Summary
Overview
Work History
Education
Skills
Timeline
Generic
Renata Hura

Renata Hura

Brisbane,QLD

Summary

Competent Mechanical Superintendent with the utmost respect for Core Values, proficient in overseeing multiple contractors. Ensuring all work in strict compliance to applicable codes and standards. Observant with foresight in potential issue. Excellent time management, Excel in a fast-paced environments. Use of Build methodology best practices with high quality standards. A seasoned leader and problem-solver, planning and execution centreing around the project schedule.

leading and indorse environment & safety practices and encourage mental health awareness and openness.

Overview

7
7
years of professional experience

Work History

SMP Superintenedent - Construction Manager

ALL TYPE ENGINEERING
03.2024 - 05.2025

CLIENT - SENEX ENERGY

ATLAS Phase A & B

MIMAS Phase A

SMP Superintendent until the completion of Phase A August 2024

  • lead a team of 3 SMP supervisors 70 construction Personnel
  • Responsible for front-line field supervision, overseeing day-to-day site operations and ensuring that all SMP activities are executed safely, efficiently, and according to the project schedule. Report directly to the Construction Manager and act as the key link between field crews and management

Construction Manager

Auguster 2024 through to completion May 2025 Atlas B & Mimas A

Successfully completed Atlas phase B under time 10% under Budget Mimas phase A 5% under Budget

In Summary planned and Executed the installation of

18 Next Gen gas electric compressors packages

3 Enclose Vertical flare Packages

9 Switch rooms

Time Frame 14 Months

Duties

  • Review project plans, specifications, and schedules related to SMP scope.
  • Coordinate with engineering, procurement, and other construction disciplines.
  • Develop and manage SMP construction work schedules.
  • Participate in constructability reviews and provide input to design optimization.
  • Supervise the execution of structural steel erection, mechanical equipment installation, and piping systems.
  • Ensure compliance with construction drawings, specifications, and applicable codes.
  • Manage and monitor subcontractors and vendors on SMP works.
  • Coordinate equipment and materials delivery and handling on site.
  • Ensure all SMP activities comply with HSE (Health, Safety, and Environment) standards.
  • Conduct risk assessments and toolbox talks.
  • Enforce site safety rules and investigate any incidents.
  • Monitor project budgets related to SMP works.
  • Ensure efficient use of manpower, equipment, and materials.
  • Review and approve time sheets and progress claims.
  • Report progress, issues, and changes to the Project Manager.
  • Interface with clients, consultants, and regulatory bodies as required.
  • Maintain daily reporting and weekly progress tracking.

Senior Mechanical Supervisor

Ghella Cross River Rail
08.2022 - 01.2024
  • Supervised installation of different Structural Mechanical and Piping
  • Monitoring ensuring all work work activity are in line with drawings and specifications.
  • Worked effectively with other Client representatives and accompany all regulators all site inspection to achieve compliance.
  • Prepared submitting site related reports Daily ensure all activities are execute activities inline with the current schedule.
  • Planning all activities effectively, Monitor progress forecast and manage any unforeseen changes with effective planning
  • Coordinated assist Sub-contractor, ensure all onsite comply to all site Safety and Quality procedure.
  • Promote Company Core Values
  • Collaborated with leaders and employees to drive necessary change in mechanical operations.
  • Encourage employees drive one safety culture.
  • Documenting all activities for management daily,
  • Correcting problems and implementing improvement plans to boost quality of mechanical work.
  • Drive Training review mechanical department personnel status compliance for procedures and safety requirements.
  • Created and maintained daily and weekly reports for upper management.

Construction Site Supervisor

Altrad Services
07.2022 - 12.2022
  • Read plans and blueprints and communicated to workers.
  • Scheduled labor, ordered materials and coordinated with other contractors to complete projects.
  • Review Construction and Process Drawings ensure are issue for construction, Identify project specifications to completely and all work packs are available.
  • All direct labour have all drawing and Safety doc on site. all role are understand, all job requirements and safe work habbits and dr ive from supervision.
  • Monitor progress determine short falls in impairment a strategy
  • Managed subcontractor personnel activity and team resources to meet all project requirements.

Quality Control Lead Inspector (Contractor)

NACAP
01.2022 - 07.2022
  • Lead a team field Inspectors for all excavation, HTPE weld, inspection preparation and welding comply to all specs.
  • Participated in team meetings to discuss progress and results, providing ideas and suggestions for improvement.
  • Inspected incoming and outgoing materials accuracy and quality is at it highest standard .
  • Communicated with construction team members about quality issues.
  • Inspected quality of products, taking note of functionality, appearance and other specifications.
  • Performed non-destructive tests and report are kept updated.
  • Established strong relationships with suppliers to ensure receipt of high-quality raw materials for use in production processes.

SMP Superintendent

VALMEC - ALTRAD
10.2021 - 07.2022
  • Reviewed plans and inspected ongoing construction to keep work in line with project goals.
  • Established successful procedures for day-to-day operations and long-term planning.
  • Managed complete construction process to maximize quality, cost-controls and efficiency.
  • Maintained safety onsite and upheld all Safety regulations by drive a ONE safe .
  • Supported project coordination and smooth workflow by coordinating materials, inspections, and contractor actions.
  • Developed and maintained productive working relationships with internal and external stakeholders.
  • Analyzed reports to identify areas of improvement and implement corrective action.

SMP Superintendent

Valmec Australia
02.2021 - 10.2021
  • Reviewed plans and inspected ongoing construction to keep work in line with project goals.
  • Established successful procedures for day-to-day operations and long-term planning.
  • Managed complete construction process to maximize quality, cost-controls and efficiency.
  • Maintained safety onsite and upheld all OSHA regulations.
  • Developed and maintained productive working relationships with internal and external stakeholders.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Provided feedback to workers on job performance and safety procedures.
  • Created and implemented plans to maximize efficiency of workers.
  • Devised and implemented safety protocols to reduce risks on construction and extraction sites.

SMP Supervisor

Valmec Australia
03.2019 - 12.2019
  • Evaluated existing procedures and made proactive adjustments to meet changing demands.
  • Prepared, checked, and coordinated documentation to support component design and application.
  • Presented project information and status updates to customers and fielded concerns.
  • Recruited, placed and oversaw project staff for optimal project results.
  • Excellent communication skills, both verbal and written.
  • Passionate about learning and committed to continual improvement.
  • Managed time efficiently in order to complete all tasks within deadlines.
  • Proved successful working within tight deadlines and a fast-paced environment.
  • Used critical thinking to break down problems, evaluate solutions and make decisions.

SMP Contruction Supervisor

Valmec Australia
09.2018 - 02.2019
  • Applied strong leadership talents and problem-solving skills to maintain team efficiency and organize workflows.
  • Handled customer complaints, resolved issues, and adjusted policies to meet changing needs.
  • Maintained clean and well-organized production areas to avoid violations or unnecessary work delays due to hazards or inefficient layouts.
  • Monitored workflow to improve employee time management and increase productivity.
  • Maintained compliance with company policies, objectives, and communication goals.
  • Achieved results by working with staff to meet established targets.
  • Enforced rules and regulations outlined in company manual to set forth expectations comprehensibly and consistently.

Education

Some College (No Degree) - TAFE

New Zealand TAFE
Wellington New Zealand

Skills

  • Cert IV HSE
  • Operation oF Microsoft Projects
  • CV Crane
  • Tele-handler License
  • S1,S2,S3
  • C Class license
  • Welding Tickets Code 1554
  • Pressure testing to 29000kpa
  • Flange Management Planning Compliance and Testing
  • HUB, HEXAGON, CMS

Timeline

SMP Superintenedent - Construction Manager

ALL TYPE ENGINEERING
03.2024 - 05.2025

Senior Mechanical Supervisor

Ghella Cross River Rail
08.2022 - 01.2024

Construction Site Supervisor

Altrad Services
07.2022 - 12.2022

Quality Control Lead Inspector (Contractor)

NACAP
01.2022 - 07.2022

SMP Superintendent

VALMEC - ALTRAD
10.2021 - 07.2022

SMP Superintendent

Valmec Australia
02.2021 - 10.2021

SMP Supervisor

Valmec Australia
03.2019 - 12.2019

SMP Contruction Supervisor

Valmec Australia
09.2018 - 02.2019

Some College (No Degree) - TAFE

New Zealand TAFE
Renata Hura