hope Island New Train Station QLD DTMR($60m) - Construction of New Rail Platform & Station Structure. Works including minor earthwork, Bridge and Structure FRP works ($9M)
  • Coombabah Sewage Treatment Plant Upgrade QLD($160M)- Construction of New PTFC Preliminary Treatment Facility works included Earthworks , FRP and Pavements. ($7.5m)
  • Coffs Harbour Bypass Upgrade NSW RMS($2.2 Billion)Bridge, Culvert and Retaining Wall FRP Package including minor Earthworks package($32M).
  • Palm Beach M1 Upgrade DTMR ($570M) - Bridge, Culvert and Retaining Wall FRP Package including minor Earthworks package($13M).
  • Carmichael Rail Network QLD ($400M)-FRP works for four rail bridges, installation of 2km of precast Girders and construction of 17 drainage structures including earthworks. Works includes ongoing maintenance of Mine and Rail Networks. ($28M).
  • Exit 49 Pimpama Upgrade QLD DTMR ($120M)- Construction of New 2 Span Over Pass Bridge over live M1. Package included Culvert FRP and Earthworks Package ($9M)
  • Douglas Water Treatment Plant Upgrade Townsville QLD ($40M)-Construction of 2 Lamella Concrete Treatment Tanks.($7.5M)
  • Cooroy to Curra QLD DTMR– Section D ($500M) -Construction of 7 Super T Road Bridge Structures ($15M)
  • Townsville Northern Access Upgrade QLD DTMR($140M) Excavation and Construction of 53 RCBC and 10 RCP culverts. ($7M)
  • Burleigh Waters Deodar Drive Upgrade QLD- Stormwater Upgrade Project which included excavation and FRP of large stormwater pits including Pipe laying - ($4.0M)


Responsibilities:


  • Successfully managed multiple projects simultaneously by prioritizing tasks according to urgency, resource availability, and alignment with organizational goals.
  • Assist with Business Development to enhance company growth.
  • Assist with Tender submissions.
  • Oversee the commercial management of contracts.
  • Planned, designed, and scheduled phases for large projects.
  • Met project deadlines without sacrificing build quality or workplace safety.
  • Established effective communication among team members for enhanced collaboration and successful project completion.
  • Developed strong relationships with stakeholders through regular communication updates, fostering trust and confidence in the team''s ability to deliver results.
  • Collaborated closely with senior management to align project

objectives with strategic company initiatives, ensuring that efforts contributed to overall business growth.

  • Managed projects from Tender to Construction.
  • Prepared detailed reports on project status for stakeholders, ensuring transparency and alignment with objectives.
  • Created accurate budgets based on resource requirements, allowing for optimal allocation of funds across all aspects of the projects.


Senior Project Engineer

Seymour Whyte Constructions
05.2020 - 07.2021

Project:VL2B Package A| Burleigh, QLD DTMR ($120M)

  • Construction of 2 New Interchange Road Bridges and Retaining Walls built over the live motorway utilising bored piles and Super T Girders
  • Demolition of the two existing interchange bridges over the M1 using conventional mechanical demolition.
  • Public Utility Plant (PUP) protection, relocation and coordination.
  • Major Cross Drainage and longitudinal drainage
  • Various soil nail walls & retaining walls
  • Provision for future ITS installation (Variable Speed Limit Signs)
  • Temporary works to facilitate construction, Including TTM design and implementation, temporary pavements, temporary retaining structures including crane/piling pads etc
  • Road furniture and Signage


Responsibilities

  • Identified potential risks early in the process, allowing proactive mitigation measures to prevent delays or setbacks.
  • Reduced project completion times for increased client satisfaction by consistently meeting deadlines and delivering high-quality results.
  • Navigated challenging situations through creative problem-solving abilities which often resulted in expedited resolutions.
  • Oversaw worksite construction to coordinate with supervisors/Engineers and guide projects
  • .Monitor construction progress for adherence to programme and report to the Project Manager/Construction Manager.
  • Review monthly costs and report/forecast project performance
  • Develop & manage short term & long-term construction programmes.

Project Engineer

Seymour Whyte Constructions
07.2018 - 05.2020

Project:M2VL | Mudgeeraba, QLD DTMR ($170M)

  • Construction of 2 road bridges over water.
  • Construction of 1 road bridge over road – this was the highly relevant Stapley Drive Bridge (four-span bridge at 97.3m long x 27m wide, built over the live M1 motorway).
  • Construction of 7 new Concrete Retaining Walls with the main wall RW-07 constructed between Rail Corridor and Existing M1 which included bored piles.
  • Demolition of the two road bridges over creeks using conventional mechanical demolition.
  • Demolition of the Stapley Drive Bridge (two-span bridge) using conventional mechanical demolition. Involved in the re-sequencing of the construction of new Stapley Drive Bridge and M1 traffic staging to enable offline demolition of the existing Stapley Drive Bridge which was originally planned for demolition over live M1 Motorway

Responsibilities:

  • Provided technical expertise throughout all phases of the project, ensuring accurate execution of designs and specifications.
  • Development and implementation of overall construction staging, planning and assist with development of the Master Program.
  • Maintained records for each project and engineering discipline.
  • Monitored installation of materials and equipment for compliance with drawings and specifications.
  • Completed construction tasks while providing safe working conditions, staying on budget and meeting project deadlines.

Project Engineer

Seymour Whyte Constructions
06.2017 - 07.2018

Project:W2B Section 3 Bridges Woolgoolga to Ballina RMS -($70M)

  • Managed the construction of 7 twin- Super T Bridges simultaneously. These bridges were self-performed.
  • Management of precast supply and delivery for 36 bridges which included Prestressed Girders & Deck Units, Precast Parapets and Headstocks.
  • Assist with developed and implemented overall construction staging, planning and the Master Program.
  • Assist with preparation of all the major lift studies for all critical lifts while on the project.
  • Nominated Project Crane Appointed Person and Crane Supervisor to review Lift Study’s and Supervise critical crane lifts.


