Summary
Overview
Work History
Education
Skills
Accomplishments
Languages
Personal Qualifications
Certified Qualifications
Field Experiences
Health
Training
Personal Information
Affiliations
Certification
Timeline
Generic

Unduk Samosir

Southern River,Australia

Summary

I am currently working for Newmont Boddington Gold as Senior Mine Planning Engineer. The main responsibilities are Reserve Resource Reporting that includes pit optimization, pit designing, reserve and resource estimation and writing related reports. The role is also responsible for strategic planning for pit expansion, waste dump expansion and concurrent reclamation. Before moved to Newmont Boddington Gold I worked for MMG Sepon in Laos (originally Lane Xang Minerals Limited, Oxiana) for 5 years from 2006 to 2011 with last position as Principal Mining Engineer. The main task was to lead and coordinate the mining engineering team to work on mine planning tasks such as pit optimization, pit design, pit infrastructures design, mine schedule, mining budget and pit expansion planning. I worked for Newmont Nusa Tenggara Batu Hijau for 5 years from 2001 to 2006. I had been in several roles starting as a production engineer and my last position was Senior Specialist Engineer. My main job was to work with short term section in providing high quality service to operation. As a Drill and Blast Engineer, I was also involved in mine to mill through put improvement project which focused on blast fragmentation and material blending. I spent my first 4.5 years worked for Newmont Minahasa Raya Sulawesi since May 1997 until November 2001. I started as fresh graduate engineer and had been rotated to some others roles during the period.

Professional in mine planning with strong analytical and problem-solving skills. Proven record in designing efficient and safe mining operations, optimizing resource use, and ensuring regulatory compliance. Known for fostering team collaboration and adapting to evolving project demands. Skilled in software tools like AutoCAD, Surpac, and mine scheduling software.

Overview

30
30
years of professional experience
1
1
Certification

Work History

Senior Mine Planning Engineer

Newmont Boddington Gold
07.2011 - Current
  • Lead and coordinate long term planning section
  • Reserve/NRM optimization, shell selection, pit design, and reserve reporting
  • Laybacks designs for business plan mine schedule
  • Waste dump stage design
  • Strategic planning that includes pit and dump sequence and pit and dump expansions plan
  • Concurrent reclamation planning
  • Produced pit optimization, pit design and reserves estimation for 2016, 2017 and 2018 Reserves Resource for Newmont Boddington Gold
  • Produced plans and provided technical assistance for waste dump expansion in 2016
  • Worked together with consultant to establish Minemax Scheduler model that suit site need
  • Worked with Reginal Office to establish Concurrent Rehabilitation model for the site

Principal Mine Engineer

MMG Sepon (originally Lane Xang Minerals Limited, Oxiana)
09.2009 - 06.2011
  • Lead and coordinate mine technical service team to foresee issues and provide technical services
  • Produce and review mining forecast and budget (both for mining schedule and financial)
  • Pit optimization (Au and Cu pit), financial analysis, shell selection for final pit and cut back
  • Final pit and cut back design
  • Waste dump design, mid term and long term
  • Produce LOM mine schedule (Au and Cu)
  • Work together with related parties and provide technical expertise in prior to commencing an open pit mining
  • Delivered Thengkam Cu pit optimization @ $3/lb
  • Produced Pit, dump, and infrastructures design @ $3/lb scenario which currently
  • Calculated and drafted Au and Cu 2010 reserves statement
  • Produced 2010 Au LOM mining schedule including all oxide ore potentials to know the estimate Au mine life for strategic decision making on what to do for plant shut down when the reserves is completely depleted
  • Mill feed and economic cut of grades for Au and Cu ore for 2010
  • Whittle optimization on Houay Yeng Au pit at various what if scenarios based on different Au prices and wall slope recommendation

Senior Mine Planning Engineer

MMG Sepon (originally Lane Xang Minerals Limited, Oxiana)
02.2007 - 08.2009
  • Produce budget and LOM mine schedule
  • Interim and final limit designing with geotechnical criteria
  • Pit stages design to suit the LOM mine schedule
  • Gold and copper pits optimization
  • Waste dump design, mid term and long term
  • Produce 18-month mine schedule
  • Produced 2009 Cu LOM mining schedules with different scenarios to accommodate process plant expansion from 60K to 83K tonnes Cu plate produced per annum
  • Provided recommendation to manager regarding mining capacity required in 2010-2011 in relation to Cu plant expansion
  • Produced 2009 Au and Cu cut of grade draft
  • Re-optimized all Au pits due to 2009 updated Au ore models and increasing Au prizes
  • Provided recommendation regarding mining capacity required, timing, and risks in mining D1-D3 Khanong cut backs which are very high stripping ratio in order to be able to expose the chalcocytic ore on time
  • Successfully provided mine technical services with a very limited supervision to support Mining Manager
  • There was a very limited work force available on site due to resignation of mine planning superintendent and senior engineer
  • Provide on job training and coaching to local engineers

