Summary
Overview
Work History
Education
Skills
Certification
References
Education and Training
Timeline
Generic

Quade Paterson

0498445756
Tighes Hill,NSW

Summary

Highly-motivated employee with desire to take on new challenges. Strong worth ethic, adaptability and exceptional interpersonal skills. I have 5 years expierence in the coal industry, in this time I have progressed to become a shift superviser. Where I have organised and managed many site shutdowns. Where i have lead a team of 8 workers, carried out all permits and relative paperwork. Through out my career i have worked on projects all over NSW and interstate.

As a company owner, I picked up alot of skills creative to growing a successful business and maintaining client satisfaction and reaching Deadlines !

At this time in my life I'm looking for a new challenge, Whether it be, mining, chhp related jobs, construction- residential, commercial and industrial or poor building. Superviser rolls and or leeding hands

Overview

19
19
years of professional experience
1
1
Certification
12
12
years of post-secondary education

Work History

Site Supervisor/Leading Hand

Rubbertec
Beresfield , Nsw
02.2022 - Current
  • CHPP shutdown work.
  • Trained new team members on site policies and procedures.
  • Maintained records and logs of work performed and materials and equipment used.
  • Worked with personnel and managers to meet strict timelines.
  • Oversaw personnel safety and efforts at work site.
  • Supervised material usage and contractor man-hours to keep projects in line with budgetary restrictions.
  • Developed work schedules for team members to maximize shift coverage.
  • Implemented best practices and safe operating procedures.
  • Conducted thorough quality assurance checks on completed work, ensuring compliance with industry standards and client requirements.
  • Enhanced site safety by implementing strict safety protocols and conducting regular inspections.
  • Provided clear communication to team members regarding goals, expectations, and individual responsibilities within the project scope.
  • Guided employees and contractors in task completion, offering assistance to meet tight deadlines.
  • Collaborated with management and fellow supervisors to organize operations and achieve demanding schedule targets.
  • Improved employee morale through consistent leadership support, fostering a positive working environment conducive to productivity.
  • Oversaw equipment maintenance routines regularly ensuring optimal performance levels across all machinery used onsite.
  • Resolved issues among team members to keep employees on task.
  • Maintained strong client relationships, providing regular updates on project progress and addressing any concerns promptly.
  • Managed subcontractors effectively, monitoring performance and offering guidance as needed to ensure alignment with overall project goals.
  • Ensured compliance with all regulatory requirements, keeping projects on track and avoiding penalties.
  • Conducted thorough risk assessments to proactively address potential issues, maintaining project timelines.
  • Optimized labor allocation to meet project milestones ahead of schedule, demonstrating effective team leadership.
  • Coordinated with contractors and teams for timely project completion, ensuring efficiency and quality.
  • Addressed and resolved onsite conflicts swiftly, maintaining positive and productive work environment.
  • Supervised installation of critical infrastructure, ensuring adherence to technical specifications and standards.
  • Enhanced site safety by implementing rigorous daily inspection routines.
  • Oversaw quality control processes to uphold high standards of workmanship, exceeding client expectations.
  • Managed procurement of materials to stay within budget, negotiating favorable terms with suppliers.
  • Achieved high levels of client satisfaction through meticulous attention to detail and proactive communication.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Directed projects according to schedule and quality demands.
  • Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.
  • Developed and maintained positive relationships with clients and other stakeholders.
  • Trained workers in proper methods, equipment operation and safety procedures.

Remedial building

Rcr
02.2020 - 01.2021

Concrete patch repair, structural concrete repair. Steel fixing, waterproofing. Tiling. Rendering.concreting

Industrial Tiling

cumi
Newcastle, Nsw
01.2021 - 02.2022
  • CHPP shutdown work
  • Industrial tiling, pipe lining, rubber lining

Self employed

Self employed tradesman
01.2014 - 01.2020
  • Qualified in all aspects of floor and wall tiling
  • Qualified in all aspects of cement rendering
  • Concreting
  • Landscaping
  • Epoxy pool and grouts
  • Waterpfooing
  • Concrete repair
  • Pebble creating
  • Pool plumbing
  • Proved successful working managing tight deadlines and a fast-paced environment.
  • Demonstrated strong organizational and time management skills while supervising multiple projects. With multiply people.
  • Worked well in a team setting, providing support and guidance.

