Summary
Overview
Work History
Education
Skills
Personal Information
Jobskills
Attributes
Certification
Timeline
Generic

Lucian Marius Olah

Sydney Olympic Park,NSW

Summary

Adept Fitter with a proven track record of enhancing operational efficiency, notably at PGSR/Toshiba. Specializes in flange management and mechanical inspections, demonstrating exceptional problem-solving skills and a commitment to safety. Expert in preventative maintenance and mechanical isolation, contributing to significant project successes. Team-minded Mechanical Fitter offering many years of experience in parts assembly and precise measuring. Follows safety procedures and committed to helping others to ensure project completion. Self-motivated individual boasting a career spent reviewing project drawings, assembling parts and resolving issues. Energetic with a great personality and a desire to help train new employees. A communicative Mechanical Fitter known for being a reserved presence in deadline-driven settings. Mechanical Fitter with strong background completing various manual tasks to work on equipment. Successfully followed work orders, drawings, and instructions for precise results. Demonstrated gift for working efficiently to complete work on time.

Overview

35
35
years of professional experience
1
1
Certification

Work History

Fitter

PGSR/Toshiba
08.2023 - 11.2023
  • Outage at Bayswater Powerstation of Unit 1
  • Working on the steam turbines, removing of covers, cross over pipework, undoing studs/nuts using Hytorq equipment, removing of rotors, diaphrams, precission measuring of packers, shims and recording values
  • Stoning of sealing faces after inspection and put it all back together

Fitter

Scout/Randstand
06.2023 - 08.2023
  • Contracted to Viva Energy where I performed breakdown, planned and minor project works at the Gore Bay site (Sydney Harbour) where bulk fuel tankers came in, docked and unloaded their fuels
  • Work included removal of redundanted pipes, valves, removing and installing new landing valves for fire hydrands site wide, Removal/installing new safety valves, installing new non slip treads for stairs and other safety improvents site wide

Fitter

Austunnel
01.2023 - 06.2023
  • Working on the Western Sydney Airport Metro Project contracted to CPBG
  • Assembly of the two tunnel boring machines and associated gantries
  • Mechanical fitting, rigging, of equipment, use of telescopic handler installation of Service Pipework, cooling tower, air compressors is all part of the scope
  • Working with Herrenkncht( supplier of the TBMs and gantries) as per their directions

Fitter

M2P Engineering
05.2022 - 12.2022
  • Working on an underground crusher/conveyor expansion project in Orange
  • Installation, modification, pre commissioning and commissing of crusher, chutes, apron feeders, fire supression piping, service air and water piping and 2 conveyors and one transfer station
  • Project finished

Technician

Broadspectrum
06.2020 - 04.2022
  • Corrective, planned maintenance, project work and on call work on Sydney Water assets and treatment plants
  • Pumps, valves, Non return valves, mixers, dosing pumps are some of the equipment that I worked on
  • Minor projects to improve performance of assets

Fitter

Various Companies
09.2019 - 05.2020
  • Cadia Gold mine (Orange, NSW), shutdown works, Visy Paper and Pulp (Tumut, NSW) Annual shut down works, Australian Papermill (Maryvale, VIC) Shutdown works

Fitter

Austunnel
06.2019 - 09.2019
  • Conveyor maintenance and breakdown/installation on the Sydney Metro Rail 2 Tunnels

Technician

2XM Recruitment
12.2018 - 06.2019
  • Overhaul of brake components and associated gear for Queensland Rail, Aurizon, Downer Rail
  • Stripping of unit, cleaning, sand blasting, assess for damage, wear as per job order
  • Testing of unit and completing test sheet and sign off once finished

Fitter

Downergroup
07.2017 - 12.2018
  • Combined Cycle Power Plant mechanical works on the Ichtys LNG Project in Darwin, N.T
  • Flange Management, Authorised Gas Tester, Laser Alignments, Fin Fans set up and tip clearances/pitch
  • Mechanical Inspections and Isolations

Fitter

Various Contractors
05.2016 - 07.2017
  • Shutdown works at Shell (QGC) Central Processing Plant outside of Dalby, Qld
  • Santos at Curtis Island, Condemine Powerstation, Olympic Dam in South Australia and Goonyella in Mooranbah, Qld

Fitter

Bechtel
08.2014 - 04.2016
  • Flange management, valve installation, Fin Fans alignments and adjustments
  • Mechanical Isolations
  • Compressors dry gas seals install
  • Inspections of vessels and sign offs
  • APLNG Project Curtis Island, Queensland

Fitter

Fluor Corporation
04.2014 - 08.2014
  • Permit Holder on the GLNG Project Roma, QLD Mechanical isolations
  • Well pads hook up of spools, PSV install, vessel inspection, and flange management, torque verification, participate in walk downs and document sign offs

Commissioning Technician

Kentz Constructors
04.2013 - 03.2014
  • Working on the QCLNG project in Chinchilla
  • QGC Permit Holder, Verification of work, inspection, sign offs, raising of ITR’s, alignments witnessing and signing off as QGC,s representative
  • Mechanical Isolations, Commissioning of the Field Compression Stations

Fitter

Woodgroup
11.2012 - 04.2013
  • Everyday maintenance, Mechanical isolations, shutdowns and breakdowns at Caltex Refinery, Kurnell, Sydney

Fitter

Monadelphous Engineering
09.2010 - 11.2012
  • Working on the Pluto Project in Karratha W.A
  • Construction of a Gas plant
  • Mechanical Isolations, Psv install and sign offs, flange management
  • Permit Holder for Woodside Rotating equipment alignment and sign offs

Fitter

Q.M.M.
02.2010 - 09.2010
  • Construction on mine site (Olympic Dam) of modules to go underground to be installed and fixed plant maintenance
  • Surface as well as underground
  • Conveyor and shaft maintenance

Fitter

Accurate Recruitment
06.2009 - 02.2010
  • Contracted to Bombardier to repair/modification of gear units, oil sampling, vibration analysis, backlash checks, testing in Test rig

Fitter

Work Pac
07.2008 - 06.2009
  • Installation of machinery (Smoke duct) for the Clem7 Tunnel
  • Maintenance on the tunnel boring machines and conveyor works

Fitter

Adecco Maintenance
11.2007 - 07.2008
  • Every day maintenance in a brick making factory preventative and mainly breakdown maintenance
  • Looking from the crusher through the hammer mills, out to the extruder, setting and through the dryers kiln and then dehacked and palletized

Fitter

Siteforce
10.2006 - 11.2007
  • Dismantling of process plant on mine site in Far North Queensland to be relocated in Africa
  • Working underground on a conveyors finish crusher and installing and commissioning in West
  • Australia

Fitter

Allan Industries
12.2005 - 10.2006
  • Installation of conveyors on construction site for Siemens Dematic (Woolworths distribution center)
  • Crane
  • Installation of SRM cranes and EPRM’s and Commissioning

Fitter

Work Pac
01.2005 - 12.2005
  • Contract at Golden Circle as a maintenance fitter performing preventative maintenance, shut down and breakdown work over 3 rotating shifts

Fitter

Visy Board
02.2004 - 12.2004
  • Preventative maintenance of high speed converting machines such rotary die cutters, flexo folder gluers, tie machines, Strapping machines and pallet conveyors and weekly shutdowns

Fitter

Skilled Engineering
09.2002 - 02.2004
  • Working at a food manufacturing (frozen meals) company looking after production and performing preventative maintenance, and writing out work procedures
  • Experience with SCADA and BMS systems and weekly and annual shutdowns

Fitter

Qld. Rail
03.1996 - 06.2002
  • Working on QR rolling stock wagons, steam locomotives at Ipswich Workshops and at Redbank Workshops working on the E.M.U
  • Overhaul program
  • Running repairs on rollingstock
  • Brake repiping and upgrading

Fitter

Waycon Services
09.1994 - 02.1996
  • Shutdown work, special projects, preventative maintenance, machinery installation, commissioning of machinery
  • Companies where I have Worked at include; News Limited (Daily Telegraph), Weston’s Milling Sydney Printers (The Sydney Morning Herald)

Fitter

Ford Motor Company
01.1989 - 09.1994
  • Started my apprenticeship as a Fitter and Turner
  • Preventative/breakdown maintenance

