VIC CB-U Licence:
Project Engineer - Timber EelNet, Lattice Steel System and Cladding at Tunnel Portals
Site Establishment:
Design:
Procurement:
Logistics:
Supervision:
Commercial:
I was apart of a team that was brought on by CDC (Canberra Data Centres) to help assit Total Construction getting the project to completion.
Reviewing and Co-orindating Architectural Fit Out i.e. Doors, Door Hardware, Tiling, Plastering, Paint, Security Interface and other service trade fitoff.
Supervison for a complex fitout start to finish of multiple stages within the project (Note this project was in Live Operating Pharmaceutical Facility).
Detailed Demoliton of Live Electrical, sandwhich panel and structural Steel.
Co-ordinate Install of Large complex pharamsuitacal production equipment (Cranage/Rigging and finishes) i.e. Building the project around the equiopment post install as the eqipiment was larger than the rooms.
Co-ordinate Rough-In, Sandwhich Panel Install, Epoxy Flooring, Joinery Install, Caulking and Detailed Cleaning.
Foreman - For both of the two Maximum Secuirty Management Units (Celled Units 22 Cells Each).
Co-Ordinated two buildings from Metal Deck Roofing, Internal Framing, Roughin Corordination/Clash Resolution, Fire Rating, Acoustics, Joinery Install, Service/Security Fit Off to Final Commisioning and Defect Management for the entire proejct.
https://besixwatpac.com/projects/secure-facilities/dame-phyllis-frost-centre
Precast Shop Drawing Doc Control
Precast Ordering Doc Control/Scheduling Panel Ordering
Precast QA on Delivery
Precast Install Supervision
Structural Steel Manufacturing Inspections
Structural Steel Shop Drawing Doc Control
Balustrade Shop Drawing Doc Control
External Foreman - Waterproofing, Balustrade, Paving and Landscaping (Soft and Hard).
https://besixwatpac.com/projects/education/wurun-senior-campus
Tenders Included - Dame Phyliss Frost Centre, Wantirna Aged Care, MEL12 Data Centre, Berwick Train Station Car Park, Land 400 - Armoured Vechiles, NCIS South Australia.
Assist VM of Major structure changes for Fitzroy Gasworks (Concrete to Hybrid Structural Steel Concrete System).
Programming
QA Doc Control i.e. Concrete Test Reportsd/ PT Stressing, Development of finishes trades ITPs with referencing to Australian Standards. Running Inductions Plant and Equipment Inductions/Registers Reviewing and Updating Project Project Safety Management Plans Junior Foreman Role for Landscape Package
Running Inductions
Plant and Equipment Inductions/Registers
Reviewing and Updating Project Project Safety Management Plans
Junior Foreman Role for Landscape Package
https://besixwatpac.com/projects/retirement-living-and-aged-care/jewish-care-st-kilda-road-senior-living-and-community-precinct