Summary
Overview
Work History
Education
Skills
Timeline
Generic

Paul Brayan Piedra Uriarte

Homebush,NSW

Summary

Team-minded field installer proficient in all aspects of installing, repairing and maintaining air conditioning systems in homes and business. Demonstrated expertise in generating referrals by providing exceptional service and support to all customers. Strong relationship-building and project management abilities. To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.

Overview

11
11
years of professional experience

Work History

Air Conditioning Installer

Air21 Installation Services PTY LTD
07.2023 - Current
  • Collaborated with team members to complete large-scale installations, maximizing productivity and efficiency.
  • Adhered to safety regulations and protocols while performing tasks, minimizing risk of accidents or injuries on the job site.
  • Filled out detailed work orders for each job completed.
  • Collaborated with team members on large-scale projects, ensuring timely completion and high-quality results.
  • Worked overtime, holidays and weekends to accommodate company needs.
  • Consulted with project management during group installations.

Air Conditioning Installer

Air Tite Installations PTY LTD
02.2022 - 07.2023
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Demonstrated flexibility with shifting responsibilities based on project needs, contributing to overall productivity levels.
  • Optimized material usage through accurate calculations of duct dimensions, preventing waste and unnecessary expenses.
  • Reduced project completion times by efficiently collaborating with team members in the installation process.

Air Conditioning Installer

East Coast AC Pty Ltd
03.2021 - 01.2022
  • Maintained high-quality workmanship through attention to detail and adherence to industry standards.
  • Installed new air conditioning, heating and refrigeration systems according to manufacturer's specifications and local codes.
  • Assisted in maintenance, repair and installation of ventilation systems.

Air Conditioning Installer

AMAZE AIR MECHANICAL SERVICES PTY  LTD
01.2021 - 03.2021
  • Understood and followed verbal and written instructions to complete work correctly.
  • Worked alongside team to accomplish work goals according to schedule.
  • Loaded, unloaded, and moved material to and from storage and production areas.

Air Conditioning Installer

LAG GROUP PTY LTD
09.2020 - 12.2020
  • Optimized material usage through accurate calculations of duct dimensions, preventing waste and unnecessary expenses.
  • Reduced project completion times by efficiently collaborating with team members in the installation process.

Air Conditioning Installer

ESTRADA QUALITY PTY LDT
12.2016 - 09.2020
  • Communicated with supervisors to gather system malfunctions symptoms and locations for diagnosis and correction.
  • Worked alongside team to accomplish work goals according to schedule.
  • Increased overall project quality by conducting thorough inspections of installed ducts, ensuring proper sealing and insulation.
  • Collaborated with team members on large-scale projects, ensuring timely completion and high-quality results.

Cleaner

Civil Cleaning Pty Ltd
07.2016 - 07.2016
  • Cleaned and sanitized bathrooms, kitchens and other similar areas according to established protocols.
  • Enhanced workplace cleanliness by performing thorough daily cleaning tasks, including sweeping, mopping, and dusting.
  • Removed trash, debris and other waste materials from premises.
  • Used time management and efficient cleaning methods to meet deadlines.

Production Mechanic

“Diesel” Repairs Bagua Grande
02.2013 - 03.2016
  • Implemented quality control measures during routine maintenance checks, maintaining high standards across all machinery operations.
  • Supported continuous improvement efforts through close collaboration with engineering teams on process enhancements.
  • Conducted thorough inspections of machinery to identify wear or damage, scheduling necessary repairs or replacements accordingly.
  • Coordinated with external vendors for specialized repair services when required while minimizing costs and downtime impact on production schedules.

Education

Graduate Diploma - Production Mechanics

SENATI National Service of Training in Industria
PERU
12.2012

High School Diploma -

I.E. Alejandro Sanchez Arteaga No. 16210
Peru
12.2008

Skills

  • Power tool use
  • Hand tool use
  • Machinery Operation
  • Roof installations
  • Safety practices
  • Duct Sizing and Design

Timeline

Air Conditioning Installer

Air21 Installation Services PTY LTD
07.2023 - Current

Air Conditioning Installer

Air Tite Installations PTY LTD
02.2022 - 07.2023

Air Conditioning Installer

East Coast AC Pty Ltd
03.2021 - 01.2022

Air Conditioning Installer

AMAZE AIR MECHANICAL SERVICES PTY  LTD
01.2021 - 03.2021

Air Conditioning Installer

LAG GROUP PTY LTD
09.2020 - 12.2020

Air Conditioning Installer

ESTRADA QUALITY PTY LDT
12.2016 - 09.2020

Cleaner

Civil Cleaning Pty Ltd
07.2016 - 07.2016

Production Mechanic

“Diesel” Repairs Bagua Grande
02.2013 - 03.2016

Graduate Diploma - Production Mechanics

SENATI National Service of Training in Industria

High School Diploma -

I.E. Alejandro Sanchez Arteaga No. 16210
Paul Brayan Piedra Uriarte