Tiling and Rendering

Vision Pools
01.2009 - 01.2015
  • Self-motivated, ownership on all projects
  • Skilled at working independently and collaboratively in a team environment.
  • Proven ability to organise and lead big teams of people on large projects.
  • Competent skills are but not included too
  • Rendering (trade)
  • Tiling (trade)
  • Concrete repair
  • Concrete slabs
  • Pool renovations
  • Pool plumbing and start up
  • Pebble creating

Apprenticeship

MS Tiling
01.2006 - 01.2009
  • Supported staff members in their daily tasks, reducing workload burden and allowing for increased focus on higher-priority assignments.
  • Analyzed problems and worked with teams to develop solutions.

Education

Open Foundation Studies

Newcastle University
01-2013

Year 10 Certificate

Belmont High School
01-2005

Trade Certificate in Floor And Wall Tiling

Cert 3 - Rendering

Qualify Me
2013.04 - 2025.06

Skills

  • Glencore- Ravensworth, Mt owen, Lydell, HVO, Bulga
  • Thiess- Mt pleasent
  • Yancoal- mt thorley, walkworth
  • Bloomfield- Ricks creek
  • Vissy
  • Aurizen
  • AGL
  • Team supervision
  • Site coordination
  • Site safety
  • Construction safety
  • Safety assessment
  • Construction supervision
  • Subcontractor management
  • Project oversight
  • Quality assurance
  • Material procurement
  • Operations management
  • Permit acquisition
  • Personnel oversight
  • Building codes
  • Inventory procurement
  • Maintenance and repair
  • Worker supervision
  • Team leadership
  • Decision-making
  • Attention to detail
  • Safety oversight
  • Effective communication
  • Job planning
  • Site measuring and marking
  • Site maintenance
  • Construction management
  • Following instructions
  • Commercial construction experience
  • Multi-project coordination
  • Customer relations
  • Employee training
  • Site inspection
  • Relationship building
  • Employee management
  • Self control and integrity
  • Safe operating procedures
  • Physical strength and stamina
  • Worker training
  • Basic mathematics
  • Heavy lifting
  • Hand and power tool operation
  • Employee motivation
  • Materials estimation
  • Risk mitigation
  • Loading and unloading trucks
  • Equipment Repair
  • Lockout and tagout

Certification

  • Working at heights
  • Confined space level 3
  • Cpr
  • First aid
  • First lock holder
  • Trade qualified superviser
  • White card
  • Trade qualified render
  • Trade qualified tiler
  • Dogman & basic rigging

References

Riley dear- manager Rubbertec                0435 754 034

Sam frew- building contractor                    0487 407 768

Sam Sheldon - engineering superviser       0413 089 955

Education and Training

I completed year 10 with great grades, Then went straight into a tiling  apprenticeship. Followed by a tiling apprenticeship. Completed my open foundation course with distinction. I’ve also completed numerous special role bass education a training.

Timeline

Site Supervisor/Leading Hand

Rubbertec
02.2022 - Current

Industrial Tiling

cumi
01.2021 - 02.2022

Remedial building

Rcr
02.2020 - 01.2021

Self employed

Self employed tradesman
01.2014 - 01.2020

Cert 3 - Rendering

Qualify Me
2013.04 - 2025.06

Tiling and Rendering

Vision Pools
01.2009 - 01.2015

Apprenticeship

MS Tiling
01.2006 - 01.2009

Open Foundation Studies

Newcastle University

Year 10 Certificate

Belmont High School

Trade Certificate in Floor And Wall Tiling
Quade Paterson0498445756