Key Projects :
1- SMP RTU configurations for SWC and MDR substations in Horizon Power:
Duration: 11/2022 - 02/2023
Rols and Responsibilities :-
- Configured SWC RTUs to accommodate new and modified signals from the four new meters (SEL-735) using SMP
- Implemented MDR RTU configuration to update metering data points using DNP, replacing the previous Modbus protocol
- Configured SWC POA to align with the new RTU configurations and reflect the updated metering data points
- Updated MDR POA configurations to incorporate the changes made to the RTU and metering data points
- Using Microstation to update various drawings, such as SCADA termination diagrams, SCADA schematic diagrams, and communications and SCADA block diagrams
2- Project name : AEMO WEMDE Project (Integration New market system WEMDE with e-terra system )
Duration: 03/2023 - 12/2023
Rols and Responsibilities :-
- Implemented database modifications to the Eterra system interface (Generation units - substations) using E-Terrasource, enabling seamless data integration from the market system
- Customized and optimized existing SCADA and RTGEN displays, and alarms to efficiently monitor and manage information from the new market systems
- Developed and incorporated new SCADA calculations, including changes to MARKET load and existing AGC dispatch calculations
- Effectively executed configuration changes in the OAG DB, ensuring a smooth and successful cutover process
- Conducted weekly updates and deployment of the database via TDM in both WEM and NEM preproduction/test environments
- Collaborated with the team to verify the accuracy and consistency of the reliability SMP RTU
- Proactively identified and resolved any discrepancies or issues in the loaded database to maintain data accuracy and reliability
- Actively participated in testing and quality assurance activities to validate the functionality and performance of the systems after each update
- Created user documentation, such as start-up procedures, operational instructions and maintenance manuals
3- LDESS Battery Integration with KUN Substation:
Duration: 04/2024 - 06/2024
Rols and Responsibilities :-
(Led the detailed design for the integration of an LDESS battery with the KUN substation)
Rols and Responsibilities :-
- Designed RTU updates to accommodate the LDESS battery, ensuring compatibility and improved operational functionality
- Developed the configuration plan for Citect SCADA 2018, allowing efficient monitoring and control of both the battery and the substation systems
- Created work procedures and testing protocols to ensure the smooth implementation of the system design, following industry standards and best practices
4- AEMO/GE Customizations – Network Applications:
Duration: ongoing
Currently working on the customization of AEMO’s e-terra system with a focus on
network applications such as RTNET, STNET, Contingency Analysis (CA), and Remedial Action Schemes (RAS).
Rols and Responsibilities :-
- Worked closely with developers to review and implement necessary changes in network applications, including RTNET, STNET, CA, and RAS
- Escalated technical challenges and coordinated with GE's product team to resolve issues effectively
- Conducted rigorous testing to ensure that all customizations were applied correctly and worked seamlessly in AEMO's system
- Collaborated with AEMO's team to resolve ongoing issues, improving system reliability and functionality
- Managed display and database changes to accommodate the network application customizations, ensuring accurate system performance
- Worked with multiple international teams to facilitate cross-border collaboration and achieve project goals