  • Provided technical expertise throughout all phases of the project, ensuring accurate execution of designs and specifications.
  • Maintained records for each project and engineering discipline.
  • Monitored installation of materials and equipment for compliance with drawings and specifications.
  • Completed construction tasks while providing safe working conditions, staying on budget and meeting project deadlines.

Project Engineer

Rocla
04.2014 - 06.2017
  • Managed construction teams and maintenance staff of over 100 employees in large concrete precast culverts/panels, precast/pre-stress bridge beams/Girders piles and large concrete pipe manufacture.
  • Acquired hands on experience in the operation of overhead gantry cranes, dogging for cranes lifting precast products to pre-stressed bridge beams. Gained experience with concrete pouring/ finishing/ repairing, concrete pipe/ culvert laying, concrete cutting/ drilling, welding reinforcement (mig/tig) and fabrication of steel components.


Successfully coordinated and managed precast and pre-stress concrete supply for large Capital Works Projects such as:

  • Gold Coast Light Rail
  • Gold Coast Airport
  • Toowoomba Range Crossing
  • Pacific Highway Upgrade Woolgoolga to Halfway Creek
  • Gateway Upgrade
  • Morten Bay Rail Expansion
  • Hay Point Coal Terminal Expansion
  • Sandy Creek Bridge Replacement
  • Laidley Rail Bridges Replacement
  • Sandy Gully Bridge Replaceme Mackay


Responsibilities:

  • Maintained records for each project and engineering discipline.
  • Monitored installation of materials and equipment for compliance with drawings and specifications.
  • Completed construction tasks while providing safe working conditions, staying on budget and meeting project deadlines.
  • Ensured quality control for all aspects of the project, reducing defects and rework.
  • Identified technical risks within managed projects.
  • Proficient in operation and calculations of prestressed concrete stressing beds

Project Engineer

Rocla
10.2011 - 06.2014

Projects:

  • Hay Point Expansion Coal Terminal BHP ($37M) Supply of over 4,000 bridge deck units and 10,000 precast kerbs.
  • Townsville Ring Road ($20M)
  • Sandy Gully Bridge Replacement ($6)
  • BHP Mine Extension ($15)
  • Managed two Prestress Bridge construction teams and maintenance staff of 60-70 employees.
  • My managing role was hands on, due to staff inexperience and given the substantial expansion of the plant.
  • Oversaw concrete pouring/ finishing/ repairing, concrete pipe laying/ joining from 225mm -3000mm diameter, concrete cutting/ drilling, welding reinforcement (mig/tig) and fabrication of steel components to Australian Standards/TMR&RMS specifications. Proficient in operation of prestressed concrete stressing beds.

Key Achievements:

  • Successfully delivered over 4,000 prestress bridge beams for Hay Point Expansion on time and on budget.
  • Successfully Project Manage delivery of plant expansion on time and on budget.

Lessons Learned:

  • Due to the mining boom in Mackay staff availability was extremely difficult to manage as the company struggled to compete with salaries that mining companies were offering. Learned the value of having long term employees within the team.
  • Learnt the importance of having the correct blend of experienced employees with new employees.

Site Leading Hand

PC Construction
05.2006 - 06.2011

Projects:Various Civil and Building Projects across Ireland.


This was family run business where i learned valuable hands on experience in the following disciplines:

  • Carpentry & Roofing
  • First and second fixing
  • Plastering and rendering
  • Block/ brick laying
  • Concrete pipe laying
  • Form Working & Steel Fixing
  • Concrete finishing and repairing
  • Cutting and drilling
  • General Earthworks
  • Landscaping
  • Surveying and setting out

Responsibilities:

  • Developed a strong rapport with staff members through effective communication and leadership skills.
  • Enhanced team productivity by efficiently allocating tasks and closely monitoring progress.
  • Facilitated smooth workflows by proactively identifying potential issues and implementing corrective measures.
  • Promoted safety awareness among the workforce, leading to reduced incidents and accidents on site.

Education

Bachelor of Engineering - Civil Engineering

Institute of Technology Carlow
Ireland
07-2010

Skills

  • Practical thinking
  • Build and Maintain Relationships
  • Revenue growth
  • Teamwork and collaboration
  • Problem-solving
  • Team leadership
  • Excellent communication

Training

  • Confined Space Awareness,
  • Certificate IV in Competitive Systems and Practices,Certificate IV in Safety Leadership (WHS)
  • Certificate II in Surface Extraction Operation
  • RIW Rail SARC WET
  • White Card
  • Dogging Licence
  • Working at Heights
  • Crane Supervisor and Appointed Person
  • First Aid
  • RMS Concrete Grey Card (B80 Bridgeworks

Timeline

Regional Area Manager

Hawthorne Civil
12.2024 - Current

Project Manager

Hawthorne Civil
07.2021 - 12.2024

Senior Project Engineer

Seymour Whyte Constructions
05.2020 - 07.2021

Project Engineer

Seymour Whyte Constructions
07.2018 - 05.2020

Project Engineer

Seymour Whyte Constructions
06.2017 - 07.2018

Project Engineer

Rocla
04.2014 - 06.2017

Project Engineer

Rocla
10.2011 - 06.2014

Site Leading Hand

PC Construction
05.2006 - 06.2011

Bachelor of Engineering - Civil Engineering

Institute of Technology Carlow
Marcus Lawlor