Senior Specialist Engineer Short Term Planning

PT NEWMONT Nusa Tenggara
03.2006 - 07.2006
  • Lead and coordinate engineers in short term planning section (production, drill and blast, ore control, wall control, project, dispatch, dumping, and survey) to provide guidance to operation
  • Inter department coordinating role
  • Short term is the central key section to provide guidance and information to stake holders such as mine operation, process operation, and project
  • Intensively involved in mine to mill improvement
  • Intensively involved in blast efficiency project
  • Provide training and guidance for junior engineer development
  • Started to be exposed to how to lead such a big team with various different tasks

Senior Engineer Short Term Planning

PT NEWMONT Nusa Tenggara
03.2005 - 02.2006
  • Lead and coordinate production engineer, drill and blast, ore control, wall control, and project engineer, Produce weekly mine plan and 12-month mine schedule
  • Supervise and control on wall blasting, wall clean up, and wall achievement
  • Supervise administrative work done by production engineer, drill and blast, and ore control engineer in reporting, data, and design
  • Coached and developed some junior engineers in short term planning section
  • Successfully lead and trained junior engineers to be able to run their jobs as production engineer, short term engineer, and drill blast engineer
  • Actively involved in mine to mill improvement by providing high quality services and inputs to stake holders

Mid Term Planning Engineer

PT NEWMONT Nusa Tenggara
10.2004 - 03.2005
  • 12-month and quarterly waste dump schedule to suit dry season and long term waste dumping plan
  • 12-month and quarterly stockpile schedule to suit mine schedule, dry season project, and long term waste dumping plan
  • Monthly and yearly truck forecast: calculate truck requirement for a given mine schedule
  • Monthly truck reconciliation
  • Interim limit updating to follow the inter ramp and bench face angle and phase design to suit mine schedule and long term design
  • Provide support in creating monthly forecast when Senior MTP Engineer on leave
  • Determining monthly mill cut off to fulfill the crusher and stockpile requirement
  • Provide support for 3D mid-term design : stockpile, ramps, and dumps
  • Working in team for EFH initiatives
  • Intensively involved in supporting operation to aggressively achieve production target

Drill Blast Engineer

PT NEWMONT Nusa Tenggara
04.2003 - 09.2004
  • Provide blast pattern design
  • Shot tie-up (timing, shot direction, etc)
  • Pre & post blast documentation for analyses
  • Data base daily updating: broken muck inventory, blast boundary
  • Working in team for SAG through put improvement
  • Working in team for achieving monthly metal target
  • Give input to drill and blast production for daily and weekly drilling scheduling
  • Weekly and monthly drilling plan
  • Providing data for quarterly forecast of bulk explosive and accessories
  • Providing support for some blasting trials (shot with various blend, VOD test, wall blast)
  • Coaching and leading junior drill&blast engineers and students
  • Intensively involved in mine to mill blasting trials in order to improve mill trough put by applying the right powder factor and firing timing to a blast
  • Provide inputs to Mine Planning Superintendent to produce a blasting cook book as guide to daily blasting design
  • Intensively involved in supporting operation to aggressively achieve production target by providing information to other stake holders

Production Engineer

PT NEWMONT Nusa Tenggara
11.2001 - 03.2003
  • Fulfill the demand of mill/ crusher
  • Prepare and host morning production daily meeting
  • Coordinate with ore control geologist, surveyor, ore control engineer to provide service and information in day to day activity
  • Discussing issues and solving problem with operation foreman
  • Conveying all the very updated information and issues to all related person
  • Monitoring dispatch compliance and give input to dispatcher
  • Designs for projects: dump, road, and slope, which will be fed to CAES dozer
  • Successfully provide help in creating constructive communication between planning and production in the field

Reclamation Project Engineer

PT NEWMONT Minahasa Raya
07.2001 - 11.2001
  • Reclamation schedule and plan
  • Top soil stock pile management
  • Plantation and maintenance supervision
  • Relieving senior mining engineer

Mine Planning Engineer

PT NEWMONT Minahasa Raya
01.1999 - 07.2001
  • Short term plan, weekly and monthly
  • Hosting regular planning meeting, weekly and monthly
  • Pit design review and adjustment to follow the updated grade control information
  • Dumping design
  • Road design
  • 12-month leach ore schedule to leach pad
  • Leach ore stacking plan, weekly and monthly
  • Working in team with reclamation section for mine closure

Drill and Blast Engineer

PT NEWMONT Minahasa Raya
01.1998 - 12.1998
  • Blast block design
  • Pattern design
  • Shot tie up design
  • Blast performance review, pre and post blast assessment
  • Blasting cost control
  • Explosive inventory control
  • Monthly and weekly drill and blast schedule
  • Mine production reporting
  • Pit limit and wall control: toe, crest, and batter slope

Mine Project Engineer

PT NEWMONT Minahasa Raya
05.1997 - 12.1997
  • Data base, reporting, and look after the daily production bank data
  • Rental equipment control: data base, field supervision
  • Pit drainage
  • Waste dump and garbage area
  • Monthly accrual
  • Road maintenance
  • Waste dump monitoring
  • Stockpile and mill support