Education

Dogging -

CSTC
01.2007

EWP -

CSTC
01.2007

Training for Emergencies -

Queensland Rail
01.1999

Fire Extinguisher Training -

Queensland Rail
01.1998

Certificate of Attainment - Security Officer/Crowd Controller

Security Institute
01.1996

Certificate Proficiency - Fitting Turning

Mt.Druitt T.A.F.E.
01.1993

High School - School Certificate

Mt.Druitt High School
01.1987

Skills

  • Spools and Valves installation
  • Rotating Equipment Alignments
  • Authorised Gas Tester
  • Flange Management
  • Mechanical Inspections
  • Mechanical Isolation
  • Permit Holder
  • Preventative maintenance
  • Air tools maintenance and repairs
  • Pumps (maintenance and repair)
  • Injection moulding (maintenance and breakdown)
  • Dangerous goods handling and identification course
  • Fire Extinguisher system (training)
  • High Risk Elevated Work Platform
  • High Risk Dogging
  • Telehandler License
  • Construction in Greenfield and Brownfield
  • Overland Conveyors

Personal Information

Date of Birth: 07/08/71

Jobskills

  • Spools and Valves installation
  • Rotating Equipment Alignments
  • Authorised Gas Tester
  • Flange Management
  • Mechanical Inspections
  • Mechanical Isolation
  • Permit Holder
  • Preventative maintenance
  • Air tools maintenance and repairs
  • Pumps (maintenance and repair)
  • Injection moulding (maintenance and breakdown)
  • Dangerous goods handling and identification course
  • Fire Extinguisher system (training)
  • High Risk Elevated Work Platform
  • High Risk Dogging
  • Telehandler License
  • Construction in Greenfield and Brownfield
  • Overland Conveyors

Attributes

  • Able to work in a team environment
  • Highly motivated
  • Desire to succeed and to be successful
  • Highly Trainable
  • High organisational skills
  • Team Leader
  • Able to carry out instructions and tasks efficiently
  • Safe and conscientious worker

Certification

  • National Licence To Perform High Risk Work (WP and DG) expiry Dec 2026
  • Telescopic Handler (TSH) Gold Card expiry 02/2026
  • Construction Card (Wite Card) issued 10/2012
  • Isolate and Access Plant (RIISAM202D) issued 07/2020
  • Work Safely at Heights (RIIWHS204E) issued Dec 2021
  • Perform Inspections (MEM15004) issued 03/2022

Timeline

Fitter

PGSR/Toshiba
08.2023 - 11.2023

Fitter

Scout/Randstand
06.2023 - 08.2023

Fitter

Austunnel
01.2023 - 06.2023

Fitter

M2P Engineering
05.2022 - 12.2022

Technician

Broadspectrum
06.2020 - 04.2022

Fitter

Various Companies
09.2019 - 05.2020

Fitter

Austunnel
06.2019 - 09.2019

Technician

2XM Recruitment
12.2018 - 06.2019

Fitter

Downergroup
07.2017 - 12.2018

Fitter

Various Contractors
05.2016 - 07.2017

Fitter

Bechtel
08.2014 - 04.2016

Fitter

Fluor Corporation
04.2014 - 08.2014

Commissioning Technician

Kentz Constructors
04.2013 - 03.2014

Fitter

Woodgroup
11.2012 - 04.2013

Fitter

Monadelphous Engineering
09.2010 - 11.2012

Fitter

Q.M.M.
02.2010 - 09.2010

Fitter

Accurate Recruitment
06.2009 - 02.2010

Fitter

Work Pac
07.2008 - 06.2009

Fitter

Adecco Maintenance
11.2007 - 07.2008

Fitter

Siteforce
10.2006 - 11.2007

Fitter

Allan Industries
12.2005 - 10.2006

Fitter

Work Pac
01.2005 - 12.2005

Fitter

Visy Board
02.2004 - 12.2004

Fitter

Skilled Engineering
09.2002 - 02.2004

Fitter

Qld. Rail
03.1996 - 06.2002

Fitter

Waycon Services
09.1994 - 02.1996

Fitter

Ford Motor Company
01.1989 - 09.1994

Dogging -

CSTC

EWP -

CSTC

Training for Emergencies -

Queensland Rail

Fire Extinguisher Training -

Queensland Rail

Certificate of Attainment - Security Officer/Crowd Controller

Security Institute

Certificate Proficiency - Fitting Turning

Mt.Druitt T.A.F.E.

High School - School Certificate

Mt.Druitt High School
Lucian Marius Olah