Mr. Sousa has 8 years of experience of onsite engineering and project management for large scale civil projects. Project experience comes in a variety of disciplines such as, transportation, rail, large earthworks, geotechnical, environmental, structural and hydrological. He has a keen understanding of safe work procedures and safety management while directly working with contractors on interdisciplinary high-risk projects. Has strong experience and attributes for all aspects of construction delivery. He brings a client first attitude to help deliver a smooth project on time and on budget.
Project Portfolio
Shellharbour Station - Platform Extension
Role: Project Engineer/Project Manager
Project Value: $1.5m
Completion Date: December 2022
Redfern Station – Enabling Works
Role: Senior Project Engineer/Project Manager
Project Value: $2M
Completion Date August 2022
Redfern Station – Enabling Works
Role: Senior Project Engineer/Project Manager
Project Value: $2M
Completion Date August 2022
St. Marys Station – Enabling Works
Role: Senior Project Engineer/Project Manager
Project Value: $750K
Completion Date August 2022
Redfern Station – Platform Resurfacing
Role: Senior Project Engineer/Project Manager
Project Value: $4M
Completion Date June 2023
Bellambi Station – Level Crossing
Role: Senior Project Engineer/Project Manager
Project Value: $1M
Completion Date November 2023
Cranbrook CBH Out loading Facility – FRP Package
Role: Senior Project Engineer/Project Manager
Project Value: $3M
Completion Date November 2024
Moora CBH Out loading Facility – FRP Package
Role: Senior Project Engineer/Project Manager
Project Value: $3M
Completion Date April 2025
Daglish Station – Drivers Walkway
Role: Senior Project Engineer/Project Manager
Project Value: $300k
Completion Date June 2025
TAP04 - REDFERN STATION - SYDNEY, NSW, AUSTRALIA
• Provided full time project engineering and project management for the civil construction and project delivery team.
• Scope of project was to deliver a 1.5milIion dollar civil package, inclusive of structural civil infrastructure and underground CSR routes.
• Responsible for all levels of commercial deliverables; managing supplier accounts, processing progress claims, tracking and maintaining costs/budgets.
• Developed and implemented all site SWMS.
Maintain project quality requirements, ITCs, ITPs, redline drawings.
SYDNEY METRO CENTRAL STATION MAIN WORKS — SYDNEY, NSW, AUSTRALIA
• Provided client with onsite Project Engineer and Project Management services for the Central Walk Station excavation below Platforms 16 to 23.
• Creation and implementation of project databases to track and forecast moving schedules and budgets.
• Responsible for co-ordinational management between project set requirements (client dictated) and the temporary work designers.
• Responsible for providing accurate take off estimates.
• Packaged summaries for complex construction sequences for contractor self-performed works.
• Delivered daily annotated site reports with recommendations for use by contractor and senior project management, with weekly reported projections on the health of project schedule and budget.
SITE C CLEAN ENERGY PROJECT - FORT ST JOHN, BC, CANADA
The Peace River hydroelectric dam project is one of the biggest construction projects in Canada, where Tetra Tech provided onsite engineering construction services to the owner in various roles, some of which are summarized below.
Provided the client with onsite geotechnical support for numerous site access roads and road construction projects associated to the Site C project.
• Complete understanding of drawings, specifications, geotechnical reports and supporting specifications for entire scope of work.
• Initiated non-conformance reports and proposed remedial actions.
• Inspected construction for a critical 25m embankment fill and installed/monitored instrumentation for slope stability
to determine allowable rate of construction based on measured pore water pressure and slope movements.
• Oversaw construction for 2km of in-river road construction produced from alluvial gravels, inspected colluvium excavation and inspected in-river sub grade.
Produced variety of formal geotechnical reports and recommendations.