Thesis Student

PT. Kaltim Prima Coal
06.1996 - 09.1996
  • Loading methodology analyses: Single Side and Double Side Loading
  • Trucking and equipment scheduling
  • General introduction to operation
  • General introduction to drilling and blasting activities

Apprentice Student

PT Bukit Asam Tanjung Enim
06.1995 - 09.1995
  • Pit grainage project Mud Removing options study (Slurry Pumping vs Load and Haul)
  • General introduction to Bucket Wheel Excavator operation

Education

Bachelor Degree - Mining Engineering

Sriwijaya University
01.1996

Skills

  • MineSight
  • Whittle pit optimisation
  • Blasting softwares
  • Shot Plus-I
  • Shotplan
  • Microsoft Office
  • Word
  • Excel
  • PowerPoint
  • Cost estimating
  • Cost estimation

Accomplishments

- Implement best practice in Reserve and Resource Reporting for Boddington since 2011


- Optimise Boddington Reserve and Resource Addition to capitalise the modifying factor upsides


- Establish Boddington Pit and Dump Stage designs and sequence to bring forward value and maximise lOM economics

Languages

English
Bahasa Indonesia

Personal Qualifications

Bachelor Degree in Mining Engineering, Sriwijaya University - Indonesia, 01/01/96

Certified Qualifications

  • Efficient Blasting Techniques, Dyno Nobel, Indonesia, 1998
  • Applied Rock Mechanic, PT.Freeport, 2001
  • Leadership course, PT.NNT, 2003
  • Mine Supervisory Course, Indonesia, 2005

Field Experiences

  • KGCM, Kalgoorlie-Mine (WA), 2004, Site Visit
  • PT.Freeport, Tembagapura, Indonesia, 2001, Training
  • Newmont Gold Co., Carlin, Twin Creek, Lone Tree, 1999, Site Visit for Heap Leach Study
  • PT.Kaltim Prima Coal, East Kalimantan-Indonesia, 1996, Thesis
  • PT.Bukit Asam, Tanjung Enim-Indonesia, 1996, Apprentice Job
  • PT.Bukit Asam, Ombilin-Indonesia, 1994, Apprentice Job
  • PLTA Singkarak Tunnel Project, West Sumatera-Indonesia, 1994, Rock Mechanic Study

Health

Excellent

Training

  • Risk Management Course, Dupont, Sepon, 2010
  • Visible leadership training, Dupont, Sepon, 2010
  • Mine Sight Conference, Mintec, Bangkok, 2009
  • Mine Supervisory Training, PT.NNT, Batu Hijau, 2005
  • Mine Sight Scheduling, Mectech, Perth-Australia, 2004
  • DDI Packages (leadership), In House –PTNNT, Batu Hijau, 2003
  • Applied Rock Mechanic Course, ITB & PT FI, Jayapura-Indonesia, 2001
  • Mine Planning Software Training, Newmont Gold Co., Denver-Colorado, 1999
  • Heap Leach Training, Newmont Gold Co., Carlin-Nevada, 1999
  • Efficient Blasting Techniques, Dyno Nobel, Balikpapan-Indonesia, 1998

Personal Information

  • Citizenship: Indonesian
  • Date of Birth: 08/16/72
  • Gender: Male
  • Marital Status: Married

Affiliations

  • SME

Certification

- SME registered member

- Newmont Qualified Person

Timeline

Senior Mine Planning Engineer

Newmont Boddington Gold
07.2011 - Current

Principal Mine Engineer

MMG Sepon (originally Lane Xang Minerals Limited, Oxiana)
09.2009 - 06.2011

Senior Mine Planning Engineer

MMG Sepon (originally Lane Xang Minerals Limited, Oxiana)
02.2007 - 08.2009

Senior Specialist Engineer Short Term Planning

PT NEWMONT Nusa Tenggara
03.2006 - 07.2006

Senior Engineer Short Term Planning

PT NEWMONT Nusa Tenggara
03.2005 - 02.2006

Mid Term Planning Engineer

PT NEWMONT Nusa Tenggara
10.2004 - 03.2005

Drill Blast Engineer

PT NEWMONT Nusa Tenggara
04.2003 - 09.2004

Production Engineer

PT NEWMONT Nusa Tenggara
11.2001 - 03.2003

Reclamation Project Engineer

PT NEWMONT Minahasa Raya
07.2001 - 11.2001

Mine Planning Engineer

PT NEWMONT Minahasa Raya
01.1999 - 07.2001

Drill and Blast Engineer

PT NEWMONT Minahasa Raya
01.1998 - 12.1998

Mine Project Engineer

PT NEWMONT Minahasa Raya
05.1997 - 12.1997

Thesis Student

PT. Kaltim Prima Coal
06.1996 - 09.1996

Apprentice Student

PT Bukit Asam Tanjung Enim
06.1995 - 09.1995

Bachelor Degree - Mining Engineering

Sriwijaya University
Unduk